Develop content and maps for GIS story map. WHPP evaluation. Distribute WM mailer.
Replace filtration system and cartridge.
Seal a 6" -140' deep well.
Replace pump & communication controls for wells and tower.
PHASE TWO of sealing 8 inch City of Pine City municipal well.
Seal irrigation well. Connect 2 remaining wells.
Construct a new well.
Seal well 3A
Purchase and installation of switch gear and wiring.
Purchase and install a VFD on well #9.
Investigate well #2. Conduct feasibility study.
Install gates with barb wire on gates and fence.
Pull pump and seal well. Furnish and install level transmitters.
Provide second half annual rent payment to landowner. Field prep and mowing. Combining, drilling and seeding.
Seal (1) 264-foot deep lake augmentation well formerly used at Bush Lake.
Replace a shallow driven well (Sandpoint) well with a drilled well.
Wiring for generator for Wells #6 (689606) and #7 (716432)
Video inspections to wells #1, #3, and #5.
Seal private well.
Construct a new well to replace well #2.
Seal old abandon well #00268011. Drill new well.
Seal well
Supplement CRP payments to 2 land owners.
Purchase and installation of generator
Construct 2" well and install a data logger.
Seal multiple unused wells
Excavate for well
Drill test well
SEMWAL Water Analysis
Seal old city well #89197
Seal abandoned irrigation well. Prepare a wellhead newsletter.
Purchase a generator. Develop an article to inform residents.
Drill out debris and prep for sealing of an old railroad well. Seal well if funds remain.
Incentive payment to landowner.
Phase 1 to set-up for a generator.
Sealing of private and old municipal wells.
Seal inactive city well #3. (Phase 1)
Seal unused well #178992.
Purchase and connect generator.
Consolidation of a NonComm PWS system. Well Sealing.