Drill well to inspect well casing integrity and if casing passes inspection, well to be treated and new hand pump installed. OR Drill well to inspect well casing integrity and the casing fails the inspection. Drill a new well, install new hand pump and se
Add WHP information on City website; Include WHP strategies and actions in the City newsletter; Move leaf composting site from the 1-year TOT area; Survey and well inventory; Survey shallow disposal wells; Training about BMP in the DWSMA
Imminent Health Threat (IHT) systems are those that are discharging improperly treated human waste onto the ground surface or into surface waters. In addition to the potential water quality impacts, untreated sewage has the potential to introduce bacteria and viruses into the environment. When IHT systems are identified, county or city staff assist the homeowners through the process required to bring their systems into compliance with the septic ordinance.
This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake.
This project will include stream monitoring of six preselected sites from the Leech Lake Watershed (HUC 07010102) and Pine River Watershed (HUC 07010105). The sites will be monitored for chemical, physical and biological parameters for two years.
This project will collect water quality data for 13 Hubbard County lakes located in the Crow Wing priority watershed and identified as priority lakes by the MPCA. Upon completion the project data set will include all of the necessary information for the lakes to be assessed for impairment due to nutrients. Volunteers will collect samples from 7 of the 13 lakes and paid SWCD staff will collect samples from 6 of the lakes that do not have public access or volunteers willing to sample. The water samples will be collected 5 times/year June-September in 2010 and 2011.
The Crow Wing County (CWC) Water Plan identifies Island-Loon Lake as a priority lake to enhance due to its significant decline in water clarity and high ratio of impervious surface surrounding the lake. To mitigate the runoff, the Crow Wing Soil and Water Conservation District will partner with the CWC HWY Department, City of Crosslake, Crosslakers, and Whitefish Area Property Owners Association to install three mechanical separators and 13,500 square feet bioretention area that will reduce six pounds of phosphorus and 1 ton of sediment per year from entering the lake.
A new GIS technician will help prioritize and target conservation activities and protection strategies in nine north-central Minnesota counties. The GIS technician will create GIS products, assessments, and watershed analysis to identify the high priority areas in each County or watershed in need of protection or restoration using all available data, including LiDAR, soils, land use, completed WRAPS and other datasets. These areas will then be targeted for future resource management efforts, Clean Water Fund projects, and additional conservation activities.
The goal of this project is to conduct water quality monitoring at the ten lakes within the Todd County portions of the Mississippi River Brainerd and the one lake within the Todd County portion of the Mississippi River Sartell. Sampling will be done once per month between May 2016 and September 2016 and then again once per month May 2017 through September 2017.
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The main outcome of the project will be the development of a Total Maximum Daily Load (TMDL) study that address total suspended solids/turbidity impairments of the Mississippi River (Swan River to Crow Wing River). Community outreach to communicate the results and strategies for restoration will also take place during this project.
The main outcome of the project will be development of a Total Maximum Daily Load (TMDL) study that address total suspended solids/turbidity impairments of the Mississippi River (Swan River to Crow Wing River). Community outreach to communicate the results and strategies for restoration will also take place during this project.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
Crow Wing County is pursuing this grant to continue this proven community and landowner outreach campaign by developing new water planning tools and using print and social media strategies to effect a positive change in our watersheds. The County believes that landowners want to do the right thing and has the data to show that when doing the right thing can be presented in customer-focused, fact-driven, easy-to-understand format, they get engaged and conservation gets done!
Trained staff will help assure the water chemistry data that is collected is of good quality. After the 1 day training events participants will be able to calibrate sonde water quality monitoring sensors in a lab or field setting, deploy the calibrated sonde to collect water chemistry, store sondes properly during non-field season and perform preventative maintenance or simple troubleshooting actions with the help of tech support. This will be satisfied by two different training events held in 2017.