All Projects

823 Results for
Recipient
Wabasha SWCD
2019 Fiscal Year Funding Amount
$55,000
Fund Source

This project will educate and assist landowners to seal unused wells by providing cost-share funds of 50% up to $1,000 per well located in highly vulnerable groundwater areas in 10 southeast Minnesota counties. Groundwater is the primary source of drinking water and due to the karst geology in SE MN groundwater is more vulnerable to contamination.

Dodge
Fillmore
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Yellow Medicine County
2017 Fiscal Year Funding Amount
$20,000
Fund Source

The Yellow Medicine One Watershed One Plan has identified Protecting and Preserving Groundwater Quality and Quantity as one of the three priorities addressed in the Plan. Seven priority sub-watersheds have been identified as priority areas, as well as two townships that have been identified by the Department of Agriculture to have vulnerable groundwater areas. Our goal is to provide 50% cost share to seal 34 abandoned wells that are located in these priority areas.

Lac qui Parle
Lincoln
Lyon
Yellow Medicine
Recipient
Pioneer-Sarah Creek WMC
2023 Fiscal Year Funding Amount
$405,000
Fund Source

Whaletail Lake (MDNR 27-018400) is located within the jurisdictional boundaries of Pioneer-Sarah Creek Watershed Management Commission (PSCWMC). The lake is considered having two distinct basins relative to the Minnesota water quality nutrient standards with the South basin (MDNR 27-018402) classified as a deep lake (156 acres; max depth 23 feet; & 66% littoral) and the North basin (MDNR 27-0180401) classified as a shallow lake (370 acres; max depth 10 feet; & 100% littoral).

Hennepin
2017 Fiscal Year Funding Amount
$150,000
Fund Source

The DNR is directed by Minnesota Law 2016, Chapter 172, Article 2, Section 12 to request proposals for a potential design-build project to augment White Bear Lake with water from East Vadnais Lake.

Ramsey
Washington
Recipient
Whitewater River Watershed Project
2023 Fiscal Year Funding Amount
$30,000
Fund Source

Within Whitewater River Watershed, groundwater is the primary drinking water source for both private and community wells. These drinking water aquifers often lack adequate protective layers making them vulnerable to contamination. Unused wells can deteriorate and pose a serious risk to groundwater quality by providing a pathway for contaminants from the surface to easily travel into groundwater. This project will use cost-share funds to incentivize sealing twelve abandoned wells that are contamination risks to vulnerable aquifers.

Olmsted
Wabasha
Winona
Recipient
Whitewater River Watershed Project
2020 Fiscal Year Funding Amount
$191,550
Fund Source
Olmsted
Wabasha
Winona
Recipient
Wabasha SWCD
2022 Fiscal Year Funding Amount
$26,000
Fund Source

The WinLaC Prioritization and Public Participation Project will identify priority water quality issues and concerns for the watershed approach in the Mississippi River - Winona and La Crescent watersheds. Information obtained from this project will help develop the Watershed Restoration and Protection Strategy (WRAPS) Update report as well the WinLaC Comprehensive Watershed Management Plan.

Houston
Wabasha
Winona
Recipient
Root River SWCD
2023 Fiscal Year Funding Amount
$577,696
Fund Source
Houston
Olmsted
Wabasha
Winona
Recipient
Freeborn SWCD
2017 Fiscal Year Funding Amount
$32,766
Fund Source

This project will continue the development of a Pre-Watershed Restoration and Protection Strategy (WRAPS) assessment, evaluation, community outreach and involvement, and development project that will provide for a comprehensive and more successful watershed restoration approach.

Freeborn
Recipient
EOR
2020 Fiscal Year Funding Amount
$4,860
Fund Source

This project will produce a final Total Maximum Daily Load (TMDL) report and Watershed Restoration and Projection Strategy (WRAPS) reports for the Winnebago and Mississippi River – La Crescent watersheds including the drafting of public notice versions of the reports, responding to comments during the public notice period and producing the final TMDL and WRAPS reports.

Faribault
Freeborn
Houston
Winona
Recipient
Bassett Creek Watershed Management Commission
2011 Fiscal Year Funding Amount
$75,000
Fund Source

Wirth Lake is located in Theodore Wirth Regional Park in the City of Golden Valley. The lake was listed as Impaired due to excessive phosphorus levels. In recent years water quality goals were met except during instances where seasonal overflows from Bassett Creek into Wirth Lake occurred.With one relatively simple project, the Bassett Creek Watershed Management Commission anticipates that the excess phosphorus problem will be resolved once and for all.

Hennepin
Recipient
RESPEC
2023 Fiscal Year Funding Amount
$24,996
Fund Source

The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.

Chippewa
Douglas
Grant
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Otter Tail
Pope
Redwood
Renville
Stevens
Swift
Yellow Medicine
Recipient
Yellow Medicine River Watershed District
2020 Fiscal Year Funding Amount
$75,604
Fund Source

This project will monitor four lakes and 18 stream sites within the Yellow Medicine River Watershed to collect surface water ‏quality data to determine the health of the watershed's streams and lakes and if they are in need of restoration or protection ‏strategies. The sites will be monitored according to the Minnesota Pollution Control Agency's (MPCA) Water Monitoring Standard Operating Procedures.

Lincoln
Lyon
Redwood
Yellow Medicine
Recipient
Yellow Medicine River WD
2014 Fiscal Year Funding Amount
$88,611
Fund Source

The Yellow Medicine River Watershed District will contract with the Water Resource Center at the Minnesota State University - Mankato to complete a Geographic Information System (GIS) terrain analysis for the watershed using recently completed LIDAR data in southern Minnesota. Analysis will concentrate on the impaired reaches of the Yellow Medicine River Watershed and its tributaries. This inventory will utilize the State of Minnesota LiDAR elevation datasets to create many datasets through the analysis of this elevation data.

Lincoln
Lyon
Yellow Medicine
Recipient
Lincoln SWCD
2010 Fiscal Year Funding Amount
$90,125
Fund Source

Over the years, the landscape of the Yellow Medicine Watershed has changed through drainage and loss of wetland areas. The Soil and Water Conservation Districts of Lincoln, Lyon and Yellow Medicine counties work cooperatively with the Yellow Medicine River Watershed District to oversee implementation of conservation practices in this watershed. Based on previous Clean Water Partnership diagnostic studies, it is known the river is receiving an excessive loading of nutrients, phosphorus and suspended solids. These conditions have led to declining dissolved oxygen levels as a result.

Lincoln
Recipient
Washington Conservation District
2011 Fiscal Year Funding Amount
$5,618
Fund Source

This project will collect water quality data at Zavoral Creek over a two year period.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$59,532
Fund Source

In previous phases of work, a Hydrologic Simulation Program FORTRAN (HSPF) model of the Zumbro River Watershed was developed to simulate hydrology and water quality for the 1995-2009 simulation period (Phase I), applied to evaluate various management scenarios for reducing sediment and nutrient loading (Phase II), and used to develop Total Maximum Daily Loads (TMDLs) for impaired stream segments and inform development of a nutrient TMDL for Rice Lake (Phase III).

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
Olmsted County Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$23,441
2020 Fiscal Year Funding Amount
$5,327
2021 Fiscal Year Funding Amount
$4,772
2022 Fiscal Year Funding Amount
$75,564
Fund Source

2019: The Olmsted County Soil and Water Conservation District will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations at four sub-watershed sites in the Zumbro River Watershed. Approximately 25 grab samples per site between ice-out and October 31 of 2019 will be collected along with field measurements and observations.

Olmsted
Wabasha
Recipient
Zumbro Twp
2018 Fiscal Year Funding Amount
$60,000
Fund Source

Evaluate alternatives to fix failing septic systems in unsewered area

Wabasha
Recipient
Zumbro Twp
2024 Fiscal Year Funding Amount
$1,500,000
Fund Source

Construct sewer collection system and treatment to meet TMDL wasteload allocations

Wabasha
Recipient
Olmsted Soil and Water Conservation District
2023 Fiscal Year Funding Amount
$89,448
Fund Source

Olmsted Soil and Water Conservation District (SWCD) will work in coordination with Goodhue SWCD, Wabasha SWCD, and Dodge County Environmental Services to collect water quality and chemistry parameters on 23 MPCA approved sites within the Zumbro River watershed during the 2023-24 sampling season.

Dodge
Goodhue
Olmsted
Wabasha
Recipient
Zumbro Watershed Partnership Inc
2018 Fiscal Year Funding Amount
$10,600
Fund Source

This project will build upon the outreach and education efforts of the Zumbro Watershed Restoration and Protection Strategy (WRAPS). The targeted area will be residents of the Zumbro River Watershed, specifically individuals and organizations that are not professionally involved in managing natural resources. This project will provide necessary outreach and education during the interim between the Zumbro WRAPS and beginning the One Watershed, One Plan process.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha