The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.
MSU-Mankato Water Resources Center in the Mankato area will provide conventional pollutant monitoring at the following sites: Beauford Ditch, Big Cobb River, Blue Earth River, Le Sueur River (3), Little Cobb River, Minnesota River (2), Watonwan River.
The goal of this project is to assess water quality in the following Anoka County waterbodies: Minard Lake, Pickerel Lake, Trott Brook, Seelye Brook, Cedar Creek, and the Rum River.
This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring (WPLMN) Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).
This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.
This project goal is to conduct water chemistry monitoring at seventeen stream locations, to record and submit all data collected through this process, and to provide the information necessary for the calculation of water quality pollutant loads using the FLUX32 program.
This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.
This project is for two years of condition monitoring, data management, and project oversight for five stream locations within the Rum River major watershed. The monitored streams include Rum River, Trott Brook, Cedar Creek, and Seelye Brook. All sites are within Anoka County and have been previously sampled by ACD. At each site, ACD will assess the stream in accordance with the MN Pollution Control Agency's (MPCA) Intensive Water Monitoring Standard Operating Procedures (SOP). Data collected will be entered into EQuIS, and interim reports and final report will be submitted as due.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in six Minnesota watersheds.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in five Minnesota watersheds. The following communities were selected as host sites for this project:
Winona (City of Winona), active hosting period: March 3-April 25, 2022
Lake City (Lake Pepin Legacy Alliance), active hosting period: April 28-June 20, 2022
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.
The goal of this project is to develop and write the Watershed Restoration and Protection Strategy (WRAPS) report for the Blue Earth River Watershed to provide restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.
This project will utilize a systematic approach to identify principal sources, or “hot-spots”, of sediment contributions and work with individual landowners, county drainage officials, and municipalities to coordinate and implement critical Best Management Practices (BMP’s), establish demonstration sites, and provide education and outreach efforts. This project will also establish baseline watershed data with the addition of site specific information, and determine high priority watersheds. Appropriate practices will be identified and mapped utilizing GPS and GIS equipment and software.
The goal is to facilitate strategic networking, learning, and implementation in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
The goal of this project is to extend the existing Chippewa River Hydrologic Simulation Program FORTRAN (HSPF) watershed model. The contractor will produce an HSPF model with meteorological, point source, and atmospheric deposition input timeseries extended through 2020.
The Chippewa River Watershed Association (CRWA) will lead programs to tell a watershed story on the state of our waters and efforts needed to protect or restore them. The CRWA will partner with local offices on existing local educational efforts and will support these types of events. Activities will focus on priority areas and information sharing as outlined in the Chippewa River Watershed Restoration and Protection Strategies (WRAPS) Public Participation Plan.
The purpose of this project is to create a shared plan for the Watershed Restoration and Protection Strategy (WRAPS) process with roles, responsibilities, commitments and deliverables clearly understood by all (Minnesota Pollution Control Agency (MPCA), Chippewa River Watershed, and local partners). The MPCA and the Chippewa River Watershed Project (CRWP) will be working together to ascertain the level of involvement that local units of government and other partners want to engage in for the second round of the WRAPS process.
The goal of the Chippewa River Watershed Protection project is to protect unimpaired areas of the watershed. This will be accomplished through education and outreach with landowners and through implementation of best management practices.
The Minnesota Pollution Control Agency (MPCA) developed the Chippewa River Watershed Total Maximum Daily Load (TMDL) report in 2016 that addresses impairments 48 separate impairment listings for 16 stream reaches and 25 lakes in the watershed. The purpose of this project is to support the development of TMDLs for additional streams reaches and lakes that were not previously completed. MPCA has identified 12 waterbodies with aquatic recreation or aquatic life impairments that need to be addressed through the development of new TMDLs.
The Chippewa River Watershed Project (CRWP) will work with the Minnesot Pollution Control Agency (MPCA) to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed to aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. Our goal is to collect quality data and complete load calculations for five sites using the MPCA's Watershed Pollutant Load Monitoring Network (WPLMN) established protocols.
This project will complete a comprehensive and sustainable Major Watershed Restoration and Protection Strategies report for the Chippewa River, its tributary streams, and the many lakes in the Chippewa River watershed that is understandable and adoptable by local units of government and residents.
This project is for Cycle 2 of the Intensive Watershed Monitoring (IWM) process for the Lower St. Croix Watershed. Seven stream sites will be monitored by the Isanti Soil and Water Conservation District (SWCD), Anoka Conservation District, and Chisago SWCD. Sampling will be conducted in 2019 and 2020 and Chemistry and field observation data will be taken.
The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.
The primary objective of this workplan is to demonstrate the ability of the City of Paynesville to meet the current and future wastewater treatment needs and achieve beneficial use of wastewater effluent, to replace the use of groundwater.
The goal of this project is to update existing bacteria and Total Suspended Solids (TSS) source inventory through desktop survey and field reconnaissance to identify and prioritize locations to reduce sediment and bacteria loading to the Clearwater River; then, design and implement best management practices (BMPs) at prioritized locations to reduce loading.
The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.
The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.
The project goal is to conduct water chemistry monitoring at five subwatershed sites and two basin sites annually from 2016-2019, based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).
This project focuses on preventing and reducing sediment related turbidity problems throughout the Crow River Watershed and contains three main tasks; Best Management Practices (BMP's) installation, public outreach and administration.
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.
This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.