All Projects

9 Results for
Recipient
Faribault County SWCD
2019 Fiscal Year Funding Amount
$267,400
Fund Source

The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.

Blue Earth
Faribault
Freeborn
Waseca
Recipient
Redwood-Cottonwood Rivers Control Area
2018 Fiscal Year Funding Amount
$100,000
2019 Fiscal Year Funding Amount
$100,000
Fund Source

The Cottonwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.

Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Houston Engineering Inc
2019 Fiscal Year Funding Amount
$46,510
Fund Source

This project will develop a watershed wide Total Maximum Daily Load (TMDL) study and River Eutrophication Standard (RES) TMDL report for water quality impairments in the Des Moines River basin, which includes the Des Moines River Headwaters, Lower Des Moines River, and East Fork Des Moines River watersheds.

Cottonwood
Jackson
Lyon
Martin
Murray
Nobles
Pipestone
Recipient
Sibley Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$17,431
2020 Fiscal Year Funding Amount
$10,437
2021 Fiscal Year Funding Amount
$10,437
2022 Fiscal Year Funding Amount
$25,995
2024 Fiscal Year Funding Amount
$27,680
Fund Source

The goal of the High Island Creek Watershed Pollutant Load Monitoring project is to assist the Minnesota Pollution Control Agency (MPCA) with meeting the objectives of the Watershed Pollutant Load Monitoring Network (WPLMN). This will be accomplished by conducting water chemistry monitoring at two specified stream locations from ice out through October 31, capturing snow melt, rainfall events and base flow conditions. In addition, project staff will compile and submit the required data, information, and reports, and calculate pollutant loads using the FLUX32 model.

Sibley
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$11,920
Fund Source

The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.

Anoka
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Goodhue
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Wabasha
Washington
Yellow Medicine
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$89,477
Fund Source

The goal of this project is to extend existing Hydrologic Simulation Program FORTRAN (HSPF) models through 2017 for the following major watersheds: Redwood, Cottonwood, Watonwan, Blue Earth, Le Sueur, Pomme de Terre, Minnesota River-Headwaters, and Lac Qui Parle watersheds.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Murray
Otter Tail
Pipestone
Pope
Redwood
Renville
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Middle Fork Crow River Watershed Dist
2019 Fiscal Year Funding Amount
$230,000
Fund Source

The State of Minnesota has adopted a ten year cycle for managing water quality for each of the 80 major watersheds in the state. Every ten years, each major watershed will undergo a surface water assessment and a Watershed Restoration and Protection Strategy (WRAPS) project. The North Fork Crow River WRAPS process is entering its second round which will focus both on addressing data gaps identified in the approved NFCRW Comprehensive Watershed Plan and on addressing additional required Total Maximum Daily Load (TMDL) studies required by the United States Environmental Protection Agency.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Waseca SWCD
2019 Fiscal Year Funding Amount
$50,000
Fund Source

The project will work with county and Waseca Soil and Water Conservation District staff to increase knowledge and participation in the Watershed Approach efforts and provide input to the Watershed Restoration and Protection Strategies (WRAPS) document.

Blue Earth
Faribault
Freeborn
Waseca
Recipient
Water Resources Center
2016 Fiscal Year Funding Amount
$274,204
2018 Fiscal Year Funding Amount
$152,059
2019 Fiscal Year Funding Amount
$106,168
2021 Fiscal Year Funding Amount
$196,744
2022 Fiscal Year Funding Amount
$244,332
2024 Fiscal Year Funding Amount
$241,188
Fund Source

This project will collect water samples at seventeen monitoring locations ranging in size from 23,173 acres (7 Mile Creek) to over 9 million acres (Minnesota River at St. Peter) as a part of the Watershed Pollutant Load Monitoring Network (WPLMN). The Minnesota State University - Water Resources Center (WRC) has been directly involved with the program and is familiar with the streams and hydrology of the region. In addition to monitoring, the WRC will review, manage and submit the data in formats provided by the Minnesota Pollution Control Agency (MPCA).

Blue Earth
Faribault
Nicollet
Watonwan