The grant will use local data to develop stormwater planning options that prioritize, target, and measure the effectiveness of Best Management Practices and allow local city officials to make decisions on stormwater Best management Practices that reduce pollutants in the stormwatershed.
This project is the first step toward a regional based implementation approach to reduce phosphorus and total suspended solids in the 12 cities on the Mississippi River. By the time this project is approved, a stormwater retrofit analysis will be completed for the cities, and the MHB will be discussing with them a strategic way to implement the study on a regional scale. By funding this project, you are encouraging the future implementation in a strategic and organized process.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
Phase X of the Camp Ripley Sentinel Landscape ACUB Partnership will utilize permanent conservation easements (BWSR RIM) to acquire 1,421-acres of high quality habitat in order to accomplish: PERMANENT PROTECTION of habitat corridors and buffers around public lands, PRESERVE open space within the CRSL, and conservation enhancement and restoration PRACTICES to protect soil and water quality and habitat corridor connectivity.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.
The Camp Ripley ACUB Phase VI project protected almost 1070 acres of high quality habitat along the Mississippi and Crow Wing Rivers and near the Nokasippi and Gull River WMAs through approximately 14 conservation easements.
Phase VIII of the RIM Camp Ripley Sentinel Landscape ACUB Partnership utilized permanent RIM conservation easements to acquire 1,755-acres of high quality habitat within the ACUB work area. We secured 7 easements including the two one contiguous block but done as two easements for legal reasons) Cushing Land Company easements that totaled 1,464 acres. In total one of the largest RIM easements ever acquired.
The project protect approximately 1090 acres of habitat for fish, game and wildlife with easements along the Mississippi and Crow Wing Rivers and tributaries. Protection will reduce infringement and development and improve watershed function.
This 3-part project is developing and installing shoreline buffer projects on Ten Mile Lake, and the Roosevelt, Lawrence, Leavitt Lake area (RALALA).An additional part will correct roadway erosion contributing to sedimentation and water quality degradation on Buxton Road between McKeowen and Mann Lakes. Woodrow Township will work with Cass County SWCD/ESD and adjacent landowners to construct sedimentation basins and rain gardens and restructure the roadbed by reducing the slope to eliminate erosion and sedimentation.
Most municipalities located in Cass County are adjacent to surface waters that drain into the Upper Mississippi River Watershed. In some cases, over 30% of the community consists of impervious surface coverage. Few, if any of these communities have done any work to retrofit existing stormwater systems. As a result, large amounts of untreated stormwater carrying phosphorus, nitrogen and sediments enter the river. These impacts have resulted in the degrading of water quality in the watershed.