Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.
This program annually evaluates a sample of up to ten Clean Water Fund restoration projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
Governor Mark Dayton's landmark buffer initiative was signed into law in 2015. The law establishes new perennial vegetation buffers of up to 50 feet along rivers, streams, and ditches that will help filter out phosphorus, nitrogen, and sediment. The new law provides flexibility and financial support for landowners to install and maintain buffers.
For grants to Soil and Water Conservation Districts to ensure compliance with riparian buffer or alternate practice requirements for state required buffers and soil erosion law.
The Carver County Planning and Water Management Department (PWM) has an active well sealing cost share program. Following the adoption of the updated County Groundwater Plan in February of 2016, the Carver County Board of Commissioners moved to accelerate the program to encourage landowners to seal abandoned wells. Carver County is looking to supplement existing funds, as demand is expected to increase. With this additional funding, it is the goal of Carver County PWM to seal an additional 15 wells county wide.
The purpose of this project is to install prioritized and targeted best management practices on the Carver County Ditch #6 drainage system that drains directly into Bevens Creek. Bevens Creek does not meet state water quality standards for sediment. The goal of the project is to install 6 grade stabilization structures, 5 grassed waterways, and 2 water and sediment control basins that have been identified through GIS LIDAR applications and field verified along with landowner support.
The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.
The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.
The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.
This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.
Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
The project is part of the Six Mile-Halsted Bay Subwatershed Plan, a planning partnership currently underway which aims to protect and improve natural resources within this priority subwatershed by working closely with partnering agencies to integrate capital investments and maximize public return on investment. This project will enhance two existing stormwater ponds to enhance treatment of phosphorus as well as incorporate treatment of the Church Lake outlet, a lake which routinely fails to meet state water quality standards and contributes to the water quality impairment of East Auburn.