MNHS Press will publish a book showcasing MNHS' extensive collections of bandolier bags made and worn by several North American Indian tribes around the Great Lakes. The book will include a tour of Minnesota's seven Ojibwe reservations, showing bags associated with each area, and profiles of master beadworkers who provide personal insights into the work.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
The primary goal of this project is to analyze of dated sediment cores to reconstruct changes in the lake condition over the last 150 years. This will be done using multiple lines of evidence including biogeochemistry, sediment accumulation, and diatom and algal remains as biological indicators.
The Plymouth Creek Restoration Project will improve water quality in Plymouth Creek and Medicine Lake, the creek's primary receiving water. The project will reduce total phosphorus and suspended sediment in Plymouth Creek and Medicine Lake stemming from streambank erosion. Streambank erosion is a common source of pollution, particularly in developed landscapes where flows in streams are considered flashy and can easily scour unprotected and disturbed streambanks.
This project engages private property owners including non-profits, businesses, and institutions, in the Harrison Neighborhood of Near North Minneapolis to install storm water best management practices. The BMPs will reduce pollution in Bassett Creek including chlorides and bacteria, for which the creek is impaired. The primary focus is on Glenwood Avenue, a focal point in the community and a highly impervious area.
Beltrami County will be updating their water plan in 2017. This plan will be watershed protection oriented and will utilize all available data and maps in order to best protect our water resources. In 2012, Beltrami County completed screening on 19 of our large lakes with heavy land use development. What we found was that none of the lakes had enough chemical data for a trend analysis.
Acquire the 62 acres of the Bertram Chain of Lakes. This property consists of 1,200 acres, including four undeveloped lakes (5.75 miles of lake shore and 1.5 miles of streams), in Wright County. This project will expand a new regional park, which is currently 370 acres in size along the I-94 growth corridor.
To hire qualified professionals to repair the Bethlehem Lutheran Church Hall, listed in the National Register of Historic Places and used as the Sons of Norway Heimbygda Lodge.
To prepare a comprehensive plan for the renovation and preservation of the Bigfork City Hall, eligible for listing in the National Register of Historic Places.
The goal is to facilitate strategic networking, learning, and implementation in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed
To increase the Ojibwe language fluency, proficiency and literacy fo the Bois Forte Indian Community through partnerships with existing language perservation programs to develop a curriculum for pre-K learners, and K-6th grade.
This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.
This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.
Bone Lake and upstream Moody Lake are the headwaters of the Comfort Lake-Forest Lake Watershed District northern flow network, and as such, their water quality sets the stage for downstream waters, particularly Comfort Lake, the Sunrise River, and ultimately Lake St. Croix. This project proposes the implementation of six wetland restorations located along the tributary identified as the single highest source of phosphorus loading to Bone Lake. These wetland restorations are estimated to reduce watershed phosphorus loads to Bone Lake by 50 pounds per year.
Based on the Minnesota Waters Lake and River Association database, Crow Wing County has the highest number of lake associations in Minnesota. Currently, there are over 136 lake association groups in the county, which does not include neighborhood, resort or religious groups. These lakes aer a cornerstone to the state's tourism econmy and there is a great demand for stormwater management incentive program to protect these local water resources.
The Crow Wing Soil and Water Conservation District (SWCD) proposes to partner with citizen groups and nonprofit groups to complete projects that will reduce polluted runoff and keep water on the land in Crow Wing County's (CWC) 125 minor watersheds. To do this, the SWCD will implement a mini grant program and provide competitive grant funds to an anticipated 12 groups. Citizens groups will use their innovation and creativity to apply for project funds through the SWCD.
To hire a qualified consultant to develop architectural drawings for Bridge No. L-4646 (Spring Brook Bridge), listed in the National Register of Historic Places.
To fabricate and install an exhibit based on considerable research and consultation with numerous stakeholders about the U.S.-Dakota War of 1862 for the 150th observance in August 2012.
The purpose of the project is to target the type and location of riparian vegetation restoration needed to shade three miles of unforested buffer on Brown's Creek, a metro area trout stream impaired for thermal and sediment loading. The project will conduct a riparian shading analysis, cost-benefit analysis, and modeling of restoration scenarios based on field measurements of shade in the unforested buffer of Brown's Creek.
This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.
This project entailed a number of small individual improvements to the park made over a 3 year period, including constructing a drinking fountain with an accessible sidewalk at the beach in Buffalo River State Park, repairing a broken water line, rebuilding the main park entrance sign, purchasing sand to stem the flooding of nearby Buffalo R into the beach area, purchasing accessible fire rings, and purchase of new park signs.