To provide structural repair and fire protection to the Hotel Atwater, listed on the National Register of Historic Places, for use as a municipal building.
To collect data and conduct oral history interviews on congregations and houses of worship in nine neighborhoods in the Twin Cities near the Mississippi River between 1849-1924.
To hire a qualified consultant to write a historic structure report for the Houston County Courthouse, listed in the National Register of Historic Places.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.
The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.
The goal of this project is to construct, calibrate, and validate a watershed model using HSPF. RESPEC will produce a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.
A professional heating, ventilation and air conditioning (HVAC) engineer was hired to conduct an HVAC evaluation comparing the relative merits and costs of a conventional HVAC system with a geothermal system. The result was the geothermal system was more expensive with a fifty-year payback term. Purchasing a conventional system was recommended as the upgrade for meeting climate standards.
To hire a qualified HVAC engineer to prepare planning documents for a future project to improve environmental conditions for the Elysian School, listed in the National Register of Historic Places
To hire a qualified and experienced HVAC engineer to evaluate the current system preparatory to better control of the McLeod County Historical Society museum environment.
To hire a qualified and experienced HVAC engineer to evaluate the current system in preparation for better control of the Northfield Historical Society museum environment.
To implement recommendations from an HVAC evaluation that will ensure better climate control for the preservation of historic resources documenting Itasca County history.
An interpretive exhibit was created with table displays using historically factual text and illustrative photographs and a short play was developed to tell the story of how the dam was built and its affect on the local people and economy. The exhibit counters negative impressions about the dam and provides little known information to the public.
This project will address the numerous recommendations included in the original Guidance Document to provide an updated and improved Guidance Document. This improved guidance will help to ensure consistency and validity of future HSPF model applications within the State as part of the One Water Program.
This project will construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs) at the Big Fork River and Little Fork River watersheds.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
The goal of this project is to develop a watershed-scale decision support tool, Scenario Application Manager (SAM), to facilitate prioritization and placement of best management practices (BMPs) needed to achieve the necessary reductions identified by various watershed management programs in Minnesota. SAM consists of a Geographic Information System (GIS) for site selection, and Hydrological Simulation Program – Fortran (HSPF) model application to simulate the transport of pollutants.
Development of Target NPS loading rates along with a pollutant source allocation tool for assessing and quantifying source allocations for impaired stream reaches for use in the TMDL development.
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
This project is sixth in a series between the India Association of Minnesota and the Minnesota Historical Society. It was developed to convey the history of the Indian Music Society of Minnesota (IMSOM) in three ways:
1. The collection and transcription of seven interviews telling the oral history of IMSOM.
2. The digitization of thirty years of concert performance recordings by leading musiciains from India as well as local artists.
Lebanon Regional Park, implement elements of the Visitor Center Interpretive Concept Plan to engage, educate, inform and encourage stewardship and preservation.
The Emerald Ash Borer (EAB) is an invasive insect that has been decimating ash trees throughout the Great Lakes states. It was first discovered in Minnesota in 2009 and is now found in four counties (Hennepin, Houston, Ramsey, and Winona). EAB poses a particularly serious threat to Minnesota because it is home to nearly 1 billion ash trees that occur throughout the state - the second most of any state.
Minnesota has 15.9 million acres of forest land managed by a variety of county, state and federal agencies, and private landowners for timber production, wildlife habitat, and ecological considerations. Forest managers rely on inventory data to make effective planning and management decisions. Because forests are continually changing through natural and human processes, forest inventory data is periodically updated. However, doing so is an expensive and time-consuming endeavor and, as a result, much of Minnesota’s forest inventory data is currently out of date.
The Emerald Ash Borer (EAB) is an invasive insect that has been decimating ash trees throughout the Great Lakes states. It was first discovered in Minnesota in 2009 and is now found in four counties (Hennepin, Houston, Ramsey, and Winona). EAB poses a particularly serious threat to Minnesota because it is home to nearly 1 billion ash trees that occur throughout the state - the second most of any state.
Agricultural drainage is very prevalent practice in Dodge County and there is a need to implement practices to that will better manage flow and pollutant loads that are being contributed to nearby surface waters. This project involves the installation of a woodchip bioreactor on a tile-drained agricultural field, which will feature improvements in design, and monitoring scope, as compared to a previous bioreactor constructed in Dodge County in 2007.
Nokomis-Hiawatha Regional Park, contract trail, path, seating, concessions, and shoreline improvements and play area rehabilitation. Includes site furniture, landscaping, site utilities and lighting, design and engineering, project management.
To upgrade the HVAC system and insulation at The Charles A. Weyerhaeuser Memorial Museum in order to both meet museum and historic preservation standards.
The Diversity Committee guides MNHS in relation to its strategic priority for diversity and inclusivity. The team meets regularly to discuss current offerings, interactions with various diverse communities and provides services for MNHS to increase cultural competency of staff. The committee activities have emphasized training and development of staff, choosing the Intercultural Development Inventory (IDI) as an assessment tool to provide a benchmark of the current state of intercultural competency with the plan of reassessing at a later date to gauge improvements.
Demand for Engineering services in Northeast Minnesota's nine-county Area III Technical Service Area is exceeding the capacity to deliver the needed services. There are increased requests from Soil and Water Conservation Districts for engineering needed to design and install Best Management Practices in part due to requests related to Clean Water Fund projects. These funds will be used to hire an engineer, which will increase engineering capacity and result in the completion of at least five additional projects per year.
Partner Organizations: Northfield Historical Society, Rice County Historical Society, Carleton College, St. Olaf College, The Northfield Public Library, Northfield News, KYMN Radio, Northfield Arts Guild, Northfield Hospital, First National Bank of Northfield, St.