The Rice Creek Watershed District is proposing to improve water quality and habitat in Locke Lake and Lower Rice Creek by stabilizing stream banks and bluffs on Lower Rice Creek, reducing in-stream erosion and sediment delivery to Locke Lake, and improving in-stream habitat complexity for fish and invertebrates. Eleven bank stabilization practices would be installed over a continuous 5,400-foot reach in Lower Rice Creek. The anticipated outcome of this project is the prevention of 2,874 tons per year of sediment, which is 58% of the sediment reduction goals for Lower Rice Creek.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA constructs watershed models. These models support the development of TMDL studies for multiple listings within a watershed. In 2017 the Lake of the Woods (LOW) watershed HSPF model was extended through 2014.
The purpose of this work is to develop a Watershed Restoration and Protection Strategy (WRAPS) and associated Total Maximum Daily Load (TMDL) documents for the Lower Rainy River and Rainy River Rainy Lake Watersheds.
This Sauk River Watershed District project will conduct the Whitney Park river clean-up, adopt a river program and other community events as part of their healthy living programs; will collaborate with the city of St. Cloud to install a rain garden demonstration site at Whitney Park; use local radio and public television stations to promote the District’s “neighborhood rain garden initiative” and other incentive programs.
This project will include analysis of existing and newly collected water quality data to verify the impairments on the currently listed reaches and to determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a focus throughout the Watershed Approach Project. The project provides an opportunity to assess and leverage the capacity for the local community to engage in the process of watershed management and to adopt protection and restoration practices.
This project will revise a recently completed draft Total Maximum Daily Load (TMDL) report for the Lower Minnesota River Watershed Project. The revision is to correct wasteload allocations for regulated stormwater entities.
This project is designed to reduce sediment in the Wild River River based on a state approved plan (TMDL). The estimated water quality benefits completed by this project are 12,980 (120 truckloads) tons of soil saved per year, which will assist in reducing turbidity impairments downstream on the LWRR.
This project will reduce sediment and nutrient loading to the main stem and local tributaries of the Lower Minnesota River (LMR) by providing cost share for practices that treat ravine headcut and channel erosion, streambank/shoreline erosion, ephemeral gully erosion, and direct-discharging open inlet drainage systems. Targeted Best Management Practices (BMPs) will include but not be limited to grade control structures, grassed/lined waterways, water & sediment control basins, shoreline/streambank stabilization and alternative tile inlets.
The Lower Mississippi River Feedlot Management in MN project will be leveraging State funding from BWSR to provide match for a United States Department of Agriculture Natural Resources Conservation Service (USDA-NRCS) Regional Conservations Partners Program (RCPP). BWSR will provide technical and financial assistance to plan and design projects to mitigate feedlot runoff from smaller (less than 300 animal units or AUs*), open lot feedlots in southeastern Minnesota.
This project builds on the momentum of previous Clean Water Fund grants in making significant and quantifiable sediment, nutrient and runoff volume reductions to address the turbidity, dissolved oxygen and other impairments of the Lower Minnesota River (LMR). These water quality improvements will be achieved by constructing on-the-ground conservation best management practices (BMPs) in the targeted watersheds -including specifically Sand and Roberts Creek - and near channel sources.
The goal of this project is to develop draft Total Maximum Daily Load (TMDL) computations for six impaired lakes and two impaired streams, and to provide TMDL development documentation for selected draft TMDL report sections.
This project will plan, implement, and report on a community engagement strategy for identifying community/landowner opportunities, obstacles, and opinions on land management and water quality that will result in the identification of Watershed Restoration and Protection Strategies (WRAPS) input for the Sibley, Nicollet, Renville, McLeod, Rice, and LeSueur County areas of the Lower Minnesota River watershed.
The project will plan, implement, and report on a community engagement strategy for identifying community/landowner opportunities, obstacles, and opinions on land management and water quality that will result in the identification of Watershed Restoration and Protection Strategies (WRAPS) input for the Sibley, Nicollet, Renville, McLeod, Rice, and Le Sueur County areas of the Lower Minnesota River watershed.
This project will address Minnesota Pollution Control Agency (MPCA), United States Environment Protection Agency (EPA), and public comments on draft Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports, preliminary draft TMDL studies, and public noticed TMDL studies and WRAPS reports for the Lower Red River Watershed and the Lake of the Woods Watershed and produce final versions of the TMDL studies and WRAPS reports for each watershed.
This project addresses six lakes that have aquatic recreation impairments and one creek reach that has a bacteria impairment for E. coli. The project will evaluate the water quality impairments, complete pollutant source assessments, and establish loading capacities and allocations for the impairments.
This project will develop draft Total Maximum Daily Load (TMDL) studies addressing seven impaired lakes in the Lower Minnesota River Watershed (Fish, Pike, O’Dowd, Thole, Schneider, Titlow and Cleary Lakes). TMDLs will describe the impairment in each lake and water quality targets, and will include a phosphorus source assessment, a lake response model and supporting report components that document assumptions and methodologies, and a TMDL equation with completed load allocations, wasteload allocations, and margin of safety for each impairment.
The LqP-YB Watershed Plan FY 2025, will be used to implement projects in the Watershed to help enhance ground water, surface water, land
stewardship, & habitat. The plan is broken into high, medium, & low priority regions and the local partners will work with
landowners to implement projects to help meet the goals of the plan. Funding will be geared towards projects located in the high
This project will complete an inventory of drainage systems to prioritize locations for structural erosion control practices and buffer strips that will reduce sediment loading into Marsh Creek and Lower Wild Rice River downstream, which are both impaired by turbidity. An inspection plan and database will also be developed to enhance the county drainage ditch inspection program.
This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.
The Kohlman Lake nutrient reduction study identified a major source of phosphorus loading from the impervious areas like roads, roofs and parking lots within the watershed.. Within this area, one major land use feature stands out - Maplewood Mall. Retrofitting the Mall parking areas to infiltrate at least one inch of stormwater runoff will result in a large reduction in phosphorus to Kohlman Creek and the lake.
The Kohlman Lake TMDL calls for the reduction of nutrients from watershed and in-lake loading. A major source of phosphorus loading is from the impervious areas in the District (roads, interstates, roofs, and parking lots). In the analysis of the Kohlman Lake watershed, one major land use feature stands out - Maplewood Mall. The District identified that retrofitting the Mall parking areas to infiltrate at least one inch of runoff would result in a large reduction in phosphorus to Kohlman Creek and the lake.
The Marine on St. Croix Innovative Stormwater Management Implementation is a partnership, formalized through an MOU, between Marine on St. Croix (MOSC) and the Carnelian-Marine-St. Croix Watershed District (CMSCWD) to improve stormwater management in the most densely developed areas of the City on a neighborhood zone approach rather than site-by-site (parcel) approach for greater and more impactful results in accomplishing District and City stormwater management goals.
Phase 2 of the Marsh River Watershed Restoration and Protection Strategy (WRAPS) project includes: continued civic engagement; production of the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; and production of the WRAPS report, which identifies implementation strategies that will maintain or improve water quality in many lakes and streams throughout the watershed.