engineering and assistance with construction costs of a portion of the Regional Greenway through the MN Zoological Garden including a grade separated crossing of CASH 38
Appropriations from the Clean Water Fund allow the Minnesota Department of Health to expand and improve the way groundwater and drinking water protection is implemented at the local level. In 2015, $300,000 was allocated to update wellhead protection areas within groundwater management areas. From 2016 onward, funding will be dedicated to the Groundwater Restoration and Protection Strategies (GRAPS) initiative which will provide groundwater and drinking water information and management strategies on a HUC 8 watershed scale.
This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy (WRAPS) report to maintain and improve water quality for the St Louis River Watershed.
Chambers Grove: restored a natural shoreline, improved fish spawning habitat, and planted native shoreline vegetation (completed in 2015).
Kingsbury Bay: completed engineering and design; began restoration of a wetland complex impacted by excessive sediment and non-native species (to be completed Dec 2020).
Grassy Point: completed engineering and design; began restoration of a wetland complex impacted by legacy milling waste and non-native species (to be completed Dec 2020).
DNR's St. Louis River Restoration Initiative (SLRRI) advanced multiple large-scale habitat restoration projects. ML2017 funds contributed to:
-Removing 300,000 CY of invasive vegetation, sediment, and sawmill waste from the waters of Kingsbury Bay and Grassy Point, restoring approximately 230 acres of coastal marsh habitat;
-Restoring five acres of habitat at Interstate Island for a threatened avian species by beneficially using over 52,000 CY of clean sand dredged from navigation channels;
The goal of the Cansayapi Dakota Iapi (Language) Program is to establish a permanent Dakota language program at Lower Sioux that promotes continuous language learning and speaking opportunities across the generations and community.
This project builds on the momentum of previous Clean Water Fund grants in making significant and quantifiable sediment, nutrient and runoff volume reductions to address the turbidity, dissolved oxygen and other impairments of the Lower Minnesota River (LMR). These water quality improvements will be achieved by constructing on-the-ground conservation best management practices (BMPs) in the targeted watersheds -including specifically Sand and Roberts Creek - and near channel sources.
To hire qualified consultants to conduct an architectural survey of Macalester Park for possible local designation or inclusion in the National Register of Historic Places.
Maintaining Existing Holdings - A Parks and Trails Strategic Objective is a program area representing DNR's commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan calls this Take Care of What We Have, and identifies its purpose to provide safe, high-quality park and trail experiences by regular re-investment in park and trail infrastructure, and natural resource management.
The Marine on St. Croix Innovative Stormwater Management Implementation is a partnership, formalized through an MOU, between Marine on St. Croix (MOSC) and the Carnelian-Marine-St. Croix Watershed District (CMSCWD) to improve stormwater management in the most densely developed areas of the City on a neighborhood zone approach rather than site-by-site (parcel) approach for greater and more impactful results in accomplishing District and City stormwater management goals.
Phase 2 of the Marsh River Watershed Restoration and Protection Strategy (WRAPS) project includes: continued civic engagement; production of the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; and production of the WRAPS report, which identifies implementation strategies that will maintain or improve water quality in many lakes and streams throughout the watershed.
The goals of Phase I of the Marsh River Watershed (WRW) Watershed Restoration and Protection Strategy (WRAPS) project are to: 1) gather or develop watershed data needed for the development of the WRAPS project; 2) establish project and sub-basin work groups, develop a social outcomes strategy, and develop a civic engagement evaluation strategy to guide the WRAPS project; and 3) begin to identify, create, and organize tools that can be used to determine potential stressors and priority management areas.
After years of discussions, some of the most diverse riparian, mesic, and dry hillside native prairie containing the only identified remnant population of Prairie Bush Clover in Martin County is available for permanent protection. Martin County is using this appropriation to acquire and permanently protect approximately 40 acres, including 10 acres of remnant prairie. The land will be turned into a county park providing recreational opportunities for local residents and educational opportunities for area students.
Prepare a master plan amendment for Battle Creek Regional Park, Rice Creek North Regional Trail, and develop a master plan for Lexington Avenue Regional Trail including design/engineering, community engagement to identify improvements for existing elements such as buildings, roads, parking, creeks, ponds, lakes, wetlands, trails, animal exercise, amenities, turf games, landscaping, utilities, stormwater management, restoration, signage, gathering nodes, fitness/play elements, land acquisition.
McLeod County will create an inspection database for 103E ditches under their drainage authority. The County will acquire a database software solution to conduct field inspections and to track ditch maintenance projects. This software will be used to facilitate statutory compliance including developing a process for completing the annual inspection and reporting requirements. The project will lead to improving the County's data management capabilities and better identification of drainage system needs that could lead to helping improve water courses that are impaired for turbidity.
Since 2000, a diverse group of partners has been collectively working in northwestern Minnesota on one of the largest prairie-wetland restorations in the world. Spanning 22,000 acres and adjacent to an additional 16,000 acres of public and private conservation land, the goal of the Glacial Ridge Project has been to demonstrate whether large-scale habitat restoration is a viable way to reduce flooding and improve water quality. Prior to beginning restoration efforts on the project, a comprehensive baseline hydrologic study of the area was completed by the U.S. Geological Survey (USGS).
Running through the Iron Range of northeastern Minnesota, the Mesabi Trail provides a recreational and alternate transportation corridor for hikers, bikers, skiers, and horseback riders, as well as some designated snow snowmobile use areas. When completed the trail will include 145 paved miles extending from the Mississippi River in Grand Rapids to the Boundary Waters Canoe Area in Ely – 115 miles have been finished to date. The St. Louis and Lake Counties Regional Railroad Authority are using this appropriation to develop 11 miles of trail segments near Vermilion State Park.
Many types of bacteria perform critical ecological functions, such as cycling carbon and other nutrients, which enable life to exist. In fact, humans harness these types of bacteria in certain engineered systems, such as wastewater treatment plants and landfills, to provide various benefits such as protecting surface waters from excess nitrogen, decomposing solid waste, and treating wastewater.
This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.
In Phase 5, Friends of the Mississippi River and Great River Greening enhanced 277 acres at six sites, exceeding their goals by 48 acres (21%). The Minnesota Valley Trust acquired fee title to 32.4 acres for two high-priority additions to the Rapids Lake Unit, Minnesota Valley National Wildlife Refuge. The Minnesota Land Trust and the Trust for Public Land were unable to finalize their easement and fee title acquisitions when landowners changed their minds. OHF grant funds spent were leveraged more than 110% with $1,343,128 in other funds.