DNR data show that fisher in Minnesota have declined 50% since 2000. Den sites may be limiting reproduction. We will test if den boxes can help the fisher population increase.
To hire a qualified consultant to conduct a conservation needs assessment and treatment plan for a 1925 George Kilgen and Sons hybrid classical pipe organ.
Construction of a 6.6 mile bituminous trail along CSAH 35 connecting the cities of Dent and Vergas to the Heart of the Lakes Regional Trail and Maplewood State Park
The objective of the grant is to develop a strategy and responsive plan for wide-spread public engagement with the Ojibwe People’s Dictionary during the first year it will be available on-line. Speakers of the Ojibwe language, beyond the group of Ojibwe elders in Minnesota with whom the University now collaborates with, may be encouraged to contact the University once the dictionary is online and wish to participate in the next stage of the dictionary’s development.
This project will develop a watershed wide Total Maximum Daily Load (TMDL) study and River Eutrophication Standard (RES) TMDL report for water quality impairments in the Des Moines River basin, which includes the Des Moines River Headwaters, Lower Des Moines River, and East Fork Des Moines River watersheds.
The goal of this project is to construct, calibrate, and validate a Hydrological Simulation Program FORTRAN (HSPF) model for Minnesota portions of the Des Moines River watershed.
At Central Mississippi Regional Park, implement the master plan including design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Mississippi River Regional Trail, design and reconstruct bituminous trail segment from Anoka County Riverfront Regional Park to 37th Avenue. (6 of 6 projects financed with grant.)
Rice Creek West Regional Trail, design and reconstruct entrance drive parking lot and sidewalks in Manomin Park trail head. (5 of 6 projects financed with grant.)'
Mississippi West Regional Park.?Design and construct new boat launch, improve existing roadway, fishing pier/ observation deck, utilities, landscape restoration, signs and site furnishings, plus associated permit fees and contingencies.MC Action on 06/27/2012 reduced the grant amount from $400,000 to $382,000.
Bruce Vento Regional Trail. Design development plans for trail development and connection, storm water management improvements and site amenities on trail from Buerkle Road to Hwy 96.
Bald Eagle Otter Lakes Regional Park. Design and construct an early learning center at Tamarack Nature Center, and pedestrian connections, landscape restoration, signage, and other site amenities.
Above the Falls Regional Park, design and construct trail loops, river access areas, landscapes, storm water management. Includes site furniture, landscaping, utilities, survey and site investigations, design, engineering, and project management.
Design and construction of trail loops, river access areas, landscape and storm water management improvements at ATF RP. Project includes site furniture, landscaping, site utilities, survey and site investigations, design and engineering
Mississippi River Regional Trail. MnDOT identified and supported Mississippi River Regional Trail connection from Harriet Island Regional Park in St. Paul to the Mississippi River Trail in Dakota County. Design, engineering and construction for a combine
Mississippi River Regional Trail. MnDOT identified and supported Mississippi River Regional Trail connection from Harriet Island Regional Park in St. Paul to the Mississippi River Trail in Dakota County. Design, engineering and construction for a combine
Initial project was Design and Construction of a trail bridge over County State-Aid Highway 19 for the Lake Minnetonka LRT Regional Trail. 2015 Legislature amended project to "save trail crossing". PAT Legacy (F14-15) matched with $1,040,000 in federal funds.