Prepare preliminary engineering report to help identify feasibility of adding a second intake upstream of current intake.
Prepare preliminary engineering report to help identify feasibility of adding a second intake upstream of current intake.
Design mitigation plan for floor drains that are connected to the storm sewer that discharge to a gravel pocket. Post a "No Dumping - clean water only" sign within the Inner Wellhead Management Zone