The University of Minnesota will develop effective interview questions for community watershed assessments in the Rainy River basin and provide assistance in understanding the data collected through community interviews.
The Rainy River Basin WPLMN Sampling Program will focus on watershed load monitoring in the Big Fork River, Little Fork River, Rainy River-Rainy Lake, and Vermilion River watersheds. Four total staff will work on various portions of this agreement. The main objective is for one lead sampler and one backup sampler to collect water chemistry and field parameters for eight (8) sites, annually at various flows, especially peak flows, and utilize that data to determine the amount of pollutant load into each stream system.
This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.
The purpose of the grant is to increase and enhance the understanding of the American Indian Ojibwe language and culture to ensure positive reinformcement of the self image and sense of identity four our American Indian Ojibwe people: To engage American Indian Ojibwe language and culture in our communities.
Ramsey County, the most densely populated county in Minnesota, generates high levels of contaminated runoff from its impervious surfaces, which can have damaging effects on both surface water and groundwater. Concerns arise when these contaminants drain into abandoned and unused wells, threatening the quality of groundwater, especially in drinking water supply areas, wellhead protection areas, or groundwater recharge zones.
The Rapid River Watershed Restoration and Protection Strategy (WRAPS) project will result in the development of the restoration and protection strategies for the watershed and engage the local stakeholders in the practices of watershed management. This project will also develop Total Maximum Daily Loads (TMDLs) for impaired waters.
The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.
Partial funding to reconstruct parking lots, driveways, parking lot lighting, boat ramp improvements and associated storm water improvements at the Hyland-Bush-Anderson Lakes Regional Park Reserve.
Renovate Rice Creek Maintenance Shop and campground support facility to improve maintenance and operations efficiencies and improve visitor experience in park.
Reconstruct the 3,800 SF Cherokee Regional Park Play Area to provide active play opportunities for children between the ages of 2-12. Cherokee Regional Park receives approximately 340,000 visits per year, approximately 10% of which are of Hispanic background
In FY17, MNHS will launch a new records search to make it easier for library patrons to access birth, death, veterans grave and state census records. The new search tool launched in beta in December 2016, and user feedback is being collected. Site enhancements will be made in the second half of the fiscal year.
Continue Recreation and Volunteer Specialist position initiated in 2014 to develop and implement recreation and volunteer programs. Engage 3,300 park visitors through 100 programs provided in the County.
Design, engineer, and construct new recreational amenities at Sheridan Park, including play areas, picnic areas, trails, shoreline improvements, natural habitat enhancements, and visitor services.
Impaired waters in the Red Lake River 1W1P are categorized into management classes to target impaired waters that are closest to meeting water quality standards and to protect unimpaired waters close to becoming impaired. Management areas targeted in 2018 and 2019 include the Little Black River, Black River, County Ditch 96, the Red Lake River between Thief River and Crookston, Burnham Creek, and Grand Marais Creek.