This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.
Language and Culture Resource Center to locate and centralize the existing resources relating to the Bois Forte Language and culuture. To also provide Bois Forte community with opportunities to learn the language and culture, not only in an edcuational setting but also in a hands on setting while engaging cultural practices.
This project proposes the implementation of 10 best management practices identified as having the lowest cost-benefit ratio as it relates to phosphorus reduction to downstream Moody and Bone Lakes with an estimated reduction to watershed phosphorus loads to Bone Lake by 90 pounds per year and to Moody Lake by 24 pounds per year. The Bone Lake watershed is at the ?top? of the larger watershed, making it an ideal location to begin work that will have direct improvements downstream.
Healthy communities and healthy water is a priority in Crow Wing County (CWC). The County and the Crow Wing Soil and Water Conservation District (SWCD) propose to enhance and improve the water quality of Little Buffalo Creek, a tributary to the Mississippi River. The SWCD will partner with CWC, the City of Brainerd, citizens, Central Lakes Community College, and the Minnesota Department of Natural Resources to complete raingardens, shoreline stabilizations, and bioretention areas within the Little Buffalo Creek subwatershed.
Brown's Creek Watershed District, the MN DNR Trails and Countryside Auto Repair will partner to achieve significant thermal and sediment reductions in the biologically impaired Brown's Creek by installing one large scale rain garden with infiltration, one pretreatment chamber for sediment capture off of parking and drive lanes, and a two cell bio-filtration garden. The entire project site is intensely utilized, drains untreated water to Brown's Creek, and is located on the developing Brown's Creek State Trail.
Brown's Creek Watershed District (BCWD) has identified this project as a part of the Brown's Creek TMDL Implementation. The identified untreated residential development in Stillwater directly contributes stormwater to Brown's Creek, a DNR designated trout stream currently impaired for turbidity and lack of cold water assemblage. The main stressors for Brown's Creek are total suspended solids and thermal loading.
Supplemental design of the regional trail segment from Highway 96 to County Road J, including a master plan amendment and alternative trail corridor search
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.
This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).
During the Minnesota Pollution Control Agency's 2011 lake assessment process nine shallow lakes located in the Buffalo-Red River Watershed in western Becker County were determined to be impaired for excessive nutrients primarily from agricultural runoff. Located in a heavy agricultural production area, this project will address agricultural stormwater runoff by installing 50 water and sediment control basins and 20 acres of vegetative buffer strips adjacent to the lakes. Fifteen landowners with a potential for 26 water and sediment control basin sites have already been identified.
Governor Mark Dayton's landmark buffer initiative was signed into law in 2015. The law establishes new perennial vegetation buffers of up to 50 feet along rivers, streams, and ditches that will help filter out phosphorus, nitrogen, and sediment. The new law provides flexibility and financial support for landowners to install and maintain buffers. The DNR's role in Minnesota's new buffer law is to produce a statewide map of public waters and public ditches that require permanent vegetation buffers. The DNR is scheduled to produce these maps by July 2016.
To restore several Dakota City building exteriors on the fairgrounds, in collaboration with Dakota City Heritage Village. These local structures that portray a 1900 era rural village include the 1867 Vermillion Presbyterian Church, the belfry of the District 96 one room school, and the 1861 frame structure that was originally built as a school and most recently used as the millinery and dressmaker’s shop.
The Chicano Latino Affairs Council and the Humanities Center will build on the grant received last year, which was intended to identify the elements of success in programs for Latino high school students and ways to replicate them. Applying the findings of CLAC's and HACER's research, CLAC will integrate its biennium goal of improving levels of educational achievement for Latino youth with the Legacy goal of enriching Minnesota’s cultural legacy by piloting the program in two Minnesota schools.
The Red Lake River is impaired for turbidity. It is also the drinking water source for residents living in East Grand Forks. Burnham Creek is a tributary to the Red Lake River and its watershed is well known for its intensive agriculture, flat topography and frequent flooding. Over the last 20 years, head cutting of the bottom of the channel has led to bank failures, flow restrictions, sedimentation and constriction of fish passage. Soil loss from this is approximately 117 tons per year.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 12 local governments with funds.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
The Cannon River Watershed Habitat Complex Phase VIII program will protect approximately 160 acres in fee, and restore and enhance approximately 188 acres of high priority wildlife habitat within the Cannon River Watershed, including wetlands, prairies, Big Woods forest, and river/shallow lake shoreline. Its goal is to reverse habitat loss, prevent degradation of water quality, improve watershed function, and provide public access.
The goal of this project is to use a science-based and participatory approach to understanding and promoting conservation practices in the agricultural community.
This project will assess the ability of using cover crops as a best management practice to reduce nitrate leaching loss from corn and soybean acres. This contract provides funding for the coordination, outreach and field work to support implementation of the Cannon River Watershed Restoration and Protection Strategy (WRAPS) nitrogen strategy (cover crop application) in Rice Creek. Funding for the actual best management practice (BMP)cost-sharing has been secured via other sources.
Protect +/- 428 and restore +/- 175 acres near Cannon River Headwaters including wetlands, Big Woods forest, and river & shallow lake shoreline to reverse habitat loss, improve watershed function, and provide access.