Install a standby generator at water treatment facility.
Contract a hydrogeologic field inventory of groundwater level collection equipment.
Construct new well. Seal old well #262293.
Construct concrete slab for generator. Hardwire generator with automatic transfer switch.
Seal well #1.
Seal unused well.
Update mailing addresses. Develop a memorandum. Prepare a written evaluation.
Seal 2 unused wells.
Replace septic system with new conforming lift station, septic tank and drainfield.
Purchase a propane generator, connect wiring. Construct housing unit (Not Approved)
Develop website and mailers for proper well management, household hazardous waste, and review DWSMA land use.
Phase 3 to connect well #1 and well #2 together.
Inspect and evaluate existing well to determine cause of total coliform bacteria.
Spill response training. Training materials. Sorbant materials for future spills.
Well drilling.
Perform tests to determine feasibility of new well location.
Mailer promoting proper sealing unused wells. Seal approx. 20 wells.
Installation of 4 arsenic treatment systems.
Update PCSI.
Drill new well
Purchase a generator.
Purchase and install generator.
Construct Observation well. Purchase and install well transducer. Consultant survey.
Provide second half of annual rent payment (2021-2022) to landowner to allow city to implement nitrogen BMP's. Combining and mowing of Kernza.
Drill new 6" well.
Construct new well. Seal well #1.
Drill a new well.
Seal 3 test wells.
Phase 2 to seal well #1.
Installation of pipes and concrete fill. Purchase and installation of 3 yard hydrants. (Hydrants not approved)
Continuation of the engineering and hydrogeotech analysis for site selection alternatives for test wells and future production well.
Design and development of Wilkinson Lake water quality improvement project.
Hire licensed well driller to seal old municipal well.
Monitoring well installation and GW data collection.
Seal Old Well 1 (#241530).
Seal unused wells in the DWSMA.
Connect a residential home to city sewer.
Investigate potential sites for a future water supply well. Test drill and test pump site to confirm site suitability. Sample water quality.
Install a generator and necessary wiring with switch box.