Recipient
Two Rivers Watershed District
2012 Fiscal Year Funding Amount
$179,348
2013 Fiscal Year Funding Amount
$99,933
Fund Source

This project will include analysis of existing and newly collected water quality data to verify the impairments on the currently listed reaches and to determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a focus throughout the Watershed Approach Project. The project provides an opportunity to assess and leverage the capacity for the local community to engage in the process of watershed management and to adopt protection and restoration practices.

Kittson
Marshall
Roseau
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$100,000
Fund Source
The goal of this project is to construct, calibrate, and validate a watershed model using HSPF modeling.
Marshall
Recipient
International Water Institute
2011 Fiscal Year Funding Amount
$60,915
Fund Source

This project will support water quality monitoring and data analysis in nine major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Pennington
Polk
Red Lake
Roseau
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Beltrami
Clearwater
Itasca
Koochiching
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Middle-Snake-Tamarac Rivers Watershed District
2017 Fiscal Year Funding Amount
$134,935
Fund Source

The goal of this project is to utilize the information and data collected in the Phase I project to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase II project will allocate pollutant reductions goals, and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.

Beltrami
Marshall
Pennington
Polk