All Projects

823 Results for
Recipient
Le Sueur County
2015 Fiscal Year Funding Amount
$325,240
Fund Source

The goal of the Lake Volney Targeted Restoration project is to improve the water quality draining to Lake Volney, which is impaired for excess nutrients. The project contains eight priority areas and will install a variety of Best Management Practices, including stormwater basins, ag retention, wetland enhancement, and more.

Le Sueur
Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Dakota
Goodhue
Scott
Wabasha
Recipient
Rice Creek Watershed District
2010 Fiscal Year Funding Amount
$110,200
Fund Source

This project will repair and upgrade the water control structure and provide water quality enhancement measures on Oasis Pond in Roseville, Minnesota. This project will also protect the quality of downstream receiving waters; specifically Lake Johanna, by reducing phosphorus pollutant loads.

Anoka
Ramsey
Recipient
St. Croix River Association
2010 Fiscal Year Funding Amount
$500,000
Fund Source

This project will provide information about the amount and sources of phosphorous flowing into Lake St Croix by implementing additional water quality monitoring and reduce the amount of phosphorous flowing into Lake St Croix by implementing phosphorous reduction activities. The St Croix River Association (SCRA) will coordinate with the St. Croix Basin Water Resources Planning Team (Basin Team) on the identification and funding of comprehensive water monitoring and phosphorus reduction activities in the Lake St. Croix portion of the St.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$48,667
Fund Source

The goal of this project is to finalize the draft Lake Pepin Total Maximum Daily Load (TMDL) Report, issue it for public comment, address comments, and finalize the report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae. High levels of sediment, carried in by major river systems, also affect the lake. The sediment is filling in the lake at a much faster rate than before Minnesota was settled and intensely farmed. Nutrients and sediment are distinct yet inter-related pollutants, and are being addressed in separate TMDL reports.

Dakota
Goodhue
Scott
Wabasha
Recipient
Limnotech
2011 Fiscal Year Funding Amount
$49,980
Fund Source

This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Ramsey Conservation District
2013 Fiscal Year Funding Amount
$57,420
Fund Source

Lambert Creek is wholly within the Vadnais Lake Area Water Management Organization (VLAWMO) and is located in northeastern Ramsey County. Lambert Creek is surrounded by mainly residential land use and flows through three communities before discharging into East Vadnais Lake, which is the final impoundment reservoir containing the water supply that the Saint Paul Regional Water Services (SPRWS) treats and then distributes to thirteen municipalities including the city of St. Paul.

Ramsey
Recipient
Ramsey Conservation District
2015 Fiscal Year Funding Amount
$59,766
Fund Source

Past and current monitoring data has shown Ramsey County's Lambert Creek has high levels of total phosphorus (TP), anywhere from 0.14 mg/L to 0.30 mg/L, which is above the proposed State standard of 0.10 mg/L for streams in the Central Region.

Ramsey
Recipient
Capitol Region WD
2019 Fiscal Year Funding Amount
$150,000
Fund Source

Capitol Region Watershed District and the City of Lauderdale seek to improve water quality and flood control functions of Seminary Pond in Lauderdale. The project partners propose improvements to the pond including: 1) expansion of the pond?s storage area and 2) construction of an iron-enhanced sand filter. These improvements were identified as being the most cost-effective and will remove an estimated additional 2 tons of sediment and 9 pounds of phosphorus annually.

Ramsey
Recipient
Minnesota State University-Mankato
2011 Fiscal Year Funding Amount
$137,787
Fund Source

This project will initiate the process of community engagement in the LeSueur River watershed by assessing the needs and interests of the community and bringing a diverse set of stakeholders together to determine how best to foster action in improving and protecting water quality.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
United States Geological Survey (USGS)
2023 Fiscal Year Funding Amount
$150,000
Fund Source

Minnesota Departments of Information Technology Services (MNIT) and Minnesota Pollution Control Agency (MPCA) are partnering with the United States Geological Survey (USGS) to acquire high-resolution digital elevation data developed from airborne lidar (Light Detection and Ranging) for the Minnesota River East and West regions. The data will be used to generate Digital Elevation Models (DEMs) for use in engineering design and design reviews, conservation planning, research, delivery, floodplain mapping, and hydrologic modeling utilizing lidar technology.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Faribault
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Martin
Nicollet
Pope
Redwood
Renville
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Lincoln Pipestone Rural Water
2017 Fiscal Year Funding Amount
$4,708,002
Fund Source

Connect to Lewis & Clark to reduce discharge of chlorides

Lincoln
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$59,116
Fund Source

The MPCA has selected the Soil and Water Assessment Tool (SWAT) watershed model to simulate watershed hydrology and water quality to assess various restoration scenarios in the Little Cannon River watershed. The SWAT model is an important tool in developing an understanding of existing conditions and simulating conditions under various management scenarios to inform the development of implementation strategies and plans to restore and protect streams and lakes.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Minnehaha Creek WD
2019 Fiscal Year Funding Amount
$112,000
Fund Source

The goal of this project is to identify watershed and in-lake best management practices (BMPs) to improve water quality for impaired water bodies within the Upper Long Lake Creek subwatershed. The existing P8 watershed model and BATHTUB lake response models will be updated and refined to identify BMPs, develop project costs, and estimate nutrient load reductions. A feasibility report will be developed that outlines prioritized projects, estimated load reductions, and project costs to accelerate implementation.

Hennepin
Recipient
City of Medina
2012 Fiscal Year Funding Amount
$334,450
Fund Source

Lake Sarah is a regionally significant lake and currently suffers from excess phosphprus levels. Loretto Creek, located partially within the Cities of Medina and Loretto, is Lake Sarah's east tributary carrying approximately 269 pounds of phosphorus to the lake each year. This is a joint project between the Cities of Loretto and Medina developed for the Loretto ballfields to address this problem.

Hennepin
Recipient
Loretto, City of
2021 Fiscal Year Funding Amount
$299,502
Fund Source

Construct connection to Met Council regional system

Hennepin
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$156,977
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy (WRAPS) report to maintain and improve water quality for the St Louis River Watershed.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
Barr Engineering Co
2019 Fiscal Year Funding Amount
$2,498
Fund Source

This project will revise a recently completed draft Total Maximum Daily Load (TMDL) report for the Lower Minnesota River Watershed Project. The revision is to correct wasteload allocations for regulated stormwater entities.

Carver
Hennepin
Recipient
Rice Creek WD
2019 Fiscal Year Funding Amount
$568,104
Fund Source

The Rice Creek Watershed District is proposing to improve water quality and habitat in Locke Lake and Lower Rice Creek by stabilizing stream banks and bluffs on Lower Rice Creek, reducing in-stream erosion and sediment delivery to Locke Lake, and improving in-stream habitat complexity for fish and invertebrates. Eleven bank stabilization practices would be installed over a continuous 5,400-foot reach in Lower Rice Creek. The anticipated outcome of this project is the prevention of 2,874 tons per year of sediment, which is 58% of the sediment reduction goals for Lower Rice Creek.

Anoka
Ramsey
Recipient
Southeast SWCD Technical Support Joint Powers Board
2017 Fiscal Year Funding Amount
$0
Fund Source

The Lower Mississippi River Feedlot Management in MN project will be leveraging State funding from BWSR to provide match for a United States Department of Agriculture Natural Resources Conservation Service (USDA-NRCS) Regional Conservations Partners Program (RCPP). BWSR will provide technical and financial assistance to plan and design projects to mitigate feedlot runoff from smaller (less than 300 animal units or AUs*), open lot feedlots in southeastern Minnesota.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Barr Engineering-Minneapolis
2016 Fiscal Year Funding Amount
$53,994
Fund Source

The goal of this project is to develop draft Total Maximum Daily Load (TMDL) computations for six impaired lakes and two impaired streams, and to provide TMDL development documentation for selected draft TMDL report sections.

Carver
Hennepin
Recipient
Le Sueur County
2017 Fiscal Year Funding Amount
$32,000
Fund Source

This project will plan, implement, and report on a community engagement strategy for identifying community/landowner opportunities, obstacles, and opinions on land management and water quality that will result in the identification of Watershed Restoration and Protection Strategies (WRAPS) input for the Sibley, Nicollet, Renville, McLeod, Rice, and LeSueur County areas of the Lower Minnesota River watershed.

Le Sueur
Rice
Recipient
Sibley County
2017 Fiscal Year Funding Amount
$135,000
Fund Source

The project will plan, implement, and report on a community engagement strategy for identifying community/landowner opportunities, obstacles, and opinions on land management and water quality that will result in the identification of Watershed Restoration and Protection Strategies (WRAPS) input for the Sibley, Nicollet, Renville, McLeod, Rice, and Le Sueur County areas of the Lower Minnesota River watershed.

Le Sueur
McLeod
Nicollet
Renville
Rice
Sibley
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$240,207
Fund Source

This project will be part of a second phase to develop Total Maximum Daily Load (TMDL) studies for several lakes and streams in the watershed.

Carver
Le Sueur
McLeod
Nicollet
Rice
Scott
Sibley
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$67,039
Fund Source

This project addresses six lakes that have aquatic recreation impairments and one creek reach that has a bacteria impairment for E. coli. The project will evaluate the water quality impairments, complete pollutant source assessments, and establish loading capacities and allocations for the impairments.

Hennepin
Recipient
Lac qui Parle-Yellow Bank WD
2023 Fiscal Year Funding Amount
$623,429
Fund Source
Lac qui Parle
Lincoln
Yellow Medicine
Recipient
Mantorville, City of
2018 Fiscal Year Funding Amount
$1,875,338
Fund Source

Regionalize wastewater treatment system with Kasson to meet TMDL wasteload allocation

Dodge
Recipient
Mantorville, City of
2011 Fiscal Year Funding Amount
$277,760
Fund Source

Extend sewer to unsewered area

Dodge
Recipient
Metropolitan Council/Minnesota Geological Survey
2011 Fiscal Year Funding Amount
$23,181
2012 Fiscal Year Funding Amount
$27,850
Fund Source

On behalf of the Metropolitan Council, the Minnesota Geological Survey evaluated the vulnerability of glacial aquifers in the Twin Cities metropolitan area. The project improved upon previous vulnerability assessments by incorporating a substantial amount of new aquifer property information and blending methods previously used by the Minnesota Departments of Health and Natural Resources. The result is a consistent vulnerability assessment across the metropolitan area based on the most up-to-date information available.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Ramsey-Washington Metro Watershed District
2012 Fiscal Year Funding Amount
$625,000
Fund Source

The Kohlman Lake nutrient reduction study identified a major source of phosphorus loading from the impervious areas like roads, roofs and parking lots within the watershed.. Within this area, one major land use feature stands out - Maplewood Mall. Retrofitting the Mall parking areas to infiltrate at least one inch of stormwater runoff will result in a large reduction in phosphorus to Kohlman Creek and the lake.

Ramsey
Recipient
Ramsey Washington Metro Watershed District
2010 Fiscal Year Funding Amount
$500,000
Fund Source

The Kohlman Lake TMDL calls for the reduction of nutrients from watershed and in-lake loading. A major source of phosphorus loading is from the impervious areas in the District (roads, interstates, roofs, and parking lots). In the analysis of the Kohlman Lake watershed, one major land use feature stands out - Maplewood Mall. The District identified that retrofitting the Mall parking areas to infiltrate at least one inch of runoff would result in a large reduction in phosphorus to Kohlman Creek and the lake.

Ramsey
Recipient
Minnehaha Creek Watershed District
2013 Fiscal Year Funding Amount
$321,945
Fund Source

The Master Water Stewards (MWS) program will install pollution prevention projects on both residential and commercial properties and educate citizens in their neighborhoods to reduce urban runoff and nutrient loads. Community leaders who have been identified, educated and certified as Stewards, will lead projects.

Hennepin
Recipient
Capitol Region WD
2023 Fiscal Year Funding Amount
$950,000
Fund Source

Capitol Region Watershed District and the City of St. Paul seek to improve the water quality of stormwater runoff to Como Lake in St. Paul and reuse stormwater to displace potable water use at the McMurray Fields complex within Como Regional Park. The project partners propose the construction of a stormwater reuse and infiltration system that will treat the stormwater volume equivalent of 1.1 inches over the impervious surface of the subwatershed, or 4.9 acre-feet. The drainage area to the proposed system is 130 acres, with 54 acres of impervious surfaces.

Ramsey
Recipient
Shingle Creek WMC
2021 Fiscal Year Funding Amount
$153,510
Fund Source
Hennepin
Recipient
Shingle Creek WMC
2021 Fiscal Year Funding Amount
$40,000
Fund Source
Hennepin
Recipient
Bassett Creek WMC
2022 Fiscal Year Funding Amount
$300,000
Fund Source
Hennepin
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2019 Fiscal Year Funding Amount
$200,000
Fund Source

It is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications. The Metro Conservation District?s (MCD) Sub-Watershed Analysis (SWA) program provides these capacity-building services and unites efforts across 11 SWCDs. MCD proposes to analyze an additional 15 subwatersheds. The analyses will identify the location and estimated cost/benefit relationship for BMPs, evolve with new technology, and share discoveries metro-wide.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Metro Conservation Districts
2012 Fiscal Year Funding Amount
$216,181
Fund Source

Through a long standing partnership, this project will continue to implement a process formalized with a 2010 Clean Water Fund Grant to conduct stormwater sub-watershed assessments. The goal of the sub-watershed assessments is to accelerate water quality improvements by focusing efforts in high priority areas. Specifically, subwatershed assessments are a tool used to identify the most effective urban stormwater conservation practice by location.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
2021 Fiscal Year Funding Amount
$0
2020 Fiscal Year Funding Amount
$0
2019 Fiscal Year Funding Amount
$0
2018 Fiscal Year Funding Amount
$0
2017 Fiscal Year Funding Amount
$0
2016 Fiscal Year Funding Amount
$0
2015 Fiscal Year Funding Amount
$0
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$1,000,000
2011 Fiscal Year Funding Amount
$4,000,000
Fund Source

This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Washington
Wright
Sherburne
Recipient
Metropolitan Council Environmental Services
2018 Fiscal Year Funding Amount
$176,657
2019 Fiscal Year Funding Amount
$123,343
2020 Fiscal Year Funding Amount
$238,500
Fund Source

The Minnesota Pollution Control Agency’s (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) forms the core of a long-term program designed to measure and compare regional differences and trends in pollutant loadings from Minnesota’s mainstem rivers and the outlets of major watersheds and subwatersheds draining to these rivers.

Hennepin