To hire a qualified historian to complete an updated nomination to the National Register of Historic Places for the historic Minnetonka Town Hall, now owned and used by Minnetonka Community Church.
Phase VIII of the RIM Camp Ripley Sentinel Landscape ACUB Partnership utilized permanent RIM conservation easements to acquire 1,755-acres of high quality habitat within the ACUB work area. We secured 7 easements including the two one contiguous block but done as two easements for legal reasons) Cushing Land Company easements that totaled 1,464 acres. In total one of the largest RIM easements ever acquired.
Phase 12 of the Camp Ripley Sentinel Landscape ACUB Partnership will utilize permanent conservation easements (BWSR RIM) to acquire 790-acres of high quality habitat in order to accomplish: PERMANENT PROTECTION of habitat corridors and buffers around public lands, PRESERVE open space within the CRSL, and conservation enhancement and restoration PRACTICES to protect soil and water quality and habitat corridor connectivity.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
To hire a consultant to conduct a study and provide a report on the viability of a consolidation and/or strategic alliance of six historical organizations connected to Lake Minnetonka.
Initial project was Design and Construction of a trail bridge over County State-Aid Highway 19 for the Lake Minnetonka LRT Regional Trail. 2015 Legislature amended project to "save trail crossing". PAT Legacy (F14-15) matched with $1,040,000 in federal funds.
THA erected an interpretive marker at the site of the former Carlos Boynton Land Company Ranch to provide public access to the story surrounding the ranch.. Volunteers provided the labor to dig the post hole, install the post and mount the weather-proof marker.
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
In 2022, the Minnesota Pollution Control Agency (MPCA) will engage in Intensive Watershed Monitoring in the Missouri River Basin which includes four watersheds. Through this agreement, the Pipestone Soil and Water Conservation District will assist with this effort by monitoring seven stream sites in three of the targeted watersheds. The sites are located on Medary Creek, Flandreau Creek, Pipestone Creek, Rock River (x2), Poplar Creek, and Chanarambie Creek. The sites were chosen by the MPCA and agreed upon by local entities.
This project includes: 1) Storytelling through Identity Exploration and Narratives within a public sphere uses traditional methods of puppeteering and textile techniques to address contemporary issues; 2) Public Art On-Point On-Site is about transforming a public space to reflect community values; 3) The Power of Print uses innovative versatile contemporary print methods for making multiple statements; and 4) How to Navigate the Artworld even when you are in the Midwest. Each ENCUENTROS theme will have a series of three events.
To support and assist central Minnesota artists at various stages in their careers by providing them with opportunities to work one-on-one with a professional artist over a one or two year time frame to advance their skills as an artist.
To support and assist central Minnesota artists at various stages in their careers by providing them with opportunities to work one-on-one with a professional artist over a one or two year time frame to advance their skills as an artist.
To support and assist central Minnesota artists at various stages in their careers by providing them with opportunities to work one-on-one with a professional artist over a one or two year time frame to advance their skills as an artist.
To support and assist central Minnesota artists at various stages in their careers by providing them with opportunities to work one-on-one with a professional artist over a one or two year time frame to advance their skills as an artist.