This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.
The goal of this project is to offer grant funding to boat marinas located in Washington County on the St. Croix River to complete water quality improvement projects. St. Croix marinas own large amounts of shoreline plus there are roads, parking areas, buildings, and garages. These all produce runoff that drains directly into the St. Croix River. Marinas also often include pollution hotspots due to the presence of boat fueling areas.
The Crow River is a major river system in Wright County that is of local and regional significance. It is a major recreation area in its own right but also flows into the Mississippi River 20 miles from the Minneapolis Drinking Water Plant intake. Elevated sediment levels in the river increases the cost of treating the river water and threatens fisheries habitat.
Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.
This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.
This project will establish a framework and provide tools for local government and watershed projects to engage the public in a manner that will lead to water quality improvement through targeted and prioritized implementation of watershed management practices. The major components of the watershed approach that will be used for this project include; monitoring, gathering of watershed information, assessment of the data, develop of implementation strategies, and implementation of water quality protection and restoration activities.
This project will consist of identifying the candidate causes of biological stress and to develop and implement a public and stakeholder participation process that encourages local ownership of water quality problems and solutions. The Stressor ID process will be done using existing data, identifying data gaps, gathering new data, developing load duration curves, and refinement of the candidate causes. The civic engagement work will include compiling and reviewing existing data on community capacity and assessing that information.
This project will provide Agency staff, local partners and the citizen volunteers with a framework for building local capacity to design civic engagement and communication / outreach efforts. This will contribute to meaningful and sustained public participation in surface water protection and restoration activities throughout the watershed. MPCA staff, local partners and citizen volunteers will also be able to integrate the results of the biophysical and community assessment into strategies for improving water bodies on the MN 303d List of Impaired Waters
This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.
This project includes project planning, coordination, stream reconnaissance, and begins the effort towards civic engagement/outreach components of the South Fork Crow River Watershed project. Phase I will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and conducting limited lake and stream monitoring.
This project approach will include monitoring and gathering of watershed information, assess the data, develop implementation strategies to meet standards and protect waters, implement water quality protection and restoration activities in the watershed. The goal of this project is to establish a framework, and to provide information and tools for local government and watershed organizations to engage the public in a manner that will lead to water quality improvement.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.
This project will offer incentives to protect 80 acres of land in filter strips and highly erodible lands adjacent to the rivers; construct 9 sediment and water control basins or terraces; replace 35 open tile intakes and advocate wetland restorations and grassland easement programs; organize a Friendship Tour to bring together Minnesota farmers, county commissioners, farm organizations, local, state and federal agency personnel to experience the watershed, farming practices, discuss future project ideas and strengthen relationships; and upgrade 37 subsurface sewage treatment systems by off
The Comfort Lake Forest Lake Watershed includes numerous private ditches and partially drained wetlands which are a priority for mapping, assessment and restoration. The project will include the mapping and assessment of all drained and partially drained wetlands in the watershed. In addition, a web-based GIS system will be developed to inventory, assess, target and track the effectiveness of various conservation practices towards the attainment of water quality goals.
This project will collect intermediate watershed load monitoring data on the Bigfork River which is critical to the identification of stressors and assist in defining areas of concern within the Bigfork Watershed and its greater Rainy River Watershed. Itasca County SWCD will closely collaborate with Koochiching SWCD and MPCA on this project.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.
Comfort Lake is one of Chisago county's largest recreational lakes. Comfort Lake is of regional significance with public access for boating, fishing and swimming. A pollution reduction study was conducted for the lake because of decreasing water quality. This study identified highly urban areas as one of the sources of nutrients.
This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
In partnership with the Washington Conservation District and City of Woodbury, this project will improve water quality in Colby Lake through implementing 30 priority small-scale water quality conservation practices. Projects may include bioretention, vegetated swales and pond modifications. Priority projects were identified as part of the Colby Lake Watershed Retrofit Assessment and represent the most cost-effective means to reduce excess phosphorus loads that have impacted Colby Lake.
In collaboration with the University of Minnesota St. Anthony Falls Laboratory, City of Stillwater and MN DNR Waters and Fisheries an iron-enhanced sand filter will be designed. This filter will remove approximately 118 pounds of total phosphorous per year from an area of Stillwater that ultimately drains to the St. Croix River, a national Wild and Scenic River that has a decling water quality trend.
The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.
This project supports the planning, coordination and civic engagement/outreach components of the Leech Lake River Major Watershed project. Phase 1 will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data. Phase II of this project will focus on source assessment, running of watershed modeling scenarios, lake protection planning, stressor identification and the continuation of the Civic Engagement components of the project.
Lily Lake, near Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake's water quality is declining because of excess nutrients. Restoring it is a priority for the community of Stillwater.
Lily Lake,near Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake's water quality is declining because of excess nutrients. Restoring it is a priority for the community of Stillwater.
This project is a continaution project of the Phase I project that started in the spring of 2011 and complements the Phase II project recently funded in 2012. Specifically, this project will implement two large stormwater retrofits in large parking lots of DiaSoren Manufacturing and the Valley Ridge Mall.
This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.
Due to its high water quality, protecting Martha Lake is a prioirty for Wright County. A monitoring study of the tile system outlet that flows into Lake Martha revealed high amounts of dissolved phosphorus were entering the lake through the tile system. This validated the concerns of the Lake Martha Lake Association.
MuKusick Lake's water quality is declining because of excess nutrients and restoring it is a priority for the Stillwater community.
This project will work to implement priority stormwater treatment projects that were identified in the 2010 McKusick Lake Stormwater Retrofit Assessment. This project will be the first phase of stormwater treatment implementation projects within the McKusick Lake watershed and will provide approximately 10% of the needed phosphorus reduction.
Through a long standing partnership, this project will continue to implement a process formalized with a 2010 Clean Water Fund Grant to conduct stormwater sub-watershed assessments. The goal of the sub-watershed assessments is to accelerate water quality improvements by focusing efforts in high priority areas. Specifically, subwatershed assessments are a tool used to identify the most effective urban stormwater conservation practice by location.
This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.
This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.