The goal of this project is to perform water quality monitoring and load calculation duties to accomplish MPCA's Watershed Pollutant Load Monitoring Network monitoring efforts at seven sites for the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton.
This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.
Widseth Smith Nolting (WSN) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
The primary goal of this project is to analyze of dated sediment cores to reconstruct changes in the lake condition over the last 150 years. This will be done using multiple lines of evidence including biogeochemistry, sediment accumulation, and diatom and algal remains as biological indicators.
This grant to the City of Morris provides public improvements for the beneficial use of wastewater effluent, where beneficial use is defined as the use of stormwater or wastewater effluent from a publicly owned wastewater treatement plant to replace the use of groundwater.
The goal is to facilitate strategic networking, learning, and implementation in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed
This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.
This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.
This project builds on past successful civic engagement efforts and will focus in on critical problem areas, to both identify the contributing areas of pollutant and also outreach to identify the most likely landowner contacts and engagements for continued success in the watershed. Field monitoring will refine what is currently known about pollutant inputs. Several outreach events will target specific landowner groups to provide forums on best management practices in forestry management and lakeshore/riparian stream buffer management.
Carver County Staff will monitor Silver Creek at station S000-843 following the basic monitoring regime. S000-843 is located in the Lower Minnesota subwatershed in southeastern Carver County. The monitoring will be conducted from 2014 to 2015 and include 13 site visits in 2014; collecting TSVS, TSS, Total P, Ammonia-N, TKN, NO2+NO3, Sulfate, Chloride, and Hardness as CaCO3 ten times. E.coli will be collected nine times in 2014.
This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.
This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.
There are two main goals of this Cedar Basin HSPF project,
A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and
B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Duluth area streams received over 10 inches of rainfall on June 19 and June 20, 2012. This "500 year event" provides a once in a lifetime opportunity to further understand sediment movement and stream channel alterations due to an event of this magnitude.
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.
The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.
The goal of this project is to develop a core team of wastewater professionals and academics engaged in understanding and solving wastewater-related problems in Minnesota, with national relevance. The team will promote the use of new technology, designs and practices to address existing and emerging wastewater treatement challenges, including the treatement of wastewater for reuse and the emergence of new and unregulated contaminants.
The goal of this project is to develop and complete the Watershed Restoration and Protection (WRAP) process and report, while also enlarging and sustaining a public participation process that encourages local ownership of water quality problems and solutions (civic engagement).
Civic engagement strategies including education public participation in watershed work and expanded knowledge, technical input into and review of stressor id process and report, Total Maximum Daily Load (TMDL) reports, implementation plans and protecion strategies.
The project work for this effort includes watershed wide civic engagement and technical support to the final years of Watershed Restoration And Protection Strategy (WRAPS) work. Communication to stakeholders and other key civic based activities to share WRAPS information will be completed. The Cook County Soil and Water Conservation District (SWCD) will also provide technical support to aid completion of the Total Maximum Daily Load (TMDL) report and help define protection and restoration strategies for the watershed.
Cook County Soil and Water Conservation District (Cook SWCD) will be working with up to four volunteers in the Rainy River Watershed Headwaters to monitor the Cross River during 2014 and 2015.The area of the stream being monitored is located 45 miles north of Grand Marais, MN. The area is remote and travel is slow to the stream. It is an area that was affected by fires with vegetation in the beginning years of succession. There are lodges, resorts and residents scattered throughout the area. The parameters monitored are set by the MPCA, along with the frequency of sampling.
This project will establish a framework with County, Soil and Water Conservation District and watershed staff that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Cottonwood River and Redwood River watersheds.
The Minnesota Pollution Control Agency (MPCA) offers grants to counties for Subsurface Sewage Treatment System (SSTS) program administration and special projects to improve SSTS compliance rates, and assistance for low-income homeowners with needed SSTS upgrades. The MPCA will determine grant allocations based on applications review; funds will flow to counties through the Board of Water and Soil Resources' Natural Resources Block Grants.
The project will include lake monitoring on seventeen lakes found in the Mississippi River - Brainerd watershed in East Central Crow Wing County (CWC). The project will be conducted in an effort to gain data on these data-deficient lakes. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP). Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
The Minnesota Pollution Control Agency (MPCA) has identified streamflow alteration as a key stressor on aquatic life, but the characteristics of streamflow alteration acting as stressors have not been identified in the MPCA Watershed Restoration and Protection Strategy (WRAPS) process. Without indices that characterize streamflow alteration, the MPCA cannot quantitatively associate metrics of aquatic life condition to streamflow alteration. The lack of quantifiable indices limits the ability of the MPCA to assess environmental streamflow needs for streams and rivers throughout Minnesota.
This project is for the Duluth Streams Urban Watershed Restoration and Protection Strategy (WRAPS). The project is a core part of the WRAPS and Total Maximum Daily Load (TMDL) development for the Duluth Metropolitan Area (DMA).
This project is the continuation of efforts to restore and protect watersheds and streams in Minnesota’s Lake Superior coastal region. The project provides the means to evaluate water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for impairments, and to evaluate and recommend protection strategies for high quality water resources. It also leverages and encourages adoption of locally driven solutions to watershed management and protection.
This project will gather long term watershed data necessary for assessment, stressor identification work, and Watershed Restoration and Protection Strategy (WRAPS) development work for Elm Creek and the Blue Earth Watershed.
This project will determine the magnitude and frequency of contamination from endocrine active compounds (EAC's) and other contaminants of emerging concern in shallow groundwater in non-agricultural areas of Minnesota. EACs and other contaminants of emerging concern in this study include compounds typically found in waste water, including, pharmaceutical compounds, antibiotics, and hormones. This project supports the third phase, including laboratory analysis of samples for an additional 80 wells to be sampled by MPCA staff.
The contractor will add more functionality to HSPEXP+ Hydrological Simulation Program FORTRAN (HSPF) tool and conduct 2016 HSPF Modeling Contractors Meeting
The goal of this project is to enhance the current version of the Enhanced Expert System for Calibration of HSPF (HSPEXP+) so that it can more easily and quickly be used for hydrology calibration, water quality calibration, generate reports and graphs.
The Bell Museum will sort and identify all fish samples collected by the Minnesota Pollution Control Agency's (MPCA) North and South Biological Monitoring Units. The Bell Museum of Natural History (Bell Museum) will provide professional fish Identification expertise to the MPCA fish voucher program, while also helping the Bell Museum annually update their fish distribution map for the State of Minnesota. As the MPCA samples and vouchers species of significance, the Bell Museum shall catalog these species into their official fish collection.
This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.
Groundwater sample collection and analysis will be conducted for contaminants of emerging concern (CEC) at large subsurface treatment systems (LSTS) and rapid infiltration basins (RIB), using an enzyme linked immunosorbent assay (ELISA) methodology. Results from the ELISA analysis will be reported to the Minnesota Pollution Control Agency (MPCA) and used to conduct follow-up investigations at a select number of these sites.
The stream monitoring will follow the stream monitoring parameters and frequency tables outlined in the Surface Water Assessment Grant (SWAG) Request for Proposals (RFP). Specifically over the two-year grant period, monitoring will include 19 sets of field measurements for specific conductance, temperature, pH, dissolved oxygen, secchi tube readings, and one upstream photograph at each visit.