MNHS awarded seven research fellowships for the third year of the Legacy Research Fellowships program in FY16. Four scholars received $5,000 awards and three received $1,000 awards. The fellows used resources from the Gale Family Library to explore a wide range of Minnesota history topics including:
* A review of Minnesota's development and
Indian lands
* Visual arts in Minnesota
* Forts in Minnesota after the U.S.-Dakota War of 1862
* Minnesota reflections on World War I
The fourth class of scholars was selected in November 2016 and begin work in January 2017.
To reverse inappropriate alterations by restoring the historic voice and register of the 1875 pipe organ in First Baptist Church, listed in the National Register of Historic Places
The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.
State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Parks and Trails Fund (M.S. 85.53). The Minnesota Department of Natural Resources (DNR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Clean Water Fund (M.S. 114.D.50 Subd. 6). The Board of Water and Soil Resources (BWSR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
This program annually evaluates a sample of up to fifteen Outdoor Heritage Fund restoration and enhancement projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice.
To construct the Arts and Cultural Celebration Center at the Rice County fairgrounds. This heated, year round and handicap accessible building with ADA bathrooms and presentation stage will be home to arts presentations by regional individuals and performances by county arts and theater organizations.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
To restore Rock County Fair's Floral Hall. Built in 1911 and listed on the National Register of Historic Places, Rock County Fair will restore its interior. Funding will not only preserve this historic building, but also create an enhanced space to showcase regional artwork.
To provide an outdoor performance and demonstration space in the highest traffic area of the fairgrounds, which is located between the 4-H Exhibit, Open Class Exhibit, and the Rock County Historical Society Exhibits buildings. The fair plans to hold Dutch Oven cooking demonstrations, Buffalo Days celebrations, and dance performances in this area.
The Rock River Watershed encompasses runoff from the four counties of Rock, Pipestone, Murray and Nobles. The Rock River Watershed, along with the adjacent Elm Creek are listed as impaired by turbidity and fecal coliform. With limited funds available for restoration projects, targeting tools to pinpoint locations where projects stand to have the highest effectiveness are increasingly important.
This project is a partnership with farmers, livestock, commodity and conservation organizations and agencies to install, demonstrate and expand water drainage conservation within the Rock River Watershed. Up to four sites will be chosen based upon local selection criteria, installed and demonstrated to the public in 2013 and 2014.
The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.
This is the second phase of the Roseau River Watershed Restoration and Protection Strategy (WRAPS) project, which includes: developing the Total Maximum Daily Load (TMDL) study, pollutant load allocations, watershed restoration and protection strategies, and conducting civic engagement.
255 acres were acquired in 2021 using OHF funding. These are acres allowed the dike to be aligned with the beach ridge of the lake.
Construction of Phase 1 (see map) was initiated in September 2023. The northwest embankment was built and a weir steering the main flow of the Roseau River into a natural oxbow was installed. A water control structure (on Pine Creek) and finishing work on the dike will be completed this year.
The purpose of the project is to collect data to represent the ambient condition of the lakes and streams of the Rum River Watershed within Mille Lacs, Isanti and Sherburne Counties that is needed to determine if thresholds set to protect designeated uses, such as aquatic recreation and aquatic life, are being met .
This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality in the Rum River Watershed. Local Partners will lead various portions of this project and a hired onsultant will be subcontracted to write selected TMDL protection plans.