This project is the first step toward a regional based implementation approach to reduce phosphorus and total suspended solids in the 12 cities on the Mississippi River. By the time this project is approved, a stormwater retrofit analysis will be completed for the cities, and the MHB will be discussing with them a strategic way to implement the study on a regional scale. By funding this project, you are encouraging the future implementation in a strategic and organized process.
"This project will meet the following goals: develop, implement, and evaluate the impacts civic engagement outcomes for the Big Fork River Watershed; create a citizen understanding of the Watershed Restoration & Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) process and the role citizens and stakeholders can play in attaining water quality restoration and protection; provide opportunities for citizens and stakeholders to assist local partners and state agencies in developing priorities for restoration as well projects to accomplish protection of high quality waters; and
The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.
Itasca SWCD will work with the Minnesota Pollution Control Agency as a collaborative effort to monitor the Big Fork River near Bigfork at State Highway 6 and Big Fork River near Craigsville at State Highway 6. Itasca Soil and Water Conservation District (SWCD) staff will strive to capture the peak, rising, and falling limbs of the hydrograph for spring run-off and significant storm events as well as base flow samples. Itasca SWCD staff will utilize local rain gauge readers, storm tracking weather services, and historical stage data to aid in making monitoring judgments.
Itasca County is about to begin their water plan update process, which will be finished in 2017. This plan will be watershed protection oriented following a similar format to what Crow Wing County has done. We are currently in the process of have lake screening reports completed for 38 Itasca County lakes, and we would like to continue this program to add reports for an additional 34 lakes.
The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.
The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
The goal of this project is to calibrate, and validate three watershed models using the Hydrological Simulation Program FORTRAN (HSPF) model. The contractor will produce HSPF watershed models that can be further developed to provide information to support conventional parameter TMDLs. The contractor will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.