Well construction
Use landscape boulders to provide a protective barrier to the well.
Public Outreach with tanks. Public Outreach with wells. Public Outreach with ISTS.
Seal 5-10 wells.
Hire engineer/consultant for a new well.
Provide educational materials about wells in Story Map. Provide educational materials to residents about potential contaminants. Utilize local organizationresources to improve public education to residents.
Prep work for installing back-up generator including pad, electrical wiring, and transfer switch.
Full replacement of security system infrastructure (cameras, switches, transmitters, connectivity, software)
Convert emergency power generator to a natural gas generator and have gas main extended approx. 300' to connect to the generator.
Seal well #3.
Seal unused wells.
Purchase and install generator (Phase 2)
Update drawdown equipment; Inspect private wells within the DWSMA
Connect to City of Faribault water system; Abandon existing well
Educational groundwater/wellhead exhibit
Educational exhibit; evaluate septic system; sorbent material for hazardous spills
Abandon 2 domestic water wells
Public education ; Tank survey
Install security cameras for the surveillance of wells #5 and #6 at the Water Treatment Plant #1 location
Update contaminant source inventory; public education
Stream bank restoration
Educational exhibit; backflow preventers; spill kit
Phase 2 Whitaker Project: slope protection at Whitaker Pond
Educational groundwater/wellhead exhibit; build barrier to protect wellhead
Training programs for LPRW staff ; data collection devices; update PCSI
Connection to city water
Ed. materials for source owners and public ed.
Signage, test Spring Creek, emergency manual
Geological study to evaluate the source water aquifers in the area of the City of Rogers
Install cameras at well houses for wells 4, 5, 6
Identify and map contaminants; public education