The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
The north-central Minnesota counties of Cass and Hubbard share large portions of the Crow Wing River, Leech and Upper Mississippi Watersheds, all of which play an important role in providing clean drinking water to over one million Minnesota residents. Each county assumes the responsibility of inspecting and evaluating the judicial and county ditch systems that drain directly into these watersheds. The two counties together share two judicial ditch systems and combined have an additional 42 ditches within their borders.
Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.
The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.
As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.
The purpose of this project is to provide a new shared position in southeast Minnesota which will accelerate the adoption of soil health practices by leveraging the existing efforts of the National Resources Conservation Service and other organizations.
The lack of sewage treatment in many small communities in Southeast Minnesota is causing surface water and groundwater pollution. Ten of these small communities will be the target of the technical assistance provided by this project. These communities have community or individual straight pipes which are discharging raw sewage directly into the environment, surfacing sewage, or have sewage contaminating groundwater.
A new GIS technician will help prioritize and target conservation activities and protection strategies in nine north-central Minnesota counties. The GIS technician will create GIS products, assessments, and watershed analysis to identify the high priority areas in each County or watershed in need of protection or restoration using all available data, including LiDAR, soils, land use, completed WRAPS and other datasets. These areas will then be targeted for future resource management efforts, Clean Water Fund projects, and additional conservation activities.
Fourteen permanent RIM Easements on 766 acres of high quality, riparian and forested habitat have been recorded and will provide lasting wildlife habitat. Attempts were made to acquire three tracts in fee title that would have relied on this funding. The owner of one tract rejected an offer of the certified appraised value. Acquisition attempts on the other two tracts were discontinued when it became apparent that the planned use of the land as DNR Wildlife Management Area would be incompatible with local government plans for future municipal growth.
Twenty six easements protecting 1,173.3 were recorded which exceeded the original proposal by 173 acres (15%). 11.6 miles of shoreline were protected which exceeded the 8 acre goal by 30%. Total expenditure was $1,355,000 which was 17% lower than originally budgeted. No fee-title land acquisition opportunities on wild rice lakes that fit within DNR and other government agency land plans were available during this time period thus DU did not expend any of the $100,000 budgeted for fee-title acquisition. Instead the program focused on RIM easements.