1)Citizen drinking water education. 2)Stormwater BMP's. 3)Provide SWP info. 4) Provide water conservation info. 5)Integrating goals into other plans. 6) Water quality monitoring.
Installation of a natural gas back-up generator, automatic transfer switch and disconnect, generator pad and all wiring, automatic transfer switch to the service panel and well pump and other supporting equipment as needed.
Hire consulting firm to provide engineering and hydrogeotech analysis for well site selection alternatives for test wells and future production well(s).
This project will collect water quality data in the Lake Superior South watershed as part of the Watershed Restoration and Protection Strategy (WRAPS) development for Minnesota waters. South St. Louis Soil and Water Conservation District (SWCD) staff will conduct all monitoring in accordance with Intensive Water Monitoring (IWM) Standard Operating Procedures (SOP). South St. Louis SWCD staff have extensive experience in stream sampling techniques, including work performed under a St.
To provide new arts programming at the South St Louis County Fair. Programming will include a Bluegrass band, barbershop quartets, and children’s music.
This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.
The project will realign portions of the creek in its historical channel, restoring its meander pattern and in-stream habitat by using bioengineering techniques. The techniques included root wads and biologs for streambank protection, vegetated reinforced soil stabilization for streambank stabilization, boulder rock vanes for grade control and in-stream flow control, and constructed riffles and pools for in-stream habitat.