With this appropriation, the Minnesota Land Trust plans to protect 150 acres of high quality forest, prairie, or wetland habitat by securing permanent conservation easements and dedicating funds for their perpetual monitoring, management, and enforcement. Lands being considered for permanent protection in this round of funding are located in Anoka, Carver, Goodhue, Hennepin, Isanti, Washington, and Wright counties.
Minnesota Trout Unlimited enhanced in-stream and riparian habitat for trout and other wildlife along more than 11 miles of coldwater streams across the state. We far exceeded our original targets, enhancing habitat on 135 acres rather than 78. We completed 16 separate stream habitat projects. Leveraging other funding and efficiently contracting projects allowed us to add habitat projects and adjust to changing conditions.
Minnesota Trout Unlimited and its partners, chapters, and volunteers enhanced habitat for trout, as well as other fish, game and wildlife, in or along 9 miles of coldwater streams around the state. We met our target for acres of enhanced habitat, by adapting to challenging conditions caused by the pandemic.
This habitat project presents a unique opportunity within the prairie region to convert 5.5 miles of ditched river to 8+ mile long stream channel within a 260 acre fish and wildlife habitat corridor composed of riparian wetlands and grasslands.
This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.
Project protects forest wildlife habitat in central Minnesota through fee title acquisition of key forest tracts. Title of lands acquired is held by Cass County in fee.
Two permanent RIM Easements on 494 acres of high quality, riparian habitat in the Little Nokasippi WMA area of influence have been recorded and will provide lasting wildlife habitat.
This project has protected forest wildlife habitat in central Minnesota through fee title acquisition of key forest tracts. Title of lands acquired is held by Cass County in Fee.
Project has protected forest wildlife habitat in central Minnesota through fee title acquisition of key forest tracts. Title of lands acquired will be held by Cass County in fee.
This project will focus on Watershed Restoration and Protetion Strategy (WRAPS) and Total Maximum Daily Load (TMDL) report development for the Rum River Watershed, which includes Mille Lacs Lake (the second largest lake in Minnesota) and the Rum River of which Mille Lacs Lake is the headwaters. The project will produce a plan that partners and citizens will be able to implement, a framework for citizen engagement, and a set of watershed management activities that will achieve water quality standards for all impairments within the watershed.
The Shell Rock River Watershed District’s Watershed Habitat Restoration Program will restore, enhance, and protect 5393 acres of critical shallow lake, wetland and stream bank habitat benefiting fish, waterfowl and wildlife populations, preserving an outdoor legacy for future generations.
This project will result in the completion of the first phase of the Watershed Restoration and Protection Strategy (WRAPS) for the Snake-Middle River Watershed.
This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.
Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.
Connecting People to the Outdoors - A Parks and Trails Strategic Objective is a program area representing DNR's commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan identifies its purpose to better develop Minnesota's stewards of tomorrow through efforts to increase life-long participation in parks and trails. The purpose of this program is to call attention to the pillar, but also to centralize and streamline reporting on other related programs within the pillar.
This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.
The purpose of the project is to fill critical data gaps - this data will provide a foundation for future development of watershed models, Total Maximum Daily Load (TMDL) reports and the creation of a Watershed Restoration and Protection Strategy (WRAPS) report.
This project is for the Duluth Streams Urban Watershed Restoration and Protection Strategy (WRAPS). The project is a core part of the WRAPS and Total Maximum Daily Load (TMDL) development for the Duluth Metropolitan Area (DMA).
The Leech Lake Band of Ojibwe is working within the Leech Lake Reservation boundaries to address loss and degradation of aquatic habitat for wild rice and waterfowl. Efforts will include regulating water levels on shallow lakes by controlling beaver activity and conducting periodic water level draw-downs, reseeding of approximately 200 acres of wild rice, and implementing adaptive management based on analysis of wild rice productivity.
This project protected in fee approximately 1,960 acres in Cass County and 320 acres in Hubbard County of forest habitat that are at significant risk of conversion to row crop agriculture. The project also restored 92 acres jack pine, an increasingly rare tree species, in the project area.
The main outcome of Phase III of the project will be the final deliverable of a WRAPS report that will prescribe the restoration and protection strategies for the surface water resources within the Leech Lake River Watershed. The WRAPS will provide the analytical and strategic foundation which will be essential in protecting the surface water resources within this high quality watershed. Along with the development of the WRAPS report, this project will support the development and completion of the MPCA Stressor ID and Watershed Assessment reports to be completed for this watershed.
With this appropriation, the Minnesota Land Trust plans to protect 100 acres of high quality forest, prairie, wetland, or shoreline habitat by securing permanent conservation easements and dedicating funds for their perpetual monitoring, management, and enforcement. Lands being considered for permanent protection in this round of funding are located in Chisago, Goodhue, Hennepin, Isanti, and Washington counties.
Minnesota Trout Unlimited enhanced in-stream and riparian habitat for trout and other wildlife along coldwater streams located on public lands and Aquatic Management Area easements across the state. We completed 12 separate projects encompassing 118 acres and 9.3 miles of stream habitat. Leveraging other funding and efficiently contracting projects allowed us to increase the scope of some projects and adjust to changing conditions. We enhanced more acres of habitat and more stream length than originally proposed.
Phase 1 of this project is primarily geared towards project planning and coordination among project partners, developing an initial civic engagement strategic plan, holding a watershed kick-off meeting, and gathering and summarizing available water quality data.
Several important milestones will be completed during this Phase (Phase II) of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report.
Using data supplied by Minnesota Pollution Control Agency (MPCA), this project will model the relationship between sulfate and sulfide in wild rice habitats.
The proposal was to accelerate the protection of 500 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas or Waterfowl Production Areas in the Southern Red River Valley. Over the course of the appropriation, we acquired the 614 acre Prairie Dunes WMA which exceeded our total acre goal of 141 acres. This tract was also restored to provide the highest quality wildlife habitat possible.
This program will protect and restore approximately 400+ acres of forest and wetland wildlife habitat in central Minnesota (Cass County) through fee title acquisitions of industrial forest tracts. Title of lands acquired will be held by Cass County in fee.
Protected 585 acres of forest wildlife habitat in central Minnesota through fee title acquisition of key forest tracts. Title of lands acquired is held by Cass County in Fee.
The Pinelands Sands Aquifer Phase 1 project protected 567 acres of priority forest habitat in the Pinelands Sands Aquifer including high quality dry pine woodlands to prevent habitat loss, protect water quality in the aquifer, and provide access. Lands protected include 352 acres of forests which will be added to the Badoura State Forest and 215 acres which will be part of the newly established Jack Pine Woodlands Scientific and Natural Area.
White Earth has acquired all 2,034 acres and transferred them into fee title status. Initial assessment/inventory of habitat conditions and needs were conducted in summer of 2017. Most illegal dump sites were removed in summer of 2017. The parcel located east of Lower Rice lake adjacent to HWY 92, which contained remnants of ~ 5 acres of food plots, were planted into a pollinator prairie mix. This prairie planting makes the property compliant with the MN Buffer Law. This east parcel is in the planning stages of an early succession forest manage plan.
TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.
Phase 1 of the Roseau River Watershed Restaration and Protection Strategy (WRAPS) project will focus on planning and coordination among project partners, creating a civic engagement strategic plan, holding a watershed kick-off meeting, gathering and summarizing available watershed information and data, and developing a data gap monitoring plan.
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
This project will complete a Total Maximum Daily Load (TMDL) study for the impaired reaches of the Snake River Basin. The project includes development of a Generalized Watershed Loading Function (GWLF) model for nutrient sources and Total Suspended Sediment (TSS), a spreadsheet version of a BATHTUB model of lake response for four lakes, and a bacteria source assessment. Wenck will also provide all stream channel data as a spreadsheet and locational database.