Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
This project saw the electrification of 20 campsites in Cascade State Park. RV camping is extremely popular, and the North Shore has very few electrified campsites within our state park system. These new electric sites satisfy some of the incredible demand for this amenity.
Pileated Woodpeckers are keystone habitat modifiers that support an array of game, non-game, and conservation concern species. Additional information is needed to understand cavity dynamics for these species.
To acquire professional services that will write a cultural landscape report for the Chik Wauk Lodge, listed in the National Register of Historic Places, preparatory to future historic preservation projects
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to:
Improving stormwater management in Grand Marais is a priority for the community. The Cook County Comprehensive Water Plan identifies water quality and quantity concerns related to residential development include increased runoff from roads, parking areas, roofs, etc. into Lake Superior.
Rising temperatures and increased precipitation contribute to decreased oxygen and increased methane in Minnesota lakes and wetlands. We will identify impacts on water quality and methane emissions, providing management guidance.
Minnesota Trout Unlimited enhanced in-stream and riparian fish and wildlife habitat in and along coldwater streams and lakes located on public lands and Aquatic Management Areas. We originally proposed 11 projects, yet completed 13 projects. Contracting efficiencies and leveraging of other funding allowed us to add three more habitat enhancement projects in northeast Minnesota and to lengthen others. One small budget project was dropped when a partner changed the scope from 144 acres to less than 15 and proposed costs outweighed the potential benefit.