Update website with information about well management, turf management and WHP plan; Educate property owners about pollution prevention and BMP; Educate owners of storage tanks about spill prevention
Identify and investigate unverified PCSI sites; Update the verified PCSI; Update City website with information on wellhead protection; Monitor for locations of shallow disposal wells within the DWSMA
Locate and seal unused wells: Identify wells in the DWSMA, Mail survey to properties with known or suspected wells, Tabulate surveys and follow up with property owners, Seal well that poses highest threat.
This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.
The project will realign portions of the creek in its historical channel, restoring its meander pattern and in-stream habitat by using bioengineering techniques. The techniques included root wads and biologs for streambank protection, vegetated reinforced soil stabilization for streambank stabilization, boulder rock vanes for grade control and in-stream flow control, and constructed riffles and pools for in-stream habitat.
Phase I built the foundation for the South Fork Crow River Watershed Restoration and Protection Strategy (WRAPS) and created a civic engagement plan. Civic engagement strategies were identified to create greater communication and watershed activities. Phase II provided the analytical and strategic foundation essential to prescribing protection and restoration strategies. These strategies focus on both protecting current fully supporting and restoring impaired surface water resources to water quality standards in the South Fork watershed.
This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.