This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.
Language and Culture Resource Center to locate and centralize the existing resources relating to the Bois Forte Language and culuture. To also provide Bois Forte community with opportunities to learn the language and culture, not only in an edcuational setting but also in a hands on setting while engaging cultural practices.
This project proposes the implementation of 10 best management practices identified as having the lowest cost-benefit ratio as it relates to phosphorus reduction to downstream Moody and Bone Lakes with an estimated reduction to watershed phosphorus loads to Bone Lake by 90 pounds per year and to Moody Lake by 24 pounds per year. The Bone Lake watershed is at the ?top? of the larger watershed, making it an ideal location to begin work that will have direct improvements downstream.
Based on the Minnesota Waters Lake and River Association database, Crow Wing County has the highest number of lake associations in Minnesota. Currently, there are over 136 lake association groups in the county, which does not include neighborhood, resort or religious groups. These lakes aer a cornerstone to the state's tourism econmy and there is a great demand for stormwater management incentive program to protect these local water resources.
To fabricate and install an exhibit based on considerable research and consultation with numerous stakeholders about the U.S.-Dakota War of 1862 for the 150th observance in August 2012.
Supplemental design of the regional trail segment from Highway 96 to County Road J, including a master plan amendment and alternative trail corridor search
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.
This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.
This project entailed a number of small individual improvements to the park made over a 3 year period, including constructing a drinking fountain with an accessible sidewalk at the beach in Buffalo River State Park, repairing a broken water line, rebuilding the main park entrance sign, purchasing sand to stem the flooding of nearby Buffalo R into the beach area, purchasing accessible fire rings, and purchase of new park signs.
This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).
Erosion is a serious water quality issue found throughout the Buffalo-Red River Watersheds rivers and tributaries. Excessive erosion occurs in the beach ridge area where the land naturally has excessive slopes. The beach ridge area consists of sand and gravel deposited by wave action along the shoreline of Lake Agassiz at various times as the lake level rose and fell. The sand and gravel soils, combined with the relatively steep slopes of the area can be susceptible to erosion.
Governor Mark Dayton's landmark buffer initiative was signed into law in 2015. The law establishes new perennial vegetation buffers of up to 50 feet along rivers, streams, and ditches that will help filter out phosphorus, nitrogen, and sediment. The new law provides flexibility and financial support for landowners to install and maintain buffers. The DNR's role in Minnesota's new buffer law is to produce a statewide map of public waters and public ditches that require permanent vegetation buffers. The DNR is scheduled to produce these maps by July 2016.
To provide a space for cultural events and demonstrations at the Northern Minnesota District Fair. By building a performance area and installing a sound system, the fair will have created a dedicated space for history skits, 4-H demonstrations, concerts, and other arts and cultural heritage related programming.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects.
Individual reports are published for each of the awarded grantees.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
This program is designed to attract new audiences to Minnesota State Parks. Primarily young families and young adults that often look beyond state parks for their means of recreation, along with youth looking for an “extreme” or “adventure” experience. Programs will offer participants the opportunity to experience rock climbing, outdoors on real rock. This program targets the state’s climbing parks (Blue Mounds, Interstate and Tettegouche State Parks) by offering one “I Can Climb!” - rock climbing experience - every month from June to August at each of the climbing parks.
The Cannon River Watershed Habitat Complex Phase VIII program will protect approximately 160 acres in fee, and restore and enhance approximately 188 acres of high priority wildlife habitat within the Cannon River Watershed, including wetlands, prairies, Big Woods forest, and river/shallow lake shoreline. Its goal is to reverse habitat loss, prevent degradation of water quality, improve watershed function, and provide public access.
This project will assess the ability of using cover crops as a best management practice to reduce nitrate leaching loss from corn and soybean acres. This contract provides funding for the coordination, outreach and field work to support implementation of the Cannon River Watershed Restoration and Protection Strategy (WRAPS) nitrogen strategy (cover crop application) in Rice Creek. Funding for the actual best management practice (BMP)cost-sharing has been secured via other sources.
This program will protect ~510 acres and restore ~200 acres near Cannon River Headwaters including wetlands, Big Woods forest, and river & shallow lake shoreline to reverse habitat loss, improve watershed function, and provide access