At Central Mississippi Regional Park, implement the master plan including design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Implement the Water Works portion of the 2015 Central Mississippi Regional Park master plan pending adoption by the Metropolitan Council. Work will include design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Design & engineering to develop building plans for a addition to the Nature Center, Sugar Shack, Garden House, Shelters, and Maintenance Facility. Develop site plans for gathering nodes, observation, amenities, trails, landscaping, signage, stormwater management; initiate construction for site related improvements such as trails, gathering nodes, nature observation, signage, landscaping, and site amenities. Supplement construction costs for amenities on the Campus Site and Infrastructure project.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
This project will determine the historical distribution, abundance, and toxicity of the invasive blue-green alga, Cylindrospermopsis raciborskii, in Minnesota lakes using a combination of paleolimnological and contemporary monitoring techniques
This project will address the critical need of Dakota and Ojibwe immersion schools to have a standardized system for determining reading levels for the Dakota and Ojibwe languages by developing an agreed upon method for assessing the readability of the languages.
This project will establish a surveillance system to monitor wildlife health in Minnesota through development of information management and analytical systems utilizing wildlife rehabilitation data.
The acquisition of high-resolution sonar data provides important information essential for mapping mussel habitat while having ecological applications useful to resource managers and policy makers protecting Minnesota threatened/endangered native mussels.
This project is to develop a small cheap purification system for community drinking water facilities to remove toxic contaminants. The technology is highly efficient to improve current drinking water quality.
We propose to develop a genetic control tool that exploits the natural process of RNA silencing to effectively control zebra mussels without affecting other species.
Solar windows are a disruptive photovoltaic technology that virtually invisibly integrates with buildings. This renewable energy technology will increase photovoltaics adoption, reduce air pollution, and ameliorate climate change.
This project is to develop cheap clean solar energy by simple roll-to-roll manufacturing. Perovskite is a new photovoltaic material, very economical while maintaining high power conversion efficiency.
A biodegradable product will be developed to replace non-degradable petroleum based plastic used in vegetable and fruit production. This project, if funded, will revolutionize horticulture in Minnesota, and potentially worldwide.
Design and evaluate 10 market-based scenarios for perennial cropping systems and their potential to improve water quality and provide wildlife habitat. Create awareness through thought-provoking videos, fact sheets, and presentations.
Develop strategies and practical tools to identify conditions that minimize impacts to soil across a wide range of conditions to promote regeneration of diverse forests, wildlife habitat, and timber availability.
3.5 mile long bituminous surface trail beginning at the intersection of Hwy 169 and County Road 88 to Ely. In Ely, connection will be made to existing Mesabi Trail.
Create a master plan for Minnehaha Parkway Regional Trail through extensive engagement with the community. Create a new master plan to provide direction for connecting more people to parks through future capital investment, and promote the park through its community engagement.
Develop and implement nature and outdoor recreation programming for people of color and lower income levels throughout Ramsey County Regional Parks and Trails system.
Develop and implement nature and outdoor recreation programming for people of color and lower income levels throughout Ramsey County Regional Parks and Trails system.
Design & engineering for final trail construction from Buerkle Road to Highway 96 including design & engineering for trails, sidewalk, storm water management, wetland impacts, landscape, signage, pedestrian bridge, site amenities; and design/engineering for preliminary trail extension plans between Highway 96 to County Road J consisting of design/engineering for trail alignment, amenities, conceptual pedestrian bridge, grading, landscaping, stormwater management, and signage; and prepare a master plan amendment for the Bruce Vento Regional Trail including design/engineering, commun