This project will train MPCA field staff in the proper calibration, deployment, maintenance and storage of water quality collection Sondes. Training event will cover general sonde overview, sonde maintenance, calibration procedure, short-term storage, long-term storage and 650MDS overview.
Trained staff will help assure the water chemistry data that is collected is of good quality. After the 1 day training events participants will be able to calibrate sonde water quality monitoring sensors in a lab or field setting, deploy the calibrated sonde to collect water chemistry, store sondes properly during non-field season and perform preventative maintenance or simple troubleshooting actions with the help of tech support. This will be satisfied by two different training events held in 2017.
Looking at Minnesota’s heritage of land stewardship, preservation and restoration, Legacy funding is allowing the Zoo to use our 485 acres to demonstrate these practices and educate the public.
An overall site plan has been developed. We have accelerated our buckthorn removal on site. We are also in the process of developing a demonstration prairie plot which will provide the opportunity for Zoo guests to connect with this rare and important part of Minnesota’s natural history.
To contract with qualified professionals to prepare planning documents that will help preserve the Zumbro Parkway Bridge (Bridge No. 3219), listed in the National Register of Historic Places.
OVERALL PROJECT OUTCOME AND RESULTS This project identified and prioritized areas in the Zumbro River Watershed that were determined critical for restoring and protecting water quality. Studies suggested that small areas of the landscape contribute disproportionately to nonpoint source pollution. So implementation of conservation projects that focus on those areas will maximize water quality benefits and ensure efficient use of resources.
The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.