The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
The Becker County Drainage Ditch Inventory and Inspection Project is a collaborative, multifaceted approach to develop a GIS-based drainage ditch inventory database system, inventory the current conditions of judicial ditches and adjacent land, and target and prioritize portions of each ditch system for restorative or protective measures.
Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.
The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.
Impaired waters in the Red Lake River 1W1P are categorized into management classes to target impaired waters that are closest to meeting water quality standards and to protect unimpaired waters close to becoming impaired. Management areas targeted in 2018 and 2019 include the Little Black River, Black River, County Ditch 96, the Red Lake River between Thief River and Crookston, Burnham Creek, and Grand Marais Creek.
As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
This Phase 5 continuation of the Wild Rice Shoreland Protection Program will utilize permanent conservation easements to protect 500 acres, translating to approximately 3 miles of wild rice shoreland habitat. Sites are selected through an integrative ranking process that considers development risk, surrounding land use, habitat value, and numerous other criteria. BWSR will utilize the RIM Easement process in partnership with 12 local SWCDs within the Northern Forest and Forest/Prairie Transition Sections during the appropriation term.