Purchase and install generator.
Seal 5-10 wells.
Spill response planning. PCSI Update. Property owner mailing.
Hire engineer/consultant for a new well.
Hire a well driller to complete exploratory drilling and water quality sampling (Phase 2)
Purchase and installation of a generator (Phase 2)
Purchase and connect a back-up generator (Phase 1)
Seal old municipal well (Phase 2)
Purchase a natural gas powered generator to replace an existing gasoline generator. (Phase 2)
Purchase and install a generator (Phase 2)
Seal unused well.
Purchase a generator (Phase 2)
Install a secondary well (Phase 2)
Purchase and install generator (Phase 2)
Provide the first half annual rent payment (2022-2023) to landowner to allow city to implement nitrogen BMP's on field immediately upgradient of high nitrate public supply.
Rework water Dept. door locks. Water plant card readers. Door alarm replacement.
Construct a new well
Seal unused/privately owned wells.
Televise and Rehab Well #6
Installation of (Reduced Pressure Zone) RPZ valve to protect water source
Update PCSI, locate feedlots and unpermitted dump site.
Seal 2 wells located within the DWSMA. Provide financial incentives for the implementation of nutrient management BMP's.
Purchase spill response kit. Educational packet to well owners in DWSMA.
Purchase, install, and test security system equipment. Drill test well for possible new well location.
Purchase and install generator (Phase 3)
Purchase and install generator (Phase 1)
Seal South Well (#465740) and seal the dead end, stagnant line caused by removal of Well #465740 from the distribution system.
Seal a former Railroad Well.
Purchase and installation of transfer switch. Generator site prep and pad construction. Natural gas line installation (Phase 1)
Removal of cesspool and installation of septic holding tank(s) and sewer line.
Purchase and installation of an automatic transfer switch and wiring. Concrete slab, fill and dirt work. Gas line and connection equipment.
Remove 2 underground fuel oil tanks.
Repair concrete lift station and line the inside with polyethylene. (Phase 3)
Seal well
Installation of treatment designed to inactivate/remove 4 log virus, 3 log giardia, and 2 log cryptosprodium.
Drill new well and seal contaminated well.
Seal a well and connect the existing distribution lines to another existing well. (Connection to existing well not approved)
Hire engineer to conduct Hydro-geotech study and potential well site.