Renovate Rice Creek Maintenance Shop and campground support facility to improve maintenance and operations efficiencies and improve visitor experience in park.
Impaired waters in the Red Lake River 1W1P are categorized into management classes to target impaired waters that are closest to meeting water quality standards and to protect unimpaired waters close to becoming impaired. Management areas targeted in 2018 and 2019 include the Little Black River, Black River, County Ditch 96, the Red Lake River between Thief River and Crookston, Burnham Creek, and Grand Marais Creek.
This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.
The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.
Supplement design and construction cost for the redevelopment of the existing playground in the Upper Afton section of Battle Creek Regional Park consisting of demolition, grading, utilities, trails, lighting, construction, landscaping, site amenities, signage, new playground container and playground equipment, and safety surfacing The plan is to improve accessibility and play value.
The Redwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
Design, engineer, & construct rehabilitation projects associated with existing trails, bridges, habitat enhancement, stormwater management and water quality infrastructure, and signage. Exact project extents and tasks will be refined during project scoping and included in the project's grant agreement.
Renewal of existing State Trail surfaces, parking areas, and trail wayside areas, improving accessibility, enhancing user safety and implementing current best management practices. MNDNR Parks and Trails Division has a identified approximately 85 miles of existing state trail in need of rehabilitation and upgrading. This program also focuses on the rehabilitation or replacement of existing state trail bridges, including structural engineering inspections of all trail bridges .
Construction of stormwater harvest system to complete the re-introduction of the creek as a stormwater feature and recreational amenity for trail users. This is the final phase of providing healthy stream system along the trail. The creek will provide an enhanced connection between people, development and stormwater with open water, habitat, cleaner water at the outlet and a focus for the resting spots along the trail within the former brownfield site.
To hire qualified professionals to rebuild the chancel wall in the Episcopal Church of the Good Samaritan, listed in the National Register of Historic Places.
To restore the 1935 floor of the Litchfield Opera House as close as realistically possible to its original condition: with a finished and safe surface for public and catered events.
To hire qualified professionals to repair and restore windows in the Universal Laboratories Building, listed in the National Register of Historic Places.
This program annually evaluates a sample of up to twenty Outdoor Heritage Fund habitat restoration projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice. Accomplishments are summarized in the attached 2019 Annual Report. The 2019 report focuses specifically on stream restoration.
Utilizing the new CREP III partnership to secure permanent conservation easements, this Phase 7 continuation of the RIM Buffers Program will protect and restore riparian buffer areas, totaling 4,106 acres on approximately 244 easements. This Program will continue to utilize a science-based ranking and selection process and be implemented locally, working with SWCD, NRCS, and FSA staff in the 54 county CREP area. It is estimated that $1 of OHF will be leveraged with $1 of Clean Water Funds and at least $4 of Federal funds through CREP.
Under the CREP partnership with USDA, 38 easements were recorded on a total of 2,732 acres to restore previously drained wetlands and adjacent uplands. One easement is a flowage easement that was required to complete wetland restoration work on an adjacent
Per Minnesota Law, the Minnesota Humanities Center administers the Arts and Cultural Heritage Rondo Commemorative Plaza grant. The Humanities Center uses a portion of the funds to provide grants administration, including overseeing the proposal process, agreement drafting, financial and program monitoring, and reporting.
This grant will fund an expected 44 projects in 4 subwatersheds (South Fork Root River, Crooked Creek, Rush-Pine and portions of the headwaters of the Middle and South Branch Root) and 2 DWSMAS (Chatfield and Utica). Projects include grassed waterways, WASCOBs, grade stabilization structures and cover crops, plus field walkovers, project development, and technical assistance. The anticipated sediment reduction from this work will be 2,285.5 tons, or 2.2% of the 10-year goal for the entire planning area.
The Root River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Fillmore Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations for five subwatershed sites. Samples will be collected using procedures described in the WPLMN standard operating procedures.