to install solar thermal hot water heating system for the bathhouse building and the concessions building as part of the park swimming pool replacement
Full reconstruction of parking lots and associated entrance drives, path connections, and curbs into Como Regional Park, including asphalt and concrete removal, excavation, grading, stormwater management, erosion control, paving and concrete work, lighting, and landscaping
To preserve the stories known only to older members of the community a narrative history of Silver Bay, Minnesota was compiled using interviews of longtime residents. The students of William M. Kelley High School recorded and transcribed 15 hours of small-group and individual interviews of 44 early and former residents of the town including officials and employees of Reserve Mining Company. These interviewees relate their experiences of living and working in the area. Silver Bay was established as a "company town" in the late 1950's and remained as such into the early 1980's.
At Lilydale Regional Park, completion of construction work started in 2009 with a FY 2010 Parks and Trails Fund Grant and new design/engineering/construction documents for picnic shelter, lake picnic area and middle section road re-alignment including utilities and lighting.
Lake Elmo Park Reserve. Complete Winter Recreation Area development that was started with FY 2010 Parks and Trails Fund grant including: plan winter recreation area project, develop or re-develop recreation facilities to accommodate evening use, install lighting for ski trails and site, develop roads and parking lot, remodel or replace barn for use as a trailhead, and provide signage and other amenities to enhance park visitor's experience
At Bald Eagle-Otter Lakes Regional Park, complete 2 acre Nature Play Area and 1 acre Children's Garden (including garden house for multi-purpose programs) at Tamarack Nature Center that was started with the FY 2010 Parks and Trails Fund grant and other funds.
Plan and implement a five-day immersion methodology training session for 20 Dakota participants, with a follow up weekend workshop. Create a thematic based immersion curriculum, along with assessment tools, for Dakota learners that will be available in print and via an interactive web page. Implement two successful intergenerational immersion sessions for a total of 80 participants, by hiring/training leaders and staff.
Central Mississippi Riverfront Regional Park, Above the Falls Regional Park. Conduct a design competition to develop a next generation park master plan for the Minneapolis Riverfront Regional Parks at an estimated cost of $350,000. And complete initial planning and engineering documents for restoration and development of the Mill Ruins Park Headrace facilities in Central Mississippi Riverfront Regional Park at an estimated cost of $212,000. MRPB staff will be working with the Met Council staff to update this scope of service, with confirmation of the scope change in July 2011.
Students will get outdoors for hands-on learning focused on water quality, groundwater, aquatic life, watershed health and their role as watershed stewards. Introductions to fishing and conservation will be offered.
Connecting People to the Outdoors - A Parks and Trails Strategic Objective is a program area representing DNR's commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan identifies its purpose to better develop Minnesota's stewards of tomorrow through efforts to increase life-long participation in parks and trails. The purpose of this program is to call attention to the pillar, but also to centralize and streamline reporting on other related programs within the pillar.
As of 11/1/2022, the CPL program has provided over 900 grants totaling $109 million to over 200 different grantee organizations, improving or protecting over 339,000 acres of habitat. Demand for CPL grants has continued to grow each year as new applicants hear about the program and successful grantees return. In ML 2018 there were 107 grants awarded- 18 metro grants, 20 traditional grants, and 69 Expedited Conservation Partners grants. Through these 107 grants, over 18,000 acres were restored, enhanced, or protected. Over $11M was awarded to organizations for projects.
Identify forest management actions and guidelines that maximize breeding season productivity across breeding cycle (nesting through post-fledgling) for three bird species of conservation concern: Golden-winged Warbler, Veery, and American Woodcock.
The Minnesota Zoo will improve the long-term viability of Minnesotas imperiled turtle populations by researching threats, implementing mechanisms to reduce mortality, and creating educational materials for use throughout the state.
To provide a general conservation assessment of the college archives.
A consultant was hired to conduct a general preservation assessment, to help draft a long-range plan, to assess policies and to prepare a summary report with prioritized recommendations for the future. This was accomplished with a one-day on-site visit and a four day period to write the Preservation Needs Assessment Report. A list and action plan for future preservation actions has been prepared.
A conservator was hired from the Midwest Art Conservation Center to conduct a comprehensive survey of the collections at the Hennepin History Museum. The report included an executive summary, observations, digital photo documentation and a prioritized list of recommendations. This information was used to formulate a written long-range conservation plan for the museum.
A General Preservation Assessment Survey was conducted, on behalf of the Grand Portage Band of Lake Superior Chippewa, by the Midwest Art Conservation Center (MACC). From the survey and after in-put from staff, a long-range plan and funding strategy was recommended for their historic collections.
A general Conservation Assessment of and Long Range Plan for the preservation of the library's local history collections was prepared by Wabasha Public Library. The Library contracted with the Midwest Art Conservation Center to complete the project. The Plan will be used to set preservation policies, to identify storage and environmental needs, to make recommendations for disaster preparedness and to develop policy and procedures for the collections
The HCSCC contracted with the Midwest Art Conservation Center to conduct a general preservation assessment survey of the HCSCC's collections and exhibit space. The report includes long range plans for improving and preserving objects and conditions.
DCHS contracted with the Midwest Art Conservation Center (MACC) to conduct a general conservation/preservation assessment and to issue a report with recommendations for long-range planning.
The Historical society hired a qualified professional conservator to conduct a general conservation assessment of its collections and provide a long range plan for preservation. The final report summarizes the condition of the collections environment at the Reads Landing School site. Recommendations include a collection review and inventory to be conducted. A comprehensive list of resources and suppliers was also included in the final report.
The Board of Water and Soil Resources is required to contract with the Conservation Corps of Minnesota and Iowa (formerly Minnesota Conservation Corps), or CCMI, for installation of conservation practices benefitting water quality for at least $500,000 in each year of the 2010-11 biennium.
Battle Creek Regional Park, construct 1-mile paved off-road bicycle and pedestrian trail on the north side of Lower Afton Road, from Pt Douglas Rd to McKnight Road. Links the regional trail system to communities including Maplewood and Woodbury.
Tetra Tech will gather information for eventual incorporation into the Minnesota Stormwater Manual. The Stormwater Manual is used by stormwater practitioners to make decisions related to stormwater management, such as selecting appropriate Best Management Practices, meeting stormwater regulatory requirements, and determining pollutant and stormwater volume reductions associated with implementation of different stormwater management practices. The goal is to update existing information and provide new information on active construction site erosion prevention and sediment control.
A partnership of local, state and federal organizations has used multiple funding sources to target nonpoint pollution reduction efforts to the Hay Creek Watershed, a 24-square-mile area in Becker County that features several high- quality lakes. Clean Water Legacy grants were received in 2008 by the Buffalo-Red River Watershed District and in 2011 by the Becker SWCD. The grants leveraged both local and federal dollars, and it built on previous efforts to identify locations where conservation projects could provide the greatest benefits for water quality and wildlife habitat.
Continue and enhance contract management and customer service to OHF pass-through appropriation recipients for approximately 130 open grants. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved accomplishment plans.
Provide continued contract management and customer service to ENRTF pass-through appropriation recipients. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved work plans.
This summary will manage appropriations to the Minnesota Department of Natural Resources (DNR) to be passed through to third party recipients via pass-through agreements. Funding will come from the Outdoor Heritage Fund, as recommended by the Lessard-Sams Outdoor Heritage Council (LSOHC) and appropriated by the Minnesota Legislature.
In conjunction with the Board of Soil and Water Resources (BWSR), the Minnesota Pollution Control Agency (MPCA) is developing a process for public participation that can be used across Minnesota Water Quality Framework programs such as 1 Watershed, 1 Plan, Watershed Restoration and Protection Strategies (WRAPS), Total Maximum Daily Load (TMDL) studies, and others. This contract will provide support for a northern Minnesota Soil and Water Conservation District (SWCD) to assist in shaping the statewide guidance.
The South St. Louis SWCD will collaborate with the City of Duluth to implement 13 stormwater BMPs in two high priority parks in the Miller Creek Watershed. The proposed BMP locations were prioritized by the city & SWCD based on the desire to coordinate with upcoming construction planned for Lincoln Park & on the sediment impacts resulting from worsening erosion problems in Piedmont Park.
Coordinating with Partner's - A Parks and Trails Strategic Objective is a program area representing DNR's commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan identifies its purpose to enhance coordination across the large and complex network of public, private, and non-profit partners that support Minnesota's parks and trails to ensure seamless, enjoyable park and trail experiences for Minnesotans.