All Projects

120 Results for
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$54,696
Fund Source

The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Minnesota State University-Mankato
2010 Fiscal Year Funding Amount
$260,000
Fund Source

MSU-Mankato Water Resources Center in the Mankato area will provide conventional pollutant monitoring at the following sites: Beauford Ditch, Big Cobb River, Blue Earth River, Le Sueur River (3), Little Cobb River, Minnesota River (2), Watonwan River.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Steele
Waseca
Watonwan
Recipient
Redwood-Cottonwood Rivers Control Area Joint Powers Board
2013 Fiscal Year Funding Amount
$17,714
Fund Source

The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.

Blue Earth
Brown
Cottonwood
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$32,421
Fund Source

This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Hawk Creek Watershed Project
2013 Fiscal Year Funding Amount
$99,217
Fund Source

This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring (WPLMN) Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Zumbro Watershed Partnership Inc.
2013 Fiscal Year Funding Amount
$81,122
Fund Source

The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Fillmore Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$92,464
Fund Source

This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Minnesota Humanities Center
2020 Fiscal Year Funding Amount
$150,000
2021 Fiscal Year Funding Amount
$120,000
Fund Source

This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in six Minnesota watersheds.

Aitkin
Anoka
Big Stone
Blue Earth
Brown
Carlton
Carver
Cottonwood
Dakota
Dodge
Douglas
Goodhue
Grant
Hennepin
Itasca
Lake
Le Sueur
Lincoln
Nicollet
Olmsted
Otter Tail
Pipestone
Ramsey
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Steele
Stevens
Swift
Wabasha
Washington
Watonwan
Recipient
Minnesota Humanities Center
2022 Fiscal Year Funding Amount
$280,000
2023 Fiscal Year Funding Amount
$104,540
Fund Source

This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in five Minnesota watersheds. The following communities were selected as host sites for this project:
Winona (City of Winona), active hosting period: March 3-April 25, 2022
Lake City (Lake Pepin Legacy Alliance), active hosting period: April 28-June 20, 2022

Aitkin
Anoka
Big Stone
Blue Earth
Brown
Carlton
Carver
Cottonwood
Dakota
Dodge
Douglas
Goodhue
Grant
Hennepin
Isanti
Lake
Le Sueur
Lincoln
Nicollet
Olmsted
Otter Tail
Pipestone
Ramsey
Redwood
Renville
Rice
Rock
Sherburne
Sibley
St. Louis
Steele
Stevens
Swift
Wabasha
Washington
Watonwan
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Sibley County
2010 Fiscal Year Funding Amount
$9,770
Fund Source

This project will provide administrative support to the Clean Water Partnership (CWP) loan program. By initiating the CWP loan program in Sibley County it will provide low interest loans to bring 21 non-complaint or failing existing systems into compliance by replacing them with new single sewage treatment systems.

Sibley
Recipient
Faribault County SWCD
2019 Fiscal Year Funding Amount
$267,400
Fund Source

The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.

Blue Earth
Faribault
Freeborn
Waseca
Recipient
Blue Earth County SWCD
2018 Fiscal Year Funding Amount
$29,929
Fund Source

The Blue Earth SWCD will be monitoring 7 stream sites located in the Le Sueur River Watershed.  The stream sites will be monitored at the road crossing locations via bridge, culvert or shore.  Onsite conditions will be recorded, water sample readings will be taken for Secchi tube, specific conductance, temperature, pH, DO, and photos taken.  

Blue Earth
Waseca
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$34,339
Fund Source

This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Carver
Dakota
Hennepin
Le Sueur
McLeod
Rice
Scott
Sibley
Recipient
LimnoTech
2020 Fiscal Year Funding Amount
$27,606
Fund Source

This project is to refresh the Cannon River Watershed Hydrologic Simulation Program FORTRAN (HSPF) model. The previous model was developed for the time period of 1995-2012. This phase will extend the model to include data through 2019. All time series data will be updated through 2019, land classification zones will be restructured, hydrology calibration will be updated as needed, and final reporting including technical memo and model package.

Dakota
Goodhue
Le Sueur
Rice
Steele
Waseca
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$47,973
Fund Source

The goal of this project is to use a science-based and participatory approach to understanding and promoting conservation practices in the agricultural community.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$134,427
Fund Source
The goal of this project is to construct, calibrate, and validate an HSPF watershed model for the Cannon River Watershed.
Dakota
Goodhue
Le Sueur
Rice
Steele
Waseca
Recipient
Zumbro Watershed Partnership, Inc.
2015 Fiscal Year Funding Amount
$106,580
Fund Source

Complete section 3 of Watershed Restoration and Protection Strategy (WRAPS) document for the Cannon and Zumbro Watersheds and provide input to sections 1 and 2.

Dakota
Dodge
Goodhue
Le Sueur
Olmsted
Rice
Steele
Wabasha
Waseca
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
RESPEC
2023 Fiscal Year Funding Amount
$21,327
Fund Source

The United States Environmental Protection Agency requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load (TMDL) program in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a watershed.

Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$33,414
Fund Source

This project will identify and compile existing nitrate data from groundwaters and surface waters in the Lower Mississippi Basin (LMB) generally and focus on the Root River Watershed. The purpose is to investigate the quantity and quality of existing nitrate data, and to organize it for use in comprehensive watershed strategy development (including assessment, TMDL computation and identification and study of nitrate sources and delivery mechanisms).

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Mower County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$182,020
Fund Source

This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.

Dodge
Freeborn
Mower
Steele
Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Grant
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Nobles
Otter Tail
Pipestone
Pope
Redwood
Renville
Rock
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
University of Minnesota-Twin Cities
2012 Fiscal Year Funding Amount
$141,439
Fund Source

This project will develop an understanding for how sediment sources change over timescales of individual storm events as well as over the past two centuries. The results will be used by the larger Collaborative for Sediment Source Reduction (CISSR)-Blue Earth research group to establish a sediment budget for the Greater Blue Earth River Basin and understand the effectiveness of various potential mitigation strategies. In addition, these results can be used by MPCA and others to calibrate watershed sediment models.

Blue Earth
Faribault
Martin
Waseca
Watonwan
Recipient
Renville County c/o Hawk Creek Watershed Project
2012 Fiscal Year Funding Amount
$149,860
Fund Source

This project will establish a framework and provide tools for local government and watershed projects to engage the public in a manner that will lead to water quality improvement through targeted and prioritized implementation of watershed management practices. The major components of the watershed approach that will be used for this project include; monitoring, gathering of watershed information, assessment of the data, develop of implementation strategies, and implementation of water quality protection and restoration activities.

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2012 Fiscal Year Funding Amount
$80,737
Fund Source

This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.

Blue Earth
Dakota
Dodge
Fillmore
Freeborn
Goodhue
Houston
Le Sueur
Mower
Olmsted
Rice
Scott
Steele
Wabasha
Waseca
Washington
Winona
Recipient
Crow River Organization Of Water (CROW)
2012 Fiscal Year Funding Amount
$80,640
2013 Fiscal Year Funding Amount
$149,360
Fund Source

This project includes project planning, coordination, stream reconnaissance, and begins the effort towards civic engagement/outreach components of the South Fork Crow River Watershed project. Phase I will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and conducting limited lake and stream monitoring.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Yellow Medicine River Watershed District
2012 Fiscal Year Funding Amount
$105,121
Fund Source

This project approach will include monitoring and gathering of watershed information, assess the data, develop implementation strategies to meet standards and protect waters, implement water quality protection and restoration activities in the watershed. The goal of this project is to establish a framework, and to provide information and tools for local government and watershed organizations to engage the public in a manner that will lead to water quality improvement.

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Blue Earth
Brown
Carver
Cottonwood
Dakota
Faribault
Freeborn
Jackson
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Waseca
Watonwan
Yellow Medicine
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Zumbro Watershed Partnership, Inc.
2012 Fiscal Year Funding Amount
$81,750
2011 Fiscal Year Funding Amount
$58,218
Fund Source

This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Laq qui Parle-Yellow Bank Watershed District
2011 Fiscal Year Funding Amount
$141,850
Fund Source

This project will Install buffer strips along 25 miles of ditches in the watershed, replace 50 open tile intakes, and hold workshops in the watershed to increase conservation tillage, nutrient and pesticide management, conservation drainage and restoring wetlands.

Lac qui Parle
Recipient
Laq qui Parle-Yellow Bank Watershed District
2012 Fiscal Year Funding Amount
$260,900
Fund Source

This project will offer incentives to protect 80 acres of land in filter strips and highly erodible lands adjacent to the rivers; construct 9 sediment and water control basins or terraces; replace 35 open tile intakes and advocate wetland restorations and grassland easement programs; organize a Friendship Tour to bring together Minnesota farmers, county commissioners, farm organizations, local, state and federal agency personnel to experience the watershed, farming practices, discuss future project ideas and strengthen relationships; and upgrade 37 subsurface sewage treatment systems by off

Lac qui Parle
Lincoln
Yellow Medicine