Automatic transfer switch, electrical work, LP connection, and other supporting equipment necessary for a future generator connection at Well #1. (Phase 2)
Next phase of analysis for test drilling and installation of monitor wells for the installation of production well #4 and possible replacement of well #1.
Hire consulting firm to provide professional engineering and hydro-geotechnical analysis for municipal well site selection, alternatives for test wells, and a future production well to serve as a back-up emergency water supply (Phase 2).
1)Provide the second half of annual rent payment (2023) to landowner to allow city to implement nitrogen BMP's. 2)Seed and seeding of oats. 3) Combining oats and Kernza
Storm Drain Art Implementation. Storm Drain Art Supplies and Materials. Art/Adopt-a-Drain public education. Adopt-a-Drain Membership. Adopt-a-Drain educational materials/supplies.
Wellhead Protection newspaper article. Seal 2 private wells. Seal old municipal wells/test wells. Mail BMP materials to owners of potential contaminant.