This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.
This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.
This project will complete a comprehensive and sustainable Major Watershed Restoration and Protection Strategies report for the Chippewa River, its tributary streams, and the many lakes in the Chippewa River watershed that is understandable and adoptable by local units of government and residents.
The primary objective of this workplan is to demonstrate the ability of the City of Paynesville to meet the current and future wastewater treatment needs and achieve beneficial use of wastewater effluent, to replace the use of groundwater.
The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.
This project will educate the local residents of the importance of groundwater protection and provide financial assistance to those who need to properly abandon their unused well. This project will also support the upgrade of nonconforming sewage treatment systems to reduce nutrient contributions to groundwater and surface water through groundwater permeation.
This project will support the design and construction of three rain gardens to intercept and infiltrate stormwater runoff near the Fridley Middle School.
This project will reduce nutrient loadings to Sand Creek from the neighborhoods which are the greatest contributors. Project activities include the installation of a new stormwater pond and a network of 10 strategically-placed curb-cut rain gardens.
This project will promote positive land use changes, along with a sense of watershed stewardship and awareness throughout the Crow River Watershed. This project contains three main tasks: BMP installation, public outreach and administration. This project will also work with the Big Swan Lake Association in Meeker County to host a shoreline naturalization workshop.
This project will continue the restoration of Osakis Lake and protect the water quality of the Sauk River by addressing stormwater runoff from urban and rural areas. Activities include assisting eight landowners in designing and funding their shoreland restoration and rain garden projects.
Varney Lake is owned and maintained by the City of white Bear Lake as part of its stormwater collection system. The City will excavate approximately 10,000 cubic yards of polycyclic aromatic hydrocarbons (PAH) contaminated sediment from Varney Lake (which is located in a residential portion of the City) and manage the sediments on site by encapsulating the sediment in a berm covered with clean top soil. The encapsulated sediment will be managed as a solid waste in what the MPCA refers to as a limited use solid waste landfill (Facility).
This project will remove accumulated sediment from two Stormwater Treatment Ponds in Circle Pines that were constructed in the 1970’s. Recent testing of the sediments indicates that Tier 2 and 3 PAH compounds were found in the sediment. The most recent estimate for the volume of material that will be removed is 2,400 Cubic Yards.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.
This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.
This project will initiate the process of community engagement in the LeSueur River watershed by assessing the needs and interests of the community and bringing a diverse set of stakeholders together to determine how best to foster action in improving and protecting water quality.
Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.
This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.
This project will provide the Minnesota Pollution Control Agency and Ramsey-Washington Metro Watershed District the information and tools necessary to improve water quality in Battle Creek Lake, Beaver Lake, Carver Lake, Keller Lake and Wakefield Lake through targeted phosphorus reduction activities in the watershed.
This project will complete an assessment of watershed lakes and streams. The assessment will include biological and stressor id analysis, which will support a summary report on lake conditions and protection strategies for lakes included in this watershed study.
This project will complete a Acetochlor Impairment Response Report. This report will combine and coordinate information relating to actions being done in direct response to the acetochlor water quality impairments with those being done and support MDA’s on-going responsibility to assure pesticides are used in a manner that does not cause unreasonable adverse effects on the environment.
This project will provide additional monitoring data to be utilized in the watershed assessment process for the Le Sueur River Watershed Project. Monitoring will take place for an additional year at two sites along the Maple River.
This project will identify priority management zones (PMZ), for the purposes of water quality restoration and protection, within the LeSueur River major watershed. This project is only one component of a larger effort in the LeSueur watershed to complete Total Maximum Daily Load (TMDL) studies while engaging citizens and landowners in land management planning.
This project will apply the Sunrise River watershed computer model generated under previous projects to selected scenarios of land-cover and land-management changes. The watershed model calibrated to conditions in the late 1990s will form the initial baseline against which all other model runs will be contrasted. Scenarios to be run will include changes in future land cover, agricultural practices, urban practices, and natural resource management.
The Upper Minnesota River Water Quality Assessment Project will complete water chemistry assessments of the upper reaches of the Minnesota River Headwaters, which includes the main stem of the river, five main tributaries (Meadowbrook Creek, Salmonsen Creek, Fish Creek, Hoss Creek, Little Minnesota River and Stoney Run Creek), and one flowage lake (Long Tom).
This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.
This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.
This project will provide modeling services to support the completion of the Typo Lake and Martin Lake Excess Nutrients TMDL report. A Total Maximum Daily Load (TMDL) report quantifies pollutant levels, identifies sources of pollution, and proposes ways to bring water quality back to an acceptable level.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.