This project will provide administrative support to the Clean Water Partnership (CWP) loan program. By initiating the CWP loan program in Sibley County it will provide low interest loans to bring 21 non-complaint or failing existing systems into compliance by replacing them with new single sewage treatment systems.
The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.
The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.
In South Minneapolis, the water quality of Diamond Lake has suffered in recent decades. In fact, the Minnehaha Creek Watershed District's (MCWD) analysis of water testing results designated the water quality grade as F. This is largely a result of water that rolls off roofs, yards, and streets in the 690-acreDiamond Lake watershed and ends up in the lake - bringing pollutants, debris and dirt with it.
The purpose of this project is to expand the County's long standing well sealing efforts by reducing the current inventory of identified well sealing projects.
This project will utilize a systematic approach to identify principal sources, or “hot-spots”, of sediment contributions and work with individual landowners, county drainage officials, and municipalities to coordinate and implement critical Best Management Practices (BMP’s), establish demonstration sites, and provide education and outreach efforts. This project will also establish baseline watershed data with the addition of site specific information, and determine high priority watersheds. Appropriate practices will be identified and mapped utilizing GPS and GIS equipment and software.
This program will protect 300-500 acres of land in the blufflands region of southeastern Minnesota--an area that contains unique and ecologically important prairie, oak savanna and grassland habitat along with outstanding forested bluffs, woodlands, wetlands and cold water trout streams along the Mississippi River.
The purpose of this project is to complete a feasibility study to determine the best sites for projects in the Boot Creek headwaters, in the Le Sueur River watershed, to reduce erosion and pollutant loading. The study will identify critical source areas and provide additional watershed information to assist in prioritizing locations to address local resource management and water quality goals.
This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.
Language and Culture Resource Center to locate and centralize the existing resources relating to the Bois Forte Language and culuture. To also provide Bois Forte community with opportunities to learn the language and culture, not only in an edcuational setting but also in a hands on setting while engaging cultural practices.
This project proposes the implementation of 10 best management practices identified as having the lowest cost-benefit ratio as it relates to phosphorus reduction to downstream Moody and Bone Lakes with an estimated reduction to watershed phosphorus loads to Bone Lake by 90 pounds per year and to Moody Lake by 24 pounds per year. The Bone Lake watershed is at the ?top? of the larger watershed, making it an ideal location to begin work that will have direct improvements downstream.
St. Bonifacius is the only town in Minnesota with a real Nike-Hercules missile in its park, commemorating the nearby missile base that stood from 1959 to 1974. This is a rare display; as only l5-20 missiles still exist from the thousands placed around 20 U.S. cities during the Cold War. The project designed and manufactured two outdoor interpretive panels to tell the story of this missile and missile base within the larger context of the Cold War, a chapter in U.S. History increasingly invisible to younger people.
To install eight digital cameras to provide proper security for the public and collections while increasing customer service efficiency among the limited number of staff and volunteers
This project will work in cooperation with individual volunteers to perform grab samples and visual assessments of four waterbody sites in Brown County. The data collected will be an educational tool to inform the County’s citizens about water quality concerns. Using volunteers to collect the water quality samples and visual assessments will result in the volunteers taking personal pride and stewardship in clean water throughout the County.
Supplemental design of the regional trail segment from Highway 96 to County Road J, including a master plan amendment and alternative trail corridor search
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.
This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).
The Cannon River Watershed is a diverse watershed from the standpoint of topography, land use, and land cover, but a central issue of concern is increased sedimentation and turbidity within the river. One of the best ways to keep sediment from entering the Cannon River is to install vegetative buffers on the smaller tributaries in the upper reaches of the watershed. This project is important as it aims to help identify strategic locations where buffers are needed and to assist landowners to install buffers that will directly help reduce sedimentation within the watershed.
Governor Mark Dayton's landmark buffer initiative was signed into law in 2015. The law establishes new perennial vegetation buffers of up to 50 feet along rivers, streams, and ditches that will help filter out phosphorus, nitrogen, and sediment. The new law provides flexibility and financial support for landowners to install and maintain buffers. The DNR's role in Minnesota's new buffer law is to produce a statewide map of public waters and public ditches that require permanent vegetation buffers. The DNR is scheduled to produce these maps by July 2016.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
to install a solar hot water heating unit on the Baker Campground Shower Building roofin Baker Park Reserve that will include the fixed roof mounted solar array, circulating pumps and thermal pre-heat storage tanks
The I Can Camp! program provides people new to the outdoors with a safe and comfortable way to learn the basics of tent camping, through first-hand experience, providing all equipment and instruction, combined with conservation education and hands-on outdoor recreational skills activities. The DNR offered and conducted four, one-overnight workshops each week for a 10-week period from mid-June through the third week in August, 2010.
The Cannon River Watershed Habitat Complex Phase VIII program will protect approximately 160 acres in fee, and restore and enhance approximately 188 acres of high priority wildlife habitat within the Cannon River Watershed, including wetlands, prairies, Big Woods forest, and river/shallow lake shoreline. Its goal is to reverse habitat loss, prevent degradation of water quality, improve watershed function, and provide public access.
This project will assess the ability of using cover crops as a best management practice to reduce nitrate leaching loss from corn and soybean acres. This contract provides funding for the coordination, outreach and field work to support implementation of the Cannon River Watershed Restoration and Protection Strategy (WRAPS) nitrogen strategy (cover crop application) in Rice Creek. Funding for the actual best management practice (BMP)cost-sharing has been secured via other sources.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area through grants for minor capital improvements equipment and supplies.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area through grants for minor capital improvements equipment and supplies.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area through grants for minor capital improvements equipment and supplies.