The Ramsey-Washington Metro Watershed District (District) has determined that large impervious sites (like churches, commercial sites, and schools) are more economical for stormwater management retrofit projects than distributed small projects along roadways. Analysis of the watershed land use indicates that large impervious sites are typically commercial properties (primarily retail), churches, and schools. The District began assessing church sites for retrofit opportunities in 2013 and will continue this effort in 2014.
Minnesota’s Scientific and Natural Areas (SNA) Program is an effort to preserve and perpetuate the state’s ecological diversity and ensure that no single rare feature is lost from any region of the state. This includes landforms, fossil remains, plant and animal communities, rare and endangered species, and other unique biotic or geological features. These sites play an important role in scientific study, public education, and outdoor recreation.
This project will provide lake and stream monitoring assistance to the Minnesota Pollution Control Agency (MPCA), identifying impaired waters within the Lower Minnesota RIver Watershed (Watershed ID: 07020012) according to the Intensive Watershed Monitoring (IWM) Approach.
Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health with the assistance of the Board of Water and Soil Resources protects both public health and groundwater by assuring the proper sealing of unused wells.” Clean Water funds are being provided to home owners as a 50% cost-share assistance for sealing unused private drinking water wells.
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
The goal of this project is to use the Watershed Data Integration Program (WDIP) Project to apply previous experience with business analysis to the MPCA’s efforts. Develop and document implications for the strategic approach of the business to Watershed projects, their communication and implementation plans to shift to the new strategy, and the daily processes of the business that will be required to change.
The goal of this project is to provide drilling services for the Sentinel Lakes Groundwater/Surface Water Interaction Network. The three new wells will be used for monitoring the interaction between groundwater and surface water in Lakes Shaokatan and Bear Head. Groundwater/lake water interactions are not well understood, and in order to produce accurate and useful Total Maximum Daily Load watershed investigations and impairment remediations, the MPCA must understand how groundwater affects lake water quality.
The Children’s Discovery Museum (CDM) continued aggressive School Service Program (SSP) enrollment strategies to reach the seven new counties of Becker, Lake of the Woods, Mahnomen, Mille Lacs, Morrison, Todd, and Wadena. A new Wizard of Oz exhibit was mounted in time for the 75th Anniversary Celebration, June 10-14, 2014.
Ducks Unlimited purchased a total of 567 acres in 11 separate parcels in the Prairie Section for the state of Minnesota, including 135 acres of wetlands and 432 acres of uplands. All 11 parcels have been restored and transferred to the Minnesota Department of Natural Resources for inclusion in state Wildlife Management Areas, are open to public access, and managed for wildlife habitat and outdoor recreation. This prairie conservation work contributes to the goals of the Minnesota Prairie Conservation Plan, the Governor's Pheasant Action Plan, Minnesota's Long-range Duck Recovery
Ducks Unlimited's Phase 5 land program will acquire and restore 600 acres of prairie land and wetlands for inclusion in state Wildlife Management Areas for Minnesota DNR, with focus on restorable prairie lands and wetlands, and land buffering shallow lakes.
To contract with qualified professionals to prepare planning documents that will help preserve the Shaw Memorial Library, listed in the National Register of Historic Places, and used by Carlton County Historical Society.
The Shell Rock River Watershed District's Phase 5 Habitat Restoration Program will restore, enhance, and protect 1040 acres of essential shallow lake, wetland and stream bank habitat benefiting fish, waterfowl and wildlife populations, preserving an outdoor legacy for future generations.
Forest Lake is one of the top recreational lakes in the metro area and protecting its water quality is a top priority for the Comfort Lake Forest Lake Watershed District. While not currently on the impaired waters list, the water quality of Forest Lake is very near the water quality standard. Shields Lake has been identified as the single largest pollutant contributor to Forest Lake. This project proposes to impound water from a tributary to Shields Lake for golf course irrigation reuse, reducing watershed phosphorus loads to Shields Lake.
The proposed project area covers roughly one hundred square miles within Sibley County, but also includes a small portion of Nicollet County where Judicial Ditch 1A runs into the south branch of the Rush River. One lake and seven streams are part of the proposed project monitoring sites. Of the seven stream locations, two are part of the High Island Creek Watershed, while the remaining five are part of the Rush River Watershed. The lone lake, Lake Washington, falls within the Bevens Creek Watershed.
This project replaced the waterlines at the Sibley State Park that service the toilet/shower buildings and the drinking water supply in the Oak Ridge camground.
The Wright Soil and Water Conservation District (SWCD) will expand its partnership with its USDA partners; this will be the first time that SWCD staff will conduct compliance spot checks for USDA Highly Erodible Land plans. This activity will add a level of certainty that these plans are in compliance.
The Roseau River Watershed District in partnership with the Roseau County SWCD will complete a study to target and prioritize sites contributing impairments within legal drainage systems. Project partners will utilize data developed by the International Water Institute (IWI) Water Quality Decision Support Application that establishes multivariate scoring of each site based on all relevant features contributing to surface water degradation.
The project is part of the Six Mile-Halsted Bay Subwatershed Plan, a planning partnership currently underway which aims to protect and improve natural resources within this priority subwatershed by working closely with partnering agencies to integrate capital investments and maximize public return on investment. This project will enhance two existing stormwater ponds to enhance treatment of phosphorus as well as incorporate treatment of the Church Lake outlet, a lake which routinely fails to meet state water quality standards and contributes to the water quality impairment of East Auburn.