RESPEC
2013 Fiscal Year Funding Amount
$49,986
Fund Source

The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Mahnomen
Norman
Polk
Recipient
Minnesota State University-Mankato
2010 Fiscal Year Funding Amount
$260,000
Fund Source

MSU-Mankato Water Resources Center in the Mankato area will provide conventional pollutant monitoring at the following sites: Beauford Ditch, Big Cobb River, Blue Earth River, Le Sueur River (3), Little Cobb River, Minnesota River (2), Watonwan River.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Steele
Waseca
Watonwan
Recipient
Anoka Conservation District
2013 Fiscal Year Funding Amount
$55,602
Fund Source

The goal of this project is to assess water quality in the following Anoka County waterbodies: Minard Lake, Pickerel Lake, Trott Brook, Seelye Brook, Cedar Creek, and the Rum River.

Anoka
Recipient
Headwaters Science Center (HSC)
2013 Fiscal Year Funding Amount
$27,890
Fund Source

The goal of this project is to complete a two-year data set for physical, bacterial, and water chemistry sampling for the Intensive Watershed Monitoring Plan to aid MPCA’s assessment of the aquatic health of the Mississippi Headwaters(HUC 07010101) Watershed.

Becker
Beltrami
Cass
Clearwater
Hubbard
Itasca
Recipient
International Water Institute
2013 Fiscal Year Funding Amount
$56,031
Fund Source

The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.

Kittson
Marshall
Pennington
Polk
Roseau
Recipient
Water Resources Center, Minnesota State University- Mankato
2013 Fiscal Year Funding Amount
$80,546
Fund Source

The goal of this project is monitor, record, and submit the dataset necessary for assessment of aquatic recreation use with the Watonwan Watershed.

Blue Earth
Cottonwood
Faribault
Freeborn
Jackson
Martin
Watonwan
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$32,421
Fund Source

This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Anoka Conservation District
2024 Fiscal Year Funding Amount
$31,400
Fund Source

This project is for two years of condition monitoring, data management, and project oversight for five stream locations within the Rum River major watershed. The monitored streams include Rum River, Trott Brook, Cedar Creek, and Seelye Brook. All sites are within Anoka County and have been previously sampled by ACD. At each site, ACD will assess the stream in accordance with the MN Pollution Control Agency's (MPCA) Intensive Water Monitoring Standard Operating Procedures (SOP). Data collected will be entered into EQuIS, and interim reports and final report will be submitted as due.

Anoka
Recipient
Minnesota Humanities Center
2020 Fiscal Year Funding Amount
$150,000
2021 Fiscal Year Funding Amount
$120,000
Fund Source

This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in six Minnesota watersheds.

Aitkin
Anoka
Big Stone
Blue Earth
Brown
Carlton
Carver
Cottonwood
Dakota
Dodge
Douglas
Goodhue
Grant
Hennepin
Itasca
Lake
Le Sueur
Lincoln
Nicollet
Olmsted
Otter Tail
Pipestone
Ramsey
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Steele
Stevens
Swift
Wabasha
Washington
Watonwan
Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
2019 Fiscal Year Funding Amount
$10,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.

Benton
Carlton
Dakota
Hennepin
Itasca
Mille Lacs
Mower
Polk
Recipient
Minnesota Humanities Center
2022 Fiscal Year Funding Amount
$280,000
2023 Fiscal Year Funding Amount
$104,540
Fund Source

This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in five Minnesota watersheds. The following communities were selected as host sites for this project:
Winona (City of Winona), active hosting period: March 3-April 25, 2022
Lake City (Lake Pepin Legacy Alliance), active hosting period: April 28-June 20, 2022

Aitkin
Anoka
Big Stone
Blue Earth
Brown
Carlton
Carver
Cottonwood
Dakota
Dodge
Douglas
Goodhue
Grant
Hennepin
Isanti
Lake
Le Sueur
Lincoln
Nicollet
Olmsted
Otter Tail
Pipestone
Ramsey
Redwood
Renville
Rice
Rock
Sherburne
Sibley
St. Louis
Steele
Stevens
Swift
Wabasha
Washington
Watonwan
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Faribault County SWCD
2019 Fiscal Year Funding Amount
$267,400
Fund Source

The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.

Blue Earth
Faribault
Freeborn
Waseca
Recipient
Minnesota State University - Mankato
2021 Fiscal Year Funding Amount
$49,992
Fund Source

The goal of this project is to develop and write the Watershed Restoration and Protection Strategy (WRAPS) report for the Blue Earth River Watershed to provide restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.

Blue Earth
Faribault
Freeborn
Jackson
Martin
Recipient
Faribault County SWCD
2017 Fiscal Year Funding Amount
$94,500
Fund Source

The goal is to facilitate strategic networking, learning, and implementation in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed

Blue Earth
Faribault
Freeborn
Jackson
Martin
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source

The goal of this project is to complete the construction of an Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. Tetra Tech will produce a HSPF watershed model application(s) that will be fully functioning and ready for calibration as part of Phase 2. 

Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.

Becker
Clay
Otter Tail
Wilkin
Recipient
RESPEC
2022 Fiscal Year Funding Amount
$29,991
Fund Source

The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.

Becker
Clay
Otter Tail
Wilkin
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$70,921
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Wilkin
Otter Tail
Clay
Becker
Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red Rivers Watershed District
2019 Fiscal Year Funding Amount
$38,835
Fund Source

This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Wilkin
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$47,973
Fund Source

The goal of this project is to use a science-based and participatory approach to understanding and promoting conservation practices in the agricultural community.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$14,142
Fund Source

This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Washington Conservation District
2010 Fiscal Year Funding Amount
$103,598
Fund Source

Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
RESPEC
2023 Fiscal Year Funding Amount
$21,327
Fund Source

The United States Environmental Protection Agency requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load (TMDL) program in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a watershed.

Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Chisago Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$38,328
Fund Source

This project is for Cycle 2 of the Intensive Watershed Monitoring (IWM) process for the Lower St. Croix Watershed. Seven stream sites will be monitored by the Isanti Soil and Water Conservation District (SWCD), Anoka Conservation District, and Chisago SWCD. Sampling will be conducted in 2019 and 2020 and Chemistry and field observation data will be taken.

Anoka
Chisago
Isanti
Recipient
City of Roseville
2013 Fiscal Year Funding Amount
$100,000
Fund Source

The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$185,473
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Beltrami
Clearwater
Mahnomen
Pennington
Polk
Red Lake
Recipient
Randy S. Ferrin
2011 Fiscal Year Funding Amount
$4,997
Fund Source

The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Crow Wing Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$50,315
Fund Source

This project will include lake and stream monitoring on 7 lakes and 3 streams found within the Pine River watershed. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites for 2012. One of the goals in the Crow Wing County (CWC) Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Cass
Crow Wing
Hubbard