All Projects

16 Results for
Recipient
Clay SWCD
2017 Fiscal Year Funding Amount
$118,000
Fund Source

Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.

Clay
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
2025 Fiscal Year Funding Amount
$150,000
2024 Fiscal Year Funding Amount
$150,000
2023 Fiscal Year Funding Amount
$135,000
2022 Fiscal Year Funding Amount
$135,000
2021 Fiscal Year Funding Amount
$150,000
2020 Fiscal Year Funding Amount
$150,000
2019 Fiscal Year Funding Amount
$110,000
2018 Fiscal Year Funding Amount
$110,000
2017 Fiscal Year Funding Amount
$110,000
2016 Fiscal Year Funding Amount
$110,000
2015 Fiscal Year Funding Amount
$110,000
2014 Fiscal Year Funding Amount
$110,000
Fund Source

Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.

Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Cass
Chippewa
Clay
Crow Wing
Dakota
Douglas
Goodhue
Grant
Hubbard
Isanti
Kandiyohi
Kittson
Lac qui Parle
Lincoln
Marshall
Meeker
Morrison
Mower
Norman
Otter Tail
Pipestone
Polk
Pope
Red Lake
Renville
Rice
Sherburne
Stearns
Stevens
Swift
Todd
Wabasha
Wadena
Washington
Watonwan
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
US Geological Survey
2017 Fiscal Year Funding Amount
$12,520
Fund Source

The goal of this project is to collect real-time, parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity, and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks, ND on the Red River of the North. The data will be published on the USGS National Water Information System (NWIS) website.

Clay
Polk
Recipient
Moorhead Public Service
2017 Fiscal Year Funding Amount
$9,670
Fund Source

Televise well 6 unique well No 241492

Clay
Recipient
Moorhead Public Service
2013 Fiscal Year Funding Amount
$5,114
Fund Source

Purchase and Install remote well loggers on DNR observation wells and hard wired loggers at Moorhead Public Service remote production wells

Clay
Recipient
City of Georgetown
2017 Fiscal Year Funding Amount
$10,000
2016 Fiscal Year Funding Amount
$10,000
Fund Source

Purchase a generator; Provide letters to residents in the DWSMA.

Clay
Recipient
City of Georgetown
2017 Fiscal Year Funding Amount
$9,963
Fund Source

Purchase and install electrical equipment to hook up generator to city's water system. Research well report.

Clay
Recipient
Buffalo-Red River Watershed District
2013 Fiscal Year Funding Amount
$336,860
Fund Source

Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.

Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red River Watershed District
2012 Fiscal Year Funding Amount
$50,013
2013 Fiscal Year Funding Amount
$90,160
Fund Source

This project will provide MPCA staff, local partners and citizen volunteers with a framework for building local capacity to design civic engagement and communication/outreach efforts that will contribute to meaningful and sustained public participation in surface water protection and restoration activities throughout the watershed.

Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$99,980
Fund Source

This goal of this project is the completion of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Upper Red River watershed in the Red River Basin. This includes the construction, calibration, and validation of the model for hydrology and water quality parameters.

Clay
Wilkin
2013 Fiscal Year Funding Amount
$333,590
Fund Source

The Red River is impaired for turbidity. The level of turbidity is a significant factor in the cost of treatment of drinking water by the City of Moorhead. This water quality improvement project involves the retrofit of Clay County Ditches 9, 32, and 33 just south of the city. The project involves the installation of an estimated 87 side inlet sediment controls and 35 acres of buffer strips. All three of these ditch systems with over 16 miles of County Ditch will be treated for sediment and erosion control with the installation of conservation practices.

Becker
Clay
Otter Tail
Wilkin
Recipient
USGS North Dakota Water Science Center
2017 Fiscal Year Funding Amount
$20,000
Fund Source

This is a joint project between the United States Geological Survey (USGS), Minnesota Pollution Control Agency (MPCA), North Dakota, and Manitoba. The project is a basin-wide, up-to-date water quality trend analysis using the "QWTrend" program for approximately 40 bi-national river sites to review nutrients, total suspended solids, total dissolved solids, sulfate and chloride from 1980 - 2015.

Clay
Kittson
Marshall
Norman
Polk
Wilkin