All Projects

848 Results for
Recipient
Lincoln SWCD
2010 Fiscal Year Funding Amount
$90,125
Fund Source

Over the years, the landscape of the Yellow Medicine Watershed has changed through drainage and loss of wetland areas. The Soil and Water Conservation Districts of Lincoln, Lyon and Yellow Medicine counties work cooperatively with the Yellow Medicine River Watershed District to oversee implementation of conservation practices in this watershed. Based on previous Clean Water Partnership diagnostic studies, it is known the river is receiving an excessive loading of nutrients, phosphorus and suspended solids. These conditions have led to declining dissolved oxygen levels as a result.

Lincoln
Recipient
York Township
2011 Fiscal Year Funding Amount
$21,858
Fund Source

Evaluate alternatives to fix failing septic systems in unsewered area

Fillmore
Recipient
Washington Conservation District
2011 Fiscal Year Funding Amount
$5,618
Fund Source

This project will collect water quality data at Zavoral Creek over a two year period.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$59,532
Fund Source

In previous phases of work, a Hydrologic Simulation Program FORTRAN (HSPF) model of the Zumbro River Watershed was developed to simulate hydrology and water quality for the 1995-2009 simulation period (Phase I), applied to evaluate various management scenarios for reducing sediment and nutrient loading (Phase II), and used to develop Total Maximum Daily Loads (TMDLs) for impaired stream segments and inform development of a nutrient TMDL for Rice Lake (Phase III).

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
Olmsted Soil and Water Conservation District
2023 Fiscal Year Funding Amount
$89,448
Fund Source

Olmsted Soil and Water Conservation District (SWCD) will work in coordination with Goodhue SWCD, Wabasha SWCD, and Dodge County Environmental Services to collect water quality and chemistry parameters on 23 MPCA approved sites within the Zumbro River watershed during the 2023-24 sampling season.

Dodge
Goodhue
Olmsted
Wabasha
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$75,027
Fund Source

The Zumbro River watershed HSPF model will be refined to include recent data and information as well as evaluate various management scenarios to inform the most effective actions for reducing sediment and nutrient loading and improving water quality. Specifically, to provide the foundation for the Lake Zumbro Phosphorus Total Maximum Daily Load (TMDL).

Winona
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
Zumbro Watershed Partnership Inc
2018 Fiscal Year Funding Amount
$10,600
Fund Source

This project will build upon the outreach and education efforts of the Zumbro Watershed Restoration and Protection Strategy (WRAPS). The targeted area will be residents of the Zumbro River Watershed, specifically individuals and organizations that are not professionally involved in managing natural resources. This project will provide necessary outreach and education during the interim between the Zumbro WRAPS and beginning the One Watershed, One Plan process.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha