This phase of the project will complete a TMDL for the impaired reaches of the Snake River Basin. The project includes development of a Unit Area Load model for nutrient sources, a spreadsheet version of a BATHTUB lake response for four lakes, and a bacteria source assessment. Contractor will also provide all stream channel data as a spreadsheet database and in GIS.
The Minnesota State Legislature asked the Minnesota Humanities Center to award arts and cultural heritage grants to the Somali community through the competitive grant process. Legacy funds are appropriated to the Humanities Center to support such work. A small portion of each appropriation was reserved by the Humanities Center for direct expenses related to administering the grant. Should any portion of this reserve be unused, the difference will be awarded to the respective organizations.
To upgrade the capacity of Washington County Fair to host a variety of performing artists at the fair by upgrading the sound system. To purchase mixing console, power amplifier, microphones, dual CD player adaptable to inputs from USB, memory sticks, MP3, therefore allowing the fair to invite performers using digital sound devices.
Conduct well survey to determine property owners that may need to seal wells, survey compilation, update PCSI well status and mailing and develop spill response plan.
Improve security by purchasing and installing doors on city's well house, create and publish article on protecting source of water, potential contaminants, and wellhead program.
Provide information meeting about incentive to encourage agriculture producers to reduce nitrate. Establish incentive for agriculture producers to use best management practices to reduce nitrate in drinking water system.
Drill well to clear pump for borehole geophysical survey on well 2. Purchase spill response materials to be better prepared in case of spill or train derailment.
Clean well 228834 to decrease draw down and bring capacity of well back to normal range. Pull well pump and televise well, Jet well casing and screen, jet and chlorinate well, final televising and set up well pump
Remove concrete, fill annular space with grout, fabricate well head, paint interior piping, reinstall pump, motor and drop pipe to stop potential source of contamination from entering city wells.
Identify and update Potential Contaminant Source Inventory to eliminate private wells with potential pathway for contamination. Purchase, replace 2 data loggers, 1 indicator for data collection equipment
Construct a well. Extend new overhead drop from existing power pole to pump house for 240 volt service. Extend new circuit from loadcenter to location of new pressure switch and well control box.