All Projects

269 Results for
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$54,696
Fund Source

The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Hawk Creek Watershed Project
2013 Fiscal Year Funding Amount
$99,217
Fund Source

This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring (WPLMN) Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Big Stone
Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Minnesota Humanities Center
2020 Fiscal Year Funding Amount
$150,000
2021 Fiscal Year Funding Amount
$120,000
Fund Source

This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in six Minnesota watersheds.

Aitkin
Anoka
Big Stone
Blue Earth
Brown
Carlton
Carver
Cottonwood
Dakota
Dodge
Douglas
Goodhue
Grant
Hennepin
Itasca
Lake
Le Sueur
Lincoln
Nicollet
Olmsted
Otter Tail
Pipestone
Ramsey
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Steele
Stevens
Swift
Wabasha
Washington
Watonwan
Recipient
Minnesota Humanities Center
2022 Fiscal Year Funding Amount
$280,000
2023 Fiscal Year Funding Amount
$104,540
Fund Source

This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in five Minnesota watersheds. The following communities were selected as host sites for this project:
Winona (City of Winona), active hosting period: March 3-April 25, 2022
Lake City (Lake Pepin Legacy Alliance), active hosting period: April 28-June 20, 2022

Aitkin
Anoka
Big Stone
Blue Earth
Brown
Carlton
Carver
Cottonwood
Dakota
Dodge
Douglas
Goodhue
Grant
Hennepin
Isanti
Lake
Le Sueur
Lincoln
Nicollet
Olmsted
Otter Tail
Pipestone
Ramsey
Redwood
Renville
Rice
Rock
Sherburne
Sibley
St. Louis
Steele
Stevens
Swift
Wabasha
Washington
Watonwan
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Morris, City of
2014 Fiscal Year Funding Amount
$500,000
Fund Source
This grant to the City of Morris provides public improvements for the beneficial use of wastewater effluent, where beneficial use is defined as the use of stormwater or wastewater effluent from a publicly owned wastewater treatement plant to replace the use of groundwater.
Stevens
Recipient
RESPEC
2023 Fiscal Year Funding Amount
$14,997
Fund Source

The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.

Big Stone
Grant
Stevens
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Bois de Sioux Watershed District
2011 Fiscal Year Funding Amount
$150,000
Fund Source

This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
RESPEC
2021 Fiscal Year Funding Amount
$14,989
Fund Source

The goal of this project is to extend the existing Chippewa River Hydrologic Simulation Program FORTRAN (HSPF) watershed model. The contractor will produce an HSPF model with meteorological, point source, and atmospheric deposition input timeseries extended through 2020.

Chippewa
Douglas
Grant
Kandiyohi
Pope
Stevens
Swift
Recipient
Chippewa River Watershed Association
2021 Fiscal Year Funding Amount
$25,000
Fund Source

The Chippewa River Watershed Association (CRWA) will lead programs to tell a watershed story on the state of our waters and efforts needed to protect or restore them. The CRWA will partner with local offices on existing local educational efforts and will support these types of events. Activities will focus on priority areas and information sharing as outlined in the Chippewa River Watershed Restoration and Protection Strategies (WRAPS) Public Participation Plan.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stevens
Swift
Recipient
Chippewa River Watershed
2019 Fiscal Year Funding Amount
$31,912
Fund Source

The purpose of this project is to create a shared plan for the Watershed Restoration and Protection Strategy (WRAPS) process with roles, responsibilities, commitments and deliverables clearly understood by all (Minnesota Pollution Control Agency (MPCA), Chippewa River Watershed, and local partners). The MPCA and the Chippewa River Watershed Project (CRWP) will be working together to ascertain the level of involvement that local units of government and other partners want to engage in for the second round of the WRAPS process.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stevens
Swift
Recipient
Chippewa River Watershed Project
2015 Fiscal Year Funding Amount
$296,965
Fund Source

The goal of the Chippewa River Watershed Protection project is to protect unimpaired areas of the watershed. This will be accomplished through education and outreach with landowners and through implementation of best management practices.

Chippewa
Douglas
Grant
Kandiyohi
Pope
Stevens
Swift
Recipient
Tetra Tech Inc
2024 Fiscal Year Funding Amount
$110,097
Fund Source

The Minnesota Pollution Control Agency (MPCA) developed the Chippewa River Watershed Total Maximum Daily Load (TMDL) report in 2016 that addresses impairments 48 separate impairment listings for 16 stream reaches and 25 lakes in the watershed. The purpose of this project is to support the development of TMDLs for additional streams reaches and lakes that were not previously completed. MPCA has identified 12 waterbodies with aquatic recreation or aquatic life impairments that need to be addressed through the development of new TMDLs.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Chippewa River Watershed Project
2016 Fiscal Year Funding Amount
$100,429
2018 Fiscal Year Funding Amount
$40,197
2019 Fiscal Year Funding Amount
$28,066
Fund Source

The Chippewa River Watershed Project (CRWP) will work with the Minnesot Pollution Control Agency (MPCA) to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed to aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. Our goal is to collect quality data and complete load calculations for five sites using the MPCA's Watershed Pollutant Load Monitoring Network (WPLMN) established protocols.

Chippewa
Stevens
Swift
Recipient
Chippewa County
2011 Fiscal Year Funding Amount
$286,113
Fund Source

This project will complete a comprehensive and sustainable Major Watershed Restoration and Protection Strategies report for the Chippewa River, its tributary streams, and the many lakes in the Chippewa River watershed that is understandable and adoptable by local units of government and residents.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
City of Roseville
2013 Fiscal Year Funding Amount
$100,000
Fund Source

The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Crow River Organization of Water
2016 Fiscal Year Funding Amount
$157,043
2019 Fiscal Year Funding Amount
$88,765
Fund Source

The project goal is to conduct water chemistry monitoring at five subwatershed sites and two basin sites annually from 2016-2019, based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

McLeod
Meeker
Stearns
Wright
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Crow Wing Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$50,315
Fund Source

This project will include lake and stream monitoring on 7 lakes and 3 streams found within the Pine River watershed. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites for 2012. One of the goals in the Crow Wing County (CWC) Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Crow Wing Soil and Water Conservation
2023 Fiscal Year Funding Amount
$46,522
Fund Source

The project will include lake and stream monitoring within the Pine River Watershed. Monitoring will encompass five lakes and five streams. The project will be conducted in an effort to gain sufficient data. One of the goals of the Crow Wing County Local Comprehensive Water Plan is to establish a countywide Comprehensive Monitoring Plan. Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.

Cass
Crow Wing
Recipient
Wadena Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide Stressor ID work and assistance for the development of a work plan for the Major Watershed Project. The Major Watershed Project will include a plan for civic engagement and outreach, with assistance from ten Local Government Units from the Crow Wing River Watershed.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Crow Wing County SWCD
2020 Fiscal Year Funding Amount
$69,724
Fund Source

The project will include lake and stream monitoring. Lake monitoring will be completed on twenty lakes found in The Crow Wing River Watershed - West Crow Wing County (CWC) & Southern Cass County for 2020. There will be 11 streams sampled located in Crow Wing, Cass, Wadena and the border of Cass/Morrison Counties 2020 & 2021. The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Cass
Crow Wing
Morrison
Wadena
Recipient
Crow Wing County SWCD
2016 Fiscal Year Funding Amount
$48,450
2017 Fiscal Year Funding Amount
$6,326
Fund Source

The project will include lake monitoring on seventeen lakes found in the Mississippi River - Brainerd watershed in East Central Crow Wing County (CWC). The project will be conducted in an effort to gain data on these data-deficient lakes. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP). Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.

Aitkin
Crow Wing
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wadena Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$30,000
Fund Source

This project will initiate project coordination among project partners. It will enhance civic engagement and outreach endeavors activities to support Phase 2 of TMDL project. It will also support field activities associated with stressor ID work.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Wadena
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Grant
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Nobles
Otter Tail
Pipestone
Pope
Redwood
Renville
Rock
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Lower Mississippi River Watershed Management Organization (LMRWMO)
2012 Fiscal Year Funding Amount
$189,999
2013 Fiscal Year Funding Amount
$29,995
Fund Source

This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Hubbard Soil & Water Conservation District (SWCD)
2012 Fiscal Year Funding Amount
$69,990
Fund Source

This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Tetra Tech, Inc.
2012 Fiscal Year Funding Amount
$4,999
Fund Source

This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Cass County Environmental Services Department
2013 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the Pine River watershed. The civic engagement plans will be incorporated into the long term plans for the major watershed project.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Renville County c/o Hawk Creek Watershed Project
2012 Fiscal Year Funding Amount
$149,860
Fund Source

This project will establish a framework and provide tools for local government and watershed projects to engage the public in a manner that will lead to water quality improvement through targeted and prioritized implementation of watershed management practices. The major components of the watershed approach that will be used for this project include; monitoring, gathering of watershed information, assessment of the data, develop of implementation strategies, and implementation of water quality protection and restoration activities.

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine