The goal of this project is to achieve a 10% reduction in overall sediment discharge to the Mississippi River from the Northeast St. Cloud Drainage Area by installing one regional underground stormwater detention and treatment facility in partnership with a Neighborhood Redevelopment Project. The project will have over 16,000 cubic feet of water storage capacity treating 35 acres of stormwater runoff and is modeled to reduce sediment by 4.5 tons, which is 10% of the sediment reduction goal for this drainage area.
This project is targeting unsealed wells in parts of the county that are highly vulnerable to drinking water contamination and are already at a high risk to
contamination from other sources.
These funds will be utilized in cost-share for landowners to install Agricultural Best Management Practices following Little Rock Lake TMDL Implementation Plan. Example of projects include Feedlot Improvements, Waste Storage Facilities, Erosion Control BMPs, Filter Strips and Streambank Stabilizations. An estimated 830 pounds per year of phosphorus and 800 tons of sediment will be reduced annually.
The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.
Crow Wing SWCD is building off its success with Project Recharge and expanded the program to target Gull and Big Trout lakes. The SWCD selected these two lakes because of their declining transparency readings, 25 interested landowners, 2 adjacent resorts, and the community support, past partnerships, valuable fisheries, high ratio of forested land, and low ratio of impervious area in the lakeshed.The SWCD worked with partners to find willing landowners and businesses to complete the following types of projects:Swap Rock for Native Stock: Implement bioengineering to stabilize shorelines.
Crow Wing County, in cooperation with the municipalities within the County, plans to continue its successful well sealing program that pays 50% of the cost to seal / abandon wells up to a maximum of $1000 per well. Priority will be given to wells located in or near existing wellhead protection areas.
This project will provide Stressor ID work and assistance for the development of a work plan for the Major Watershed Project. The Major Watershed Project will include a plan for civic engagement and outreach, with assistance from ten Local Government Units from the Crow Wing River Watershed.
This project will initiate project coordination among project partners. It will enhance civic engagement and outreach endeavors activities to support Phase 2 of TMDL project. It will also support field activities associated with stressor ID work.
This project will determine the magnitude and sources of pollutants in Little Rock Creek and will estimate the reductions in loadings that are needed in order for the stream reaches to support cold water fish assemblages and attain water quality standards.
The Elk River Watershed Association (ERWSA) was formed to enable Sherburne and Benton Counties to work together to implement Local Water Management Plans. Since its formation in 1994, the ERWSA has primarily focused on working with land owners to reduce non-point sources of pollution within the watershed. Sherburne and Benton SWCD staff have extensive experience installing conservation practices. The ERWSA draws support from Sherburne County, Benton County, and local lake associations.
The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.
Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.
This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.
Wood Environment & Infrastructure Solutions, Inc. (Wood) was selected for this project to conduct work in support of the per- and polyfluoroalkyl substances (PFAS) program. This project is a multi-phased pilot study to further validate and refine potential locations across Minnesota that may have historically been, or are currently, contaminated with PFAS. The primary objective is to evaluate potential PFAS locations, specifically compost sites, to determine presence or absence of PFAS at each site.
Little Rock Creek is the only trout stream in the Benton and Morrison County area. The creek has supported a wild brown trout population since they were introduced into Little Rock Lake in 1908. A population assessment done in 1992, however, failed to document the presence of brown trout suggesting that population may have become critically low during the drought years of the late 1980's and early 1990's. The stream has since been listed as impaired due to the low abundance of trout and other cold water fish.
Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health with the assistance of the Board of Water and Soil Resources protects both public health and groundwater by assuring the proper sealing of unused wells.” Clean Water funds are being provided to home owners as a 50% cost-share assistance for sealing unused private drinking water wells.
This project will conduct the second round of Intensive Watershed Monitoring (IWM) for the Mississippi River St. Cloud watershed. Partnering organizations intend to complete sampling of lakes and streams following the protocols and guidance set forth by the Minnesota Pollution Control Agency (MPCA). Watershed partners include Benton Soil and Water Conservation District (SWCD), Clearwater Watershed District, Sherburne SWCD, Stearns SWCD, Stearns County staff, and Wright SWCD.
Drill well to inspect well casing integrity and if casing passes inspection, well to be treated and new hand pump installed. OR Drill well to inspect well casing integrity and the casing fails the inspection. Drill a new well, install new hand pump and se
The Crow Wing County (CWC) Water Plan identifies Island-Loon Lake as a priority lake to enhance due to its significant decline in water clarity and high ratio of impervious surface surrounding the lake. To mitigate the runoff, the Crow Wing Soil and Water Conservation District will partner with the CWC HWY Department, City of Crosslake, Crosslakers, and Whitefish Area Property Owners Association to install three mechanical separators and 13,500 square feet bioretention area that will reduce six pounds of phosphorus and 1 ton of sediment per year from entering the lake.
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The main outcome of the project will be the development of a Total Maximum Daily Load (TMDL) study that address total suspended solids/turbidity impairments of the Mississippi River (Swan River to Crow Wing River). Community outreach to communicate the results and strategies for restoration will also take place during this project.
The main outcome of the project will be development of a Total Maximum Daily Load (TMDL) study that address total suspended solids/turbidity impairments of the Mississippi River (Swan River to Crow Wing River). Community outreach to communicate the results and strategies for restoration will also take place during this project.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.