To document in five oral history interviews the historic use and interrelationship of the buildings on the campus of the Minnesota State School for Dependent and Neglected Children, listed in the National Register of Historic Places.
Grant Activities: The short term goals are to use language and traditional teachings as literacy tools through the development of an Anishinaabemowin Family Literacy program taking place throughout the 2012-2013 school years. The Anishinaabemowin Revitalization team will consist of school staff, elders, tribal government employees, parents, and community members. A written plan for revitalization will be concluded by June 2013. An increased capacity for immersion programming will result through the development of local speakers, materials, and an effective school based program.
Otter Cove Children's Museum will be a state-of-the-art educational and cultural center in Fergus Falls, Minnesota, providing a much-needed accessible, indoor play space for the children of Otter Tail County and beyond. Otter Cove was started and driven by a group of moms but the actual place, Otter Cove, is for children and the "critters" who live there; the otter in the Otter Romp Playground, the fox at the cafe, the beaver at the dentist office, the raccoon at the grocery store, the swan on the stage, the mice at the bookstore, and the skunk at the veterinarian.
Thanks to the support of the Minnesota Humanities Center in 2019, Otter Cove Children's Museum was able to complete the design, building, and installation of a variety of exhibits and interactive art features prior to our grand opening. Despite a delayed opening and months of limited operations due to the pandemic, Otter Cove's first year has been nothing short of incredible, attracting 17,299 children and families from 289 unique zip codes (179 of them in MN), 27 states, and 4 countries!
The Otter Tail County Soil and Water Conservation Districts will work to complete individual lake assessments on thirty-eight lakes in Otter Tail County that have enough data for an assessment. These assessments will be incorporated into the County Water Plan and can be used by individual lake associations in completing a lake management plan. These assessments will greatly assist the County and the Soil and Water Conservation Districts prioritize future efforts for water quality improvements and protection projects.
The Otter Tail County Community Conservation Sub-grant Program enables community groups to go beyond planning and take action to protect their water resources. This grant program provides community groups with the means to make positive improvements now, and a venue to grow community and identify further water quality opportunities. Engaging community members in the identification of water protection opportunities helps build connections and foster a stewardship ethic.
This grant program provides community groups with the ability to make positive improvements, a venue to grow community and identify water quality opportunities. Engaging community members in the identification of water protection opportunities helps build connections and foster a stewardship ethic. Selecting projects requires community groups to collaboratively develop priorities among the range of water quality impacts. Implementing projects provides a unique active social enviroment that helps build connections and energy to motivate and grow the community into the next project.
Thanks to the support of the Minnesota Humanities Center in 2019, Otter Cove Children's Museum was able to complete the design, building, and installation of a variety of exhibits and interactive art features prior to our grand opening. Despite a delayed opening and months of limited operations due to the pandemic, Otter Cove's first year has been nothing short of incredible, attracting 17,299 children and families from 289 unique zip codes (179 of them in MN), 27 states, and 4 countries! Our guests have been so impressed that we have such a a high-quality facility in a rural region.
The goals of project are to: 1) engage stakeholders and the public in watershed management activities; 2) conduct microbial source tracking to determine the source(s) of E.
The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.
This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.
Construct a new boat ramp on Otter Lake, redevelop parking area for boat trailers and adjacent off-leash dog area users, provide improved stormwater management, install new restroom facilities and provide site amenities and landscaping.
This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report.
The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.
The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.
The Otter Tail River is located in west-central Minnesota. Its Lower Otter Tail River (LOTR) reach is impaired for sediment. The LOTR begins at the dam of Orwell Reservoir near Fergus Falls and ends 48 river miles downstream at the confluence with the Bois de Sioux River at Breckenridge. No point sources contribute directly to the LOTR. Consequently, the turbidity impairment must be addressed through non-point measures. Current stream instability and bank erosion is largely a result of an 18-mile channel straightening completed by the Army Corps of Engineers in the 1950s.
This restoration and protection project will reduce the loading of sediment to the Otter Tail River by 440 tons/year. This is about 6.5% of the total reduction needed to meet the goals of the Lower Otter Tail TMDL Implementation Plan. The Otter Tail River downstream of Orwell Dam is impaired due to sediment, with stream bank erosion being the primary contributor. This stream bank restoration will include the installation of woody toe debris benches and the installation of a vegetated slope along a 1,400 foot reach of the river.
Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. Implementation Funds are budgeted for the installation of best management practices and to support staff capacity necessary to implement the plan.
This project includes new exhibit components and enhancements; facilitating diverse workshops and performances for children and families, and four mini camps for children ages 6-12 during school/summer breaks.
This project will be the first of its kind Civic Engagement Cohort that focusses its efforts in an individual watershed. The Otter Tail River Watershed is scheduled to start a Watershed Restoration and Protection Strategy (WRAPS) in 2016 and as a component of that project, the cohort will provide the civic engagement requirement. The cohort will be comprised of 25-30 individuals located throughout the watershed who represent a broad spectrum of resource managers and citizens who are familiar with water quality and watershed management.
The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.
The Otter Tail River is impaired for turbidity. This project involves the installation of 45 side-inlet structures into Wilkin County Ditch 3-2 and 7-1 and 22 acres of buffer strips along the entire systems. Eleven miles of continuous berm will also be constructed along the ditch. When installed these water quality practices will become a permanent part of the ditch system and will be maintained by the ditch authority. These ditches outlet to the Otter Tail River just upstream from Breckenridge, MN. Together these water quality BMPs will reduce sediment loading by 1,375 tons/year.