The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.
This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.
The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
Provide contract management to ENRTF pass-through appropriation recipients for approximately 115 open grants. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved work plans.
This proposal accelerates the strategic permanent protection of 1,003 acres (241 wetlands and 762 grasslands) of Waterfowl Production Areas (WPAs) open to public hunting in Minnesota. Pheasants Forever (PF) will strategically acquire parcels that are adjacent to existing public land or create corridors between complexes. All acquisitions will occur in the prairie, prairie/forest transition, or metro regions.
This Phase XIII proposal permanently protects and restores 659 acres of Waterfowl Production Areas (WPAs) open to public hunting in Minnesota. Pheasants Forever (PF) will acquire parcels that are adjacent to existing public land or create corridors between complexes. All acquisitions will occur in the prairie, prairie/forest transition, or metro regions. Acquired properties will be restored to the highest extent possible with regard to time and budgets.
This proposal accelerates the strategic permanent protection of 611 acres (122 acres of wetlands and 489 acres of grassland habitat) of Waterfowl Production Areas (WPAs) open to public hunting in Minnesota. Pheasants Forever (PF) will strategically acquire parcels that are adjacent to existing public land or create corridors between complexes. All acquisitions will occur in the prairie, prairie/forest transition, or metro regions.
The proposal was to accelerate the protection of 1,220 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. Over the course of the appropriation, we acquired 11 parcels for a total of 1,484.05 acres which exceeded our total acre goal of 1,220 acres by 264.05 acres. Breaking down acres by ecological section we acquired 876 acres in the metro, 152 acres in the forest/prairie, and 456 acres in the prairie. We have a balance of $52,798 that will be returned to the Fund despite exceeding our acre goals.
This program will complete the initial WMA site development on 1,500 acres of land acquired in the Accelerated Prairie Grassland WMA and Accelerated Wetland WMA Acquisition programs to meet standards for inclusion in the Outdoor Recreation System. This program will also accelerate the restoration, enhancement and management of at least 5,180 acres of native prairie vegetation on existing public lands.
Pheasants Forever, Ducks Unlimited, and the U.S. Fish and Wildlife Service will cooperate to permanently restore and conserve approximately 800 acres of grassland and 400 acres of wetland as Waterfowl Production Areas in western and southern Minnesota. All lands acquired through this grant proposal will be owned and managed by the Service as part of the National Wildlife Refuge System.
This programmatic partnership between the Minnesota Department of Natural Resources (DNR) and Ducks Unlimited (DU) will accelerate enhancement, restoration, and protection of shallow lakes and wetlands important to waterfowl. This partnership will assess, design, and implement shallow lake and wetland enhancement, restoration, and protection projects to address the most important wetland issues facing waterfowl and other wetland wildlife in Minnesota.
The table below provides a short summary of the acres and sites accomplished. We enhanced or restored 59,495 acres in 458 separate habitat projects.Project Type # Sites # AcresFencing for conserv grazing 6 721grassland conversion 33 1,124Invasive Species Control 43 1,599mowing 3 104Prescribed burn 214 48,368Restoration 13 123Woody Removal 146 7,457
This program accelerated the permanent protection of 1,001 acres of wetlands (185 acres) and grasslands (816 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 5 parcels for a total of 1,001 acres which exceeded our total acre goal of 935 acres by 66 acres. Breaking down acres by ecological section we exceeded our acre goal in the prairie area by 346 acres. We are also happy to bring in $3,794,200 of non-state match dollars to this effort, exceeding our match goal of $3,320,000 by $474,200. We h
This proposal accelerates the permanent protection of 900 acres of wetlands (225 acres) and grasslands (675 acres) as Waterfowl Production Areas open to public hunting in Minnesota.