There are seven major watersheds Koochiching County, this project will work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters watersheds. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategy (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, TMDL (Total Maximum Daily Load) development, modeling scenarios, and WRAPS development.
The Rainy River Basin WPLMN Sampling Program will focus on watershed load monitoring in the Big Fork River, Little Fork River, Rainy River-Rainy Lake, and Vermilion River watersheds. Four total staff will work on various portions of this agreement. The main objective is for one lead sampler and one backup sampler to collect water chemistry and field parameters for eight (8) sites, annually at various flows, especially peak flows, and utilize that data to determine the amount of pollutant load into each stream system.
The purpose of this contract is to establish an international watershed coordinator for the Rainy River- Lake of the Woods (RR-LOW) watershed. The coordinator will assist the Minnesota Pollution Control Agency (MPCA) in facilitating and enhancing civic engagement and public participation activities through collaboration and integration of the efforts of groups working on watershed activities at local, state/provincial, tribal, and bi-national levels.
The Rapid River Watershed Restoration and Protection Strategy (WRAPS) project will result in the development of the restoration and protection strategies for the watershed and engage the local stakeholders in the practices of watershed management. This project will also develop Total Maximum Daily Loads (TMDLs) for impaired waters.
Over the course of several months, the women's textiles and all quilts were evaluated based on condition, inventoried, photographed, rehoused, and stored appropriately. This included textiles in boxes, on a make-shift clothing rack, in drawers in the gallery, and textiles kept at the Alexander Faribault House.
The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.
The Minnesota Historical Society manages 26 historic sites and museums across Minnesota. Recognizing an opportunity to work more collaboratively with organizations where historic sites are located, the Society developed programs to expand history education and programming and elevate the level of professionalism in local history organizations.
This funding enabled site staff across the state to host workshops to train history professionals and work with local historical agencies to assess and update collections.
US Geological Survey (USGS) will perform real-time water quality monitoring at its stations located in Fargo and Grand Forks. The Minnesota Pollution Control Agency co-sponsors this work along with USGS, North Dakota Dept. of Health, the cities of Fargo, Moorhead, Grand Forks, and East Grand Forks.
The goal of this project is to development a Total Maximum Daily Load (TMDL) study that addresses all of the non-mercury-related impaired reaches along the Red River of the North (RRN). The TMDL study will provide an analytical and strategic foundation for recommending restoration strategies for impaired waters. This phase of the project will also include civic engagement efforts by providing water quality framework and stakeholder activities for civic/citizen engagement and communication.
This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.
The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.
This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.
This project will monitor nine locations in the major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The stream outlet monitoring will provide the water chemistry data needed to calculate annual pollutant loads. Staff from the Red River Watershed Management Board (RRWMB) will conduct the sampling, initially manage the data and provide the data to the Minnesota Pollution Control Agency (MPCA) for load calculations and import into the STORET data system.
Supplement design and construction cost for the redevelopment of the existing playground in the Upper Afton section of Battle Creek Regional Park consisting of demolition, grading, utilities, trails, lighting, construction, landscaping, site amenities, signage, new playground container and playground equipment, and safety surfacing The plan is to improve accessibility and play value.
We will investigate road salt alternatives and pavement innovations that will reduce or eliminate the flux of chloride from road salt into our lakes, streams and groundwater.
Stormwater runoff from the City of Kimball drains untreated into Willow Creek, a trout stream. Willow Creek is tributary to Lake Betsy, which is impaired by excess nutrients. This project targets phosphorus removal for Lake Betsy as identified in the Upper Watershed TMDL Studies for the Clearwater River Watershed and protection to Willow Creek trout habitat by infiltrating the 1.5-inch storm event off 428 acres in and around the City of Kimball.
to design and construct .91 miles of 10 foot wide bituminous trail along County Road Ditch 52, no construction can begin until all environmental documentation has been approved by the DNR
Design, engineer, & construct rehabilitation projects associated with existing trails, bridges, habitat enhancement, stormwater management and water quality infrastructure, and signage. Exact project extents and tasks will be refined during project scoping and included in the project's grant agreement.
Rehabilitation of Kenilworth Channel within the Minneapolis Chain of Lakes Regional Park to address failing walls and shorelines. Work will include design, engineering, and construction of earthwork, walls, natural habitat restoration, and landscaping.
Rehabilitate Minnehaha Regional Park Pavilion to upgrade public spaces including restrooms, open seating areas, plaza spaces, stairs, ramps, and landscaping. Work will include design, engineering, architecture, and construction
In 2008, the Hennepin Medical History Center receivedapproximately 1,700 prints and negatives from the Hennepin County Medical Center's public relations department. Since their transfer, the images have been housed in standard file folders, photo lab envelopes, and banker boxes that rest on the floor of a workroom.
Inert museum storage was created for the ethnographically and historically significant Helbing Collection of American Indian Arts and Crafts as recommended in a museum assessment.
The RIM-WRP program will expand past efforts and provide important benefits to the citizens of Minnesota by restoring and permanently protecting priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements. This funding will leverage $12.6 million of federal WRP funds for the State of Minnesota and is expected to create and sustain 343 jobs and income to local landowners, businesses and others in the state based on USDA economic estimates.
The USGS and the MPCA will determine the relative contributions of endocrine active chemicals (EACs) and pharmaceuticals from WWTP effluent to aquatic ecosystems. The primary objective is to measure the concentrations of EACs and pharmaceuticals in water samples collected from the effluents from 20 WWTPs and at sites upstream and downstream of WWTP effluent discharge in Minnesota during 2009-2011.